Extend the deadline for Electrical Installation Condition Reports

The current deadline for Electrical Installation Condition Reports is April 2021. With the lockdown and tenants working from home or shielding, it's harder for contractors to physically enter the houses. The deadline therefore needs changing by 12 months or AT LEAST the end of 2021.

This petition closed on 12 Jul 2021 with 142 signatures


Reticulating Splines

You may be interested in these active petitions

1. Increase funding for Botox treatment for Sphincter of Oddi Dysfunction on NHS - 2,595 signatures
2. NHS funding for egg freezing, for those suffering from endometriosis. - 12,956 signatures
3. Keep the 5-Year ILR route for refugees. Do not extend it to 10 or 20 years - 52,725 signatures
4. Extend the NHS Learning Support Fund to fully include pharmacy students - 6,273 signatures
5. Amend the 28-day rule for the Carer’s Allowance for carers giving hospital care - 3,625 signatures

As a letting agent it's difficult to have all these electrical certificates completed in 9 months (July 2020 was the start date) especially when lockdowns keep stopping electricians from working. With staff on furlough for most letting agents it's difficult to even manage the work load never mind upcoming deadlines. Landlords already have pressure on them due to the rental shortage and the 6 month notice period. Please extend the deadline for Electrical Reports to April 2022 or December 31 2021.


Petition Signatures over time

Constituency Data

Reticulating Splines