Floods: Victoria Tower Gardens

(asked on 9th March 2021) - View Source

Question to the Department for Environment, Food and Rural Affairs:

To ask the Secretary of State for Environment, Food and Rural Affairs, what long term estimates his Department has made of the level of risk of flooding in the proposed Holocaust Memorial and Learning Centre site in Victoria Tower Gardens from a potential (a) breach of river wall or (b) overtopping of the river wall if water levels were to rise as a result of global warming.


Answered by
Rebecca Pow Portrait
Rebecca Pow
This question was answered on 12th March 2021

a) The Flood Risk Assessment required under paragraph 163 of the National Planning Framework, together with other associated assessments submitted by the applicant, has satisfactorily demonstrated that the integrity of the flood defence can be maintained throughout construction. This is subject to the actions of a detailed monitoring plan outlined within the application.

b) The applicant has demonstrated, through design and loading calculations, that the proposal will not preclude the requirement to raise the flood defences in the future as required by the Thames Estuary 2100 Plan.

It should be noted that while it may be impacted by this proposal, the flood defence is outside of the application boundary and will require cooperation between the applicant and the riparian owner to ensure that a continuous defence is maintained at all times.

Reticulating Splines