National Grid: Electric Cables

(asked on 13th January 2026) - View Source

Question to the Department for Energy Security & Net Zero:

To ask the Secretary of State for Energy Security and Net Zero, what assessment he has made of the potential merits of utilising disused water and gas pipes in the laying of new electrical cables as part of National Grid upgrades.


Answered by
Michael Shanks Portrait
Michael Shanks
Minister of State (Department for Energy Security and Net Zero)
This question was answered on 21st January 2026

Network operators are responsible for assessing and selecting the appropriate construction methods for new infrastructure.

The government has not undertaken an assessment of utilising disused pipes for the installation of new electricity cables but notes there are technical difficulties in using redundant pipes for electricity transmission, including the need to dissipate heat from electricity cables running through the pipes, means of access for maintenance and repair, the need to pass cables through the existing compressors and valves and, for AC cables, the need for power factor correction components.

In addition, redundant pipes are not always located where infrastructure is required.