William Wragg
Main Page: William Wragg (Independent - Hazel Grove)Department Debates - View all William Wragg's debates with the Department for Transport
(7 years, 9 months ago)
Commons ChamberI am grateful to you, Madam Deputy Speaker, and to Mr Speaker for granting this Adjournment debate on the need for the A6-M60 relief road. It is particularly appropriate that we debate the issue now, exactly 242 years to the week since residents in and around my constituency first made representations to the House calling for a similar road to relieve local congestion on what was then known as the London road, which is now the A6.
Records in the Library show that on 27 February 1775, a petition was presented to the House from
“the Inhabitants and Owners of Houses and Lands, within the Town and Township of Stockport…Setting forth, That the town of Stockport is very populous, and a Place of great Trade and Business”—
just as it is now—
“and the Inhabitants thereof, and Persons resorting thereto, suffer great Inconveniences…and that the great public Road from Manchester and other adjacent Towns, to the Metropolis, lies through the town of Stockport; and that several Streets and Passages, within the said Town, through which the said public Road runs, are too narrow, and are very incommodious.”
It was
“Ordered, That the…Petition be referred to the Consideration of a Committee”
and that a certain Mr Egerton and Mr Crew were to meet
“To-morrow Morning, at Nine of the Clock, in the Speaker’s Chamber”.
Quite what happened in the Speaker’s chamber the next day is anyone’s guess.
Fast forward nearly 250 years and the inhabitants of Stockport and surrounding towns—including Hazel Grove and Bredbury, both of which are in my constituency—are still suffering the inconveniences of incommodious roads that cause travel and commuting misery for tens of thousands of residents. Of all Greater Manchester boroughs, Stockport has the highest number of daily commuting movements in and out of the city of Manchester. The largest commuting flow between the districts is a broadly north-south movement between Stockport and Manchester, and the largest equivalent flow across the Greater Manchester boundary is a north-south movement between Cheshire and Stockport. Much of this traffic is made up of journeys that start or finish within the borough of Stockport, mostly either accessing local areas off the A6, or using the A6 to access the M60 and the wider motorway network.
More than 30,000 vehicles a day pass through the residential and commercial areas of Hazel Grove. On a daily basis, there are high volumes of slow-moving traffic. Average peak hour vehicle speeds are less than 10 mph. That makes the road network one of the worst congested, if not the worst, in the country. Journey times on this arterial route are longer than in all other large urban areas across the UK, including London. There are particular congestion problems along the A6 and in the urban centres, including Bredbury, Hazel Grove and Offerton. We are at the point where congestion is causing poor and unreliable journey times, and that is becoming a constraint to economic growth.
What is urgently needed, therefore, is a road between the M60 at Bredbury and the A6 at Hazel Grove, following the once proposed alignment for the A6(M). The A6-M60 relief road would remove unnecessary traffic from the A6 through Stockport and Hazel Grove, allow for better connection to the M60, and directly facilitate these two largest commuting movements to support the Greater Manchester economy.
Thankfully, there has been significant consideration of such a relief road since 1775. In 2000, the then Government undertook a thorough study into the travel and traffic issues facing the south-east quadrant of Greater Manchester, in partnership with Stockport Council and its neighbouring local authorities. The south-east Manchester multi-modal strategy—pithily known as SEMMMS—reported in September 2001. It recommended three new highway schemes, including the A6-M60 relief road. Since then, work is being undertaken on the first two schemes, supported by funding from a range of sources, not solely central Government: the new airport road is under construction; and the Poynton bypass is in its planning stages, with construction expected to start in 2018. The A6-M60 relief road is thus the final highway component of the SEMMMS strategy yet to be actioned.
I would like to outline briefly the design and benefits of the A6-M60 relief road scheme. If it is given the go-ahead, it will provide 5 miles of new two-lane 50 mph dual carriageway on a north-south route from junction 25 of the M60 at Bredbury to the A6 near Hazel Grove. It will also provide a short link road to improve access to Stepping Hill hospital.
It will come as no surprise to at least one Member of this House—namely, my hon. Friend the Member for Worthing West (Sir Peter Bottomley)—that the present scheme is very close in layout, route and objectives to an earlier proposal for a Stockport bypass, and this time that proposal is from a period during my lifetime, albeit when I was a mere 18 months old. Rooting through some old files, I came across a letter from one of my predecessors, Sir Tom Arnold, to a constituent. It declared:
“Go-ahead to End Traffic Chaos.”
Attached to it was a Department for Transport press release from June 1989, which quotes my hon. Friend, who was then the Minister for Roads and Traffic, as saying:
“Good road connections encourage industrial and economic expansion...This further investment for the North West and for South East Manchester will be a major help in encouraging the growth of enterprise.”
