High Rise Social Housing: Reducing Fire Risk

Tony Lloyd Excerpts
Tuesday 14th September 2021

(3 years, 3 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tony Lloyd Portrait Tony Lloyd (Rochdale) (Lab)
- Hansard - -

May I say what a real pleasure it is to serve under you in the Chair today, Ms Rees? I also thank my hon. Friend the Member for Hammersmith (Andy Slaughter) for a genuinely excellent speech, both in its range and its detail. I do hope that the Minister—I say this kindly to him—will dwell on every word, even if he cannot respond to every word today.

I want first to pick up on the important point that my hon. Friend made about the impact of this new generation of costs on social landlords and, indeed, on landlords more generally, because these extra costs were unanticipated. Whether rightly or wrongly, they were unanticipated; they are not built into any cost programme. And certainly at the margins they would make a material difference in terms of the capacity for social landlords to make a decision, as is the case at the moment with tower blocks in my constituency, between demolition, which the social landlord would like, and retention and improvement, which the tenants of those tower blocks would want. If the extra cost is of such a nature that it causes these things to tick over, it is the wrong kind of financial matrix for housing policy. Equally, my hon. Friend is right when he says that if now we see huge tranches of money having to be devoted to remediation and that then is at the cost of improvement and new build, we simply exacerbate what is already a housing crisis in my constituency and across the country.

I shall take a couple of moments to discuss the Seven Sisters tower blocks in Rochdale. Sometime in the early part of last year the housing association discovered, because it was able to do work or investigation not previously available to it, that unlike Grenfell and equivalent types of cladding, there was a problem in the nature of work that had been done, probably in the late 1990s, that meant that any fire in any individual flat risked spreading to flats on the same floor. That kind of risk was, again, unanticipated, but it is qualitatively different from the situation at Grenfell and other places.

I have a very specific question for the Minister. Is any information available about the range of such challenges to our housing stock? Do we have that analysis—that national picture? I ask because of course that must inform any debate about what is available in terms of funding the remediation work necessary. Equally, because this is qualitatively different, as we look at remediation for cladding solutions—and, post Grenfell, we must look at that—will that also cover problems of the type that arose in Rochdale with the Seven Sisters? Again, that is different; nevertheless, the work is equally vital, if we are to ensure that tenants and residents feel safe in their homes.

When that was discovered, the social landlord quite rightly introduced a waking watch scheme, in negotiation with the fire and rescue service in Greater Manchester. That is a system whereby people tour the estate to ensure an evacuation if a fire is identified, and to enable the fire and rescue service to take the necessary action. That did happen: a fire broke out in the tower blocks, sometime after 2 o’clock one morning. The fire service was there within four minutes of being informed by the waking watch, which is excellent. The system worked, leading to the evacuation of a small number of tenants, and it put people’s safety first, which is the right and proper way.

Since then, the social landlord has installed an alarm system in every flat, which again is the right way forward. However, in the end, this is about evacuation in the event of fire rather than prevention of fire. I endorse the comments of my hon. Friend the Member for Hammersmith and others about the need to maintain or improve electrical standards. Certainly, the operation of sprinklers is one demand that people would inevitably have, but fires will take place. My own mother, rather sadly, caused her own house to catch fire. She was a heavy smoker, she dropped her cigarette, and the result was a house fire—in her case, not with the kind of results that we would fear. Nevertheless, that kind of action will take place in the future. We cannot guarantee that we can stop fires; we have to make sure, though, that the homes that our residents live in are safe, because safety is paramount.

My final question to the Minister is simply this. Four years on from Grenfell, what progress can we expect in the coming months that will make a material difference, so that the residents in my tower blocks and those up and down the country can see their homes as a place of safety? That is what they expect, it is what I expect for them, and it is what every Member of this House should believe is right and proper.

--- Later in debate ---
Luke Hall Portrait The Minister for Regional Growth and Local Government (Luke Hall)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairpersonship and to be back in Westminster Hall, Ms Rees. I thank the hon. Member for Hammersmith (Andy Slaughter) for securing this important debate; he gave an incredibly thoughtful, forensic and detailed speech that really showed his passion for the issue. I also thank the other Members who have spoken—there have been some really thoughtful, important contributions.

This issue impacts so many of our constituents. That is why we are taking action, as has been described, by providing that £5 billion of grant funding for the remediation of unsafe cladding, to support building safety. The hon. Gentleman noted at the start that the Minister for Housing, my right hon. Friend the Member for Tamworth (Christopher Pincher), and the Minister for Rough Sleeping and Housing, my hon. Friend the Member for Walsall North (Eddie Hughes), are currently on the Building Safety Bill Committee. I know that they would like to be here to respond to his points, but it is my pleasure to respond on their behalf. I want to give an overview of the work the Government have been doing, but I will try to come to the points he has raised and give him satisfactory answers.

The £5 billion of grant funding specifically supports the remediation of unsafe cladding on high-rise buildings. This means that we will fund the cost of replacing unsafe cladding for leaseholders in residential buildings 18 metres and over in England. Work to remediate unsafe aluminium composite material cladding has progressed: 100% of high-rise buildings in the social housing sector identified as having that unsafe cladding at the start of last year have already been made safer or have remedial work under way. To date, the social sector ACM cladding remediation fund has approved £277 million of funding for the removal and replacement of unsafe ACM in England.

Tony Lloyd Portrait Tony Lloyd
- Hansard - -

The tragedy of Grenfell was as a result of a specific type of remediation of those buildings. Other types of work have had a similar but different effect, such as the example I gave in my constituency. Is the Minister telling us that they will not be covered by the £5 billion fund—that they will be outwith—and that there will be no funding available for other types of necessary fire prevention work?