Building Safety

Tony Lloyd Excerpts
Thursday 15th March 2018

(6 years, 1 month ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Tony Lloyd Portrait Tony Lloyd (Rochdale) (Lab)
- Hansard - -

I thank the Secretary of State for early sight of his statement.

Nine months on, we all still live with the human tragedy of Grenfell and the realisation that we saw the systemic failure of our system of building checks and controls. We must keep that in mind because, as the Secretary of State said—I will always endorse these words—public safety has to be paramount. That also means, however, that there has to be transparency, accountability and a driving sense of urgency.

I welcome the transparency of the Secretary of State’s making this statement at the earliest possible stage. It is right and proper that this information is in the public domain, so I thank him. I think he would agree that if the Opposition demand accountability and that the Government demonstrate a sense of urgency, that can never be open to the charge of political point scoring.

I add my thanks for the work of the Metropolitan police. The Secretary of State told us that the “Metropolitan police considered that this test result might have wider implications for public safety” and consequently alerted the Department. I was a little surprised when he said that there is “no evidence that this is a systemic issue.” I was astounded when he went on to say: “Data from between 2009 and 2017 shows that fire does not generally spread beyond the room of origin.” That may be true, but we know that that was exactly what did happen in Grenfell Tower—the fire spread and spread and spread. We cannot have any sense of complacency.

The Secretary of State says that this issue is not “systemic”, but what assessment has been made of how many buildings might be affected? How many individual flats—how many people—have fire doors that simply do not do the job? If he does not already know those numbers—I suspect it is too early to know—what steps is he taking to ascertain them? This is the point at which the words “this is not systemic” begin to sound a little incredible. There may be a systemic problem, and we have to begin to recognise that if this is a wide-scale issue, we have that systemic problem.

We need a real sense of urgency on this, as indeed we do regarding other aspects of building control. Tower block residents up and down the country are entitled to know—not simply post Grenfell—the scale of the issues. I must say to the Secretary of State that that sense of urgency has not always been apparent in all the Government’s actions. Earlier this week, he was a little embarrassed when he was not able to answer a question that was put to him at Question Time about how many tower blocks are unsafe post Grenfell. He was not able to say how many private tower blocks up and down the country have the same aluminium composite material cladding that was used on Grenfell. We now need some urgency in providing those answers and bringing the information before the House. I hope that he can tell us when he will have that information and when we can begin to give people a sense of reassurance.

In a recent written answer to my right hon. Friend the Member for Wentworth and Dearne (John Healey), the shadow Housing Minister, the Department confirmed that no funding had yet been provided to any of the 41 local authorities that had contacted it. We were told at Question Time that no funding requests had been refused, but that is not quite the full truth if the reality is that no funding request had actually been acceded to. Again, perhaps the Secretary of State can update us and tell us when the local authorities, which really do want to get on with this work, will see the assistance from central Government to which he committed nearly nine months ago.

The upshot of all of this is that, nine months on, only seven of more than 300 tower blocks that had been identified as having dangerous cladding have had that cladding removed and replaced with something more acceptable. I must say to the Secretary of State that, nine months on, that is simply not good enough.

Sajid Javid Portrait Sajid Javid
- Hansard - - - Excerpts

I thank the hon. Gentleman for his comments and I am very happy to answer all the points that he has made.

The hon. Gentleman rightly said—of course we all agree with this—that public safety is the No. 1 issue and is absolutely paramount in every way. He will know that ever since the tragedy, as well as through the police investigation and the work that is being done through the public inquiry, there have been lessons for public safety. He will remember that, right from the start, the expert panel was convened to provide the immediate emergency advice that was necessary, and that advice went out widely to the owners of both social and private sector buildings. The testing regime—the initial sample testing and then the large-scale testing—was set up, as was the independent review, which is now being carried out by Dame Judith Hackitt. I was quite deliberate in wanting to see an interim report so that we could act on some of the early lessons. I remind the hon. Gentleman that Dame Judith Hackitt’s interim report included a number of recommendations, which we have accepted, and we have now started to implement every single one of them. She is now working on her final report, which is due, as planned, in the spring. Again, that reflects our sense of urgency.

Once the expert panel and the police are comfortable that information can be publicly shared, it is right that we are transparent as quickly as possible. That is necessary to create public trust and to ensure that no one comes under any undue stress. Throughout the whole process, we have correctly been led by the experts—the expert panel and all the industry advisers who have been put in place—as well as by the work that has been done by the police.

Let me give the hon. Gentleman a bit more information about that. As well as the independent expert panel, the Government have consulted the National Fire Chiefs Council, the Government’s chief scientific advisers, the police, of course, and the London Fire Brigade. As a result, the expert panel has concluded that, so far, the risk to public safety remains low, that there is no change to fire safety advice, and that a programme of additional testing has to be commissioned to determine the root cause of the failed test. Such additional testing is required; it is going on now. As I said, it must be thorough and done at pace, but I am sure that the hon. Gentleman agrees that we should not rush it, meaning that we get either wrong or inappropriate results. It should be done properly. It should be led by the experts and only on their advice. That is exactly why I said in my statement that there is no evidence of a systemic problem—it is the advice of the experts so far. We are correctly taking their advice while we continue with further tests at pace.

The hon. Gentleman seemed to suggest that work was not being done at pace or urgently. I refute that. We have rightly worked as urgently as possible every step of the way, whether that is on today’s information or other information that has come to light since the fire. That includes work on the remediation of existing buildings with ACM cladding. So far, 301 buildings have been identified: 158 social buildings; 13 in the public sector; and 130 in the private sector. Almost 60% have begun the remediation work and, as the hon. Gentleman said, seven have completed that work. Public safety is paramount, so in every single case, interim steps were taken and measures were put in place immediately, with expert advice, often from the local fire brigade. Those measures remain in place. People can be comfortable that every measure is being taken to ensure that they remain safe.