In his covering letter to his constituents, Sir Tom added:
“It is our firm conviction that the Bypass will have a profound and beneficial impact upon the future quality of life and the environment in Hazel Grove”—
I could not agree more. Construction of the A6(M) bypass around Stockport was due to begin in 1992; alas, it was never started. As we have seen that improvements to, or a bypass of, the A6 have been proposed in 1775, 1989 and again in 2001, we are now fully up to date with the history.
In the 2015 Budget, the Treasury granted £350,000 to undertake a contemporary review of the case for the road. Stage 1 of that feasibility study concluded that the travel and traffic congestion problems that existed at the time of the SEMMMS publication are more acute than ever. The study found that the A6-M60 relief road would bring about significant improvements in congestion, thereby not only making people’s lives easier, but bringing about significant economic benefits. By removing congestion from local roads, the scheme would also contribute towards enabling a better integrated public transport system by improving the reliability of bus journey times. Madam Deputy Speaker, I am sure that you, like other Members of the House, are still composing yourself after the thrilling excitement of yesterday’s Second Reading debate on the Bus Services Bill.
As well as considering direct local benefits, it is important to think about the road in its wider regional and national context, and the context of the Government’s overall aims. The scheme aligns with several national policy objectives. In recognition of the large increase in traffic on the strategic road network that is forecasted, Highways England is prepared to invest in local road infrastructure improvements that will help. The scheme would also provide improved access and more reliable journey times to Manchester airport not only for airline passengers, but for heavy goods vehicle freight. The scheme would therefore support the Government’s freight policy. Furthermore, providing better access to Manchester airport is identified as one of the key components of the northern powerhouse.
Regionally, the A6-M60 road would directly contribute to the delivery of two elements of the Greater Manchester transport strategy 2040: supporting sustainable economic growth; and improving quality of life. The scheme also forms part of the wider SEMMMS, as I mentioned, and would complement the two other road network schemes that are already under way. It is important to note that once the new airport link road is finished, the amount of traffic using the A6 is predicted to increase, which makes the need for the A6-M60 relief road ever more pressing.
I have outlined the benefits of the scheme as I see them, as supported by the feasibility study. However, I am aware that, as with any large infrastructure project, there are important environmental considerations, and a number of my constituents have sincerely held concerns about the environmental impact of the proposed road. I stress that I am not blind to these concerns; this is a major new road scheme that is set to run through some areas of countryside. However, I note that the 2003 environmental assessments found the wider SEMMMS to be acceptable in principle, subject to appropriate mitigation. The environmental impact should be fully examined as part of the process of progressing the business case, and it should accord with environmental protections and legislation. By relieving congestion, the new road would help the environment by improving air quality, which is currently affected by emissions from slow-moving and stationary traffic.
Population growth was identified as a factor in the feasibility study. I am clear that the road is required to deal with the already congested and overstretched infrastructure in the area. It should not be viewed as a catalyst or justification for the drive for excessive residential development that is envisaged in the Greater Manchester spatial framework.
In summary, the problems identified in 2001 are still present. Indeed, worsening traffic conditions mean that the need for intervention that was identified by the original SEMMMS is as great as ever. The scheme would address issues around peak hour congestion, air quality and connectivity. It would also increase the reliability of public transport. It is consistent with national, regional and local transport policies, and the growth aspirations of Greater Manchester and the national Government.
The Government have supported feasibility studies regarding the road up to this point. We now need the stage 2 study to develop a strategic outline business case for the scheme in line with Department for Transport guidance. Further work will be required, based on new traffic forecasts, to take account of the airport link road and environmental assessments, and I will work closely with Highways England on that.
Will the Minister confirm the Government’s commitment to investing in road infrastructure as a means of relieving existing congestion and driving economic growth? Does he appreciate and share my frustration, and that of local residents, about the length of time that the scheme has been in the proposal, draft and study stages, and the amount of appalling traffic, congestion, delays, inconveniences and pollution that people have had to put up with during that time? Can he suggest how I might best work with him and others to ensure that this project remains high on the agenda? Does he support progression to the stage 2 feasibility study for the business case? Will he give an indication of when the time for studies and reports may come to an end and the building of this vital and long-anticipated road can begin?
The case for this road has now been made and studied in three separate centuries—the 18th, 20th and 21st—and I am pleased to have been able to make the case yet again today. I hope that the time for studying will soon end and that the time for construction will begin. I look forward to the Minister’s answers, for both he and the Government should know that on this issue, much like the traffic in my constituency, I am not going anywhere.