Tony Baldry
Main Page: Tony Baldry (Conservative - Banbury)Department Debates - View all Tony Baldry's debates with the Department for Transport
(14 years, 1 month ago)
Commons ChamberI am very much aware of the campaign that my hon. Friend has run, alongside my hon. Friend the Member for The Cotswolds and other local MPs, such as the hon. Member for Cheltenham (Martin Horwood). I have met a number of MPs to discuss this project and we recognise that it is a good scheme. Important work is being done through the Grip 4 study, which is due to conclude shortly. We hope that we will be able to fund this scheme, but at the moment the deficit—the significant crisis in the public finances—that we have inherited means that we cannot take forward all the good schemes that are on the table. There is no doubt, however, that this scheme will be a serious contender when we assess these schemes again in relation to the next railway control period.
7. If his Department will fund (a) tunnelling and culverting work and (b) other mitigation work arising from the construction of any future rail line as part of the High Speed 2 project.
The coalition Government take very seriously the potential impact of a high-speed rail line on line-side communities and property owners. HS2 Ltd’s current preferred route utilises a range of mitigation techniques, including tunnelling and culverting where appropriate, practical and economically justifiable.
On page 174 of the HS2 proposals, the report states:
“It is difficult to analyse exactly where the benefits of HS2 would accrue.”
HS2 is a project that will clearly be expensive in construction costs, mitigation costs and the costs of compensation. Will my right hon. Friend give an undertaking that next year’s consultation will include a consultation on the principle of HS2 and on whether the same amount or even less money spent on the existing rail infrastructure could produce similar or even better results?
I can assure my hon. Friend that the option of spending money on enhancing existing rail infrastructure to provide the capacity and the additional connectivity that a high-speed railway will provide has been examined in detail and has been found not to be a practical option. The consultation next year starts from the premise that the Government believe that a high-speed rail network will be in the United Kingdom’s interest, but it will consult on issues to do with the design of that network, the route and the details of the proposals for the London to Birmingham link.