Question to the Department for Energy Security & Net Zero:

To ask the Secretary of State for Energy Security and Net Zero, pursuant to the answer of 17 December 2024 to question 19898 on Wind Power: Fylde, what account the cost assessments have taken of existing infrastructure connecting Stanah to Penwortham.


Answered by
Michael Shanks Portrait
Michael Shanks
Parliamentary Under Secretary of State (Department for Energy Security and Net Zero)
This question was answered on 20th December 2024

National Energy System Operator (NESO) recommended the transmission infrastructure required to connect Morgan and Morecambe offshore wind projects to the grid as part of its Holistic Network Design (HND). In producing the HND, NESO assessed multiple onshore and offshore design options against future generation and demand scenarios, existing infrastructure in the National Electricity Transmission System, and total capital and operational costs. NESO then used an economic optimiser to determine the optimal economic design from the options.

Reticulating Splines