Question
To ask the hon. Member for Blaenau Gwent and Rhymney, representing the Restoration and Renewal Client Board, with reference to the proposals relating to temporary accommodation within Richmond House, what assessment the Client Board has made of the necessity of constructing a new purpose-built Chamber facility within Richmond House in circumstances where the House of Commons may ultimately decide not to utilise it; what proportion of the projected costs of phase one works relate to Chamber-capable infrastructure in Richmond House; whether alternative lower-cost temporary arrangements were formally assessed; and what estimate has been made of the sunk cost risk should that facility not be required.
Under full decant a temporary Chamber would be provided in Richmond House, which Members would decant to and which would enable the House to operate much the same as it does now. Under other delivery options the provision in Richmond House would be to provide space for a resilience Chamber, a place that could be used, for example, as a consequence of any intolerable or unplanned disruption during the R&R works (and could be used for other purposes when not needed as a resilience chamber). It was therefore deemed necessary under all approaches.
The costs that are driven by the need for a temporary (or resilience) chamber as part of the R&R Programme accounts for 13% of phase one works costs. This is set out in chapter 7 of the R&R Client Board’s recent report, Delivering restoration and renewal of the Palace of Westminster: the costed proposals (HC Paper 1576).
The use of the Northern Estate as a decant location for the House of Commons was re-confirmed in the R&R Client Board’s Strategic Case in March 2024. This location has been consistently identified in numerous reviews and studies as the most suitable location given it is part of the Parliamentary Estate and close to Whitehall, offers value for money, retains the Commons in the secure perimeter and is capable of meeting the House’s security requirements. Other relevant studies include the Joint Committee on the Palace of Westminster, First Report of Session 2016–17, Restoration and Renewal of the Palace of Westminster (HC 659) and the Parliamentary Works Sponsor Body and Delivery Authority, Restoration and Renewal Programme Strategic Review, March 2021.
Regardless of the R&R Programme, the Northern Estate requires refurbishment to ensure it meets modern parliamentary standards, which is being carried out under the Commons Buildings Infrastructure Portfolio. There will therefore be a legacy value to Parliament from the refurbishment of these buildings.