Seaborne Freight

Thelma Walker Excerpts
Monday 11th February 2019

(5 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Grayling Portrait Chris Grayling
- Hansard - - - Excerpts

Both of the points made by my hon. Friend are absolutely correct. My view is that the common transit convention solves many of the problems. We cannot be 100% certain, because we have not had confirmation from the French yet about how they would manage border posts in Calais, notwithstanding the common travel convention, but he is absolutely right that it should enable trade to flow through smoothly. I have been clear in saying regularly that I expect those ports and the tunnel to operate pretty much normally, but we have contingency in place just in case that is necessary.

Thelma Walker Portrait Thelma Walker (Colne Valley) (Lab)
- Hansard - -

A fake lorry traffic jam in Kent, rail timetable chaos, which is still affecting commuters and local businesses in my constituency, and now a cancelled contract with a ferry company that owns no ferries—is the Secretary of State proud of his record?

Lord Grayling Portrait Chris Grayling
- Hansard - - - Excerpts

There was no fake traffic jam; it was an exercise to test the movements of vehicles into and out of Manston in Kent. The timetable troubles were caused by a project where Government were investing in rail infrastructure in the north-west—something that never happened under Labour—which ran late. As I said a moment ago, this shipping company identified and got firm options on two ships but was unfortunately not able to carry on because its backers pulled out.

Train Operating Companies: Yorkshire

Thelma Walker Excerpts
Wednesday 19th December 2018

(6 years ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Thelma Walker Portrait Thelma Walker (Colne Valley) (Lab)
- Hansard - -

I thank my hon. Friend the Member for Dewsbury (Paula Sherriff) for securing this important debate on a subject that concerns so many of our constituents and impacts negatively on the quality of their lives.

Here we are in Westminster Hall. The Chamber is prepared, the Chair is in her place and the Clerks are ready to give advice. The Westminster staff have ensured efficiently that everything is in readiness for our debate. We are on time and we have enough seats. Members and Ministers are prepared. It is the expectation that that will happen. When my constituents buy a ticket for a rail journey or a season ticket, which will be subject to another price hike of more than 3% in January, their expectation is that there will be a regular, accessible train service with enough carriages and available seats. Their expectation is that the trains will get them to their destination on time without stress or discomfort. Those are not unreasonable expectations. They expect that that will happen, just like this debate.

Sadly, the reality for my Colne Valley constituents travelling on the TransPennine route to either Leeds or Manchester is that they are packed like sardines on trains with not enough seats available. There are frequent cancellations and severe delays. For the privilege of all that, they pay among the highest fares in Europe.

Slaithwaite and Marsden are two of the worst-performing stations in the country. Recently at Slaithwaite, 4% of trains have run on time. In the same period, 6% of trains were cancelled. It is not right that there is a greater chance of a train being cancelled than running on time. There are frequently two or three-hour gaps in service. That is what commuters in my constituency face daily. They struggle to get to work on time, and some have been issued formal warnings. They spend less time with their families because they need to leave earlier, or they struggle to make childcare arrangements to accommodate unpredictable service changes. Many have told me that they are reluctantly starting to drive to work because the services are so unreliable. The human cost is significant, and I do not believe the Government fully comprehend it.

This is not just about individuals. Businesses in my constituency have felt the impact since the chaos began in the summer. Rail user groups estimate that usage at peak times is down by about 30% since the timetable change. People may be less likely to visit our picturesque villages and support our local businesses if they cannot guarantee that they will be able to get home after their visit.

I have been working with local rail groups—Slaithwaite and Marsden Action on Rail Transport and Stalybridge to Huddersfield Rail Users Group—along with my hon. Friends the Members for Stalybridge and Hyde (Jonathan Reynolds) and for Oldham East and Saddleworth (Debbie Abrahams), to campaign on these issues and advocate for a better service. I have met the Secretary of State three times. In our most recent meeting, he agreed to facilitate a discussion between rail user groups and senior rail officers about improving co-ordination between Network Rail and train operators. It was accepted that the poor accessibility at Marsden station is unsatisfactory and that, to address it, temporary ramps should be put in place as soon as possible. I will not hold my breath.

In the meantime, my constituents are returning to their cars, changing jobs or even moving away from our lovely Colne Valley villages. They want to be home in time to put their children to bed or pick them up from nursery. They want to get to work on time or catch their flight to go on holiday. Those are not unreasonable asks.

One way commuters in my constituency are using their additional time while they stand on cold platforms is by sharing their experiences with rail companies and me on social media. I would like to share some of the feedback I have received on Twitter. Jane said:

“This morning I forked out £2,572 for my annual season ticket to Manchester. Tonight I arrived into Huddersfield 21 minutes late and missed my hourly connection. It’s not good enough.”

Lisa said:

“People need to wake up and see what impact the May timetable changes have had on our villages. All I want for Christmas is to be able to get to work on time. #unhappycommuter.”

Bob said:

“The timetable’s changed but I think they just blewit. They still can’t get trains t’stop at Slewit!"

Ouch.

We are coming up to Christmas. A present for my Colne Valley constituents would be on-time, regular and accessible trains, with enough seats and space for passengers, and affordable ticket prices. Instead of the 12 days of Christmas, we have the 12,000-plus delays of Christmas. Colne Valley people deserve better.

--- Later in debate ---
Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

I will come on to talk about fares and plans for the future, but let me focus on some of the points raised today. A number of colleagues raised a point about disabled access. As we know, our rail transport infrastructure is primarily Victorian. Successive Governments have run an Access for All investment programme, and that has continued, including a £300 million extension in the next control period. We published our inclusive transport strategy last July, which for the first time included work on hidden disabilities. As colleagues may remember, I was in the Department for Transport a couple of years ago, and we had our first ever conference on mental health and transport. That was a significant moment—I was pleased that we went calling as it attracted so much attention. Work on making our transport system more accessible and easier to use for people with disabilities, including hidden disabilities, is central, and I am sure no hon. Member here would disagree with that.

One underlying point has been that the quality of rail performance in the north has been unacceptable. That is correct; it is clearly the case. Following the May timetable change we had a very difficult summer on our railways, but lessons have been learned, especially in regard to future timetable changes, which we have already started to implement. A timetable change on 9 December landed significantly better than the changes in May, and I will expand on that shortly.

The problems in May had a number of causes, including the impact of engineering works. Long delays to the two electrification schemes in the north-west impacted on Northern, which had planned for those schemes to be completed, but they were not. It then had to completely re-plan its timetable in less than half the normal time, together with associated staff training and changes. However, we have made some headway on that. A change on the scale of that in May was, quite frankly, coupled with insufficient time for planning, which of course impacted