(2 years, 8 months ago)
Commons ChamberMy hon. Friend makes an excellent point. The Government’s priority is to enable more of those journeys to be walked and cycled and for public transport to be used. Reference was made to the future of transport. We will introduce legislation on self-driving vehicles and so on, so we will see significant improvements in this area. As the Minister responsible for decarbonisation and the future of transport, I would be delighted to work with her to identify where the opportunities for better public transport and active travel may be.
If my hon. Friend the Member for Thurrock (Jackie Doyle-Price) had had more time, I think she would have made a point about why on earth all these freight trains carrying trucks from the continent offload at Folkestone. They should rumble on north. That is an absolute no-brainer and we should do that anyway.
Similarly, I would be delighted to meet my hon. Friend to discuss freight and how we might improve it, and I look forward to that meeting. As we have heard, the situation at the Dartford tunnel negatively impacts on communities and businesses locally, regionally and elsewhere in the UK. In view of those challenges, the need for the lower Thames crossing remains clear at this stage. In addition, the strategic importance of the Dartford crossing is increasing and now supports the change in working and shopping patterns in England.
Let me give the House some statistics. Some 42% of vehicles using the Dartford crossing are now goods vehicles, which has gone up from 33% in 2019. December 2020 saw the busiest day ever recorded for heavy goods vehicle traffic, which is now consistently above 2019 levels. Furthermore, that supports the point about the conversation that is needed with my hon. Friend and other Members about how we can improve the freight situation and put more of that freight on to the rail network.
The need to increase capacity east of London is greater than ever. That is exactly what the lower Thames crossing hopes to address.
This is the muddled thinking we have got to: if we build another crossing further down, it will take the pressure off Dartford. However, it will not take the pressure off Dartford because people will still want to use the Dartford crossing. Spending £8.2 billion to build that white elephant will not address the current problems at Dartford.
If people think it is a good idea at some point next year to have a crossing east of Gravesend, for economic development purposes and so on, I say “By all means do it”, but a bridge has to be built northbound at Dartford, because people are still going to use it. The M25 is still going to go through Dartford, and we will see exactly the situation to which my hon. Friend the Member for South Basildon and East Thurrock (Stephen Metcalfe) has referred. There will still be convoys going through twice an hour. There will still be oversized vehicles at red traffic lights, and hundreds of millions of people will still spend time stuck in traffic for the next three decades. I say, “Sort out Dartford, and then by all means build the crossing. My constituents will not be happy, but do Dartford first.”
No one could deny that my hon. Friend is passionate and frustrated, and knows his area incredibly well. I hope that the meeting with the roads Minister will happen swiftly so that he can make that point to her as well.
The lower Thames crossing will consist of the longest road tunnel in the UK, between north Kent and south Essex, and will include 14.3 miles of new road linking the M2/A2, A13 and M25. By almost doubling road capacity across the River Thames east of London, it will cut traffic using the Dartford crossing by 22%, and will provide national road freight with a reliable new connection.
My hon. Friend makes an excellent point, and I would be grateful to receive further details of the homes or specific communities he feels are affected. That would be much appreciated.
Since the preferred route was announced, and following the withdrawal of the development consent order in 2020, National Highways has continued to work extensively with stakeholders—including my hon. Friends, as we have heard today—to improve and refine the scheme. This has been part of a comprehensive programme of consultation, and in addition to the consultation in 2016, it has included four further consultations since 2018, with 26 consultation events in Gravesham, 100 across the whole project and more than 30,000 responses. I am pleased that Members have referenced their gratitude for the effort that has gone into the consultation.
There is more to come. A further targeted consultation will take place after the local elections in May to engage stakeholders and local residents and to ensure that they will have their views heard on the use of Tilbury Fields following the positive resolution of a land clash. This will be the fifth public consultation, showing that National Highways is continually listening to those impacted by the scheme to ensure that they benefit as much as possible. Further work with parliamentarians has resulted in 11 parliamentary forums designed to bring local and regional MPs together at key project milestones between the contact programme of one-to-one briefing meetings. The forum series started in 2017, with the most recent forum being held this month. As a result of the tireless work by everyone, in particular my hon. Friend the Member for Gravesham and the other Members who are in the Chamber tonight, National Highways has made several key changes in the constituency of Gravesham, including several requests that my hon. Friend put forward in an Adjournment debate in 2017 regarding the design and development of the lower Thames crossing.
On that point, can I pay tribute to my constituent and local councillor, Bob Lane, the chairman of the local parish council, for his extraordinary work on this?
I would also like to extend my gratitude on behalf of the Department to Councillor Bob Lane for his engagement.
In summary, the improvements that have been made include the removal of the A226 junction from National Highways’ proposals, limiting potential rat-running on local roads as well as reducing the overall footprint of newly proposed junctions. Also, the southern portals south of the A226 are being moved. Since 2017, National Highways has made significant changes to the lower Thames crossing design to limit its visual impact. The tunnel itself has been lengthened by around 1 km, and the route has been lowered or hidden behind earth bunds. Now, around 50% of the route in Gravesham is in the tunnel and 80% of the entire route is hidden from view, either in tunnels or cuttings or behind earth bunds.
To maximise the use of green corridors to reduce noise pollution and environmental impact, National Highways is planning to provide new or improved green spaces and pathways for communities in Gravesham to enjoy. This includes plans to build Chalk Park, a new 40 hectare green space in Gravesham that will provide a new public space for the local communities in Chalk and Riverview, including new landforms with views across the Thames estuary. It will also create a green buffer between those communities and the road, improve biodiversity through the planting of grassland and woodland, reuse significant amounts of excavated material from the construction route and reduce carbon and HGV journeys.
If I truly believed this was the right thing to address the congestion at Dartford and nationally, I would man up and say to my constituents, “I’m really sorry that your house will be blighted by all this noise.” I would do that, but I do not believe this is the right thing to do. Whatever happens, we will have to go back and build a bridge at Dartford because the M25 runs through Dartford.
I thank my hon. Friend for his intervention.
There are 20 km of new or improved pathways for walkers, cyclists and equestrians. There are three new green bridges, one of which is 84 metres wide—one of the largest in Europe—connecting this network of pathways to the area’s rich mosaic of parks and woodland.
Members have expressed their discontent with the proposed road—that is loud and clear—and, straight after this Adjournment debate, I will reflect that to the roads Minister. As everyone has agreed, there is a clear need to address the challenge at Dartford crossing, and the lower Thames crossing aims to relieve congestion and provide resiliency to the strategic road network.
I am sure all hon. Members agree that we must plan not just for the short term but for the medium and long term.