High Speed 2 Railway Line

(asked on 14th October 2015) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, for what reasons the objection in the Euston Area Plan on prioritising local people's needs adopted by the London Borough of Camden, the Mayor of London and Transport for London in January 2015 is not referred to in the Supplementary Environmental Statement for High Speed 2.


Answered by
Robert Goodwill Portrait
Robert Goodwill
This question was answered on 22nd October 2015

HS2 Ltd deposited an Additional Provision (AP3) to the HS2 Phase One hybrid Bill and a Supplementary Environmental Statement (SES2) on 16 September 2015. AP3 and SES2 include revised plans for London Euston station.


SES2 reports on the likely significant environmental effects of updated environmental information and changes that are new but within the powers already being sought under the Bill and within the limits described in it. Changes that go beyond the existing powers and limits described in the Bill are contained in AP3.


The purpose of SES2 however is not to consider objections to the proposed changes; these are considered through the relevant consultation and petitioning processes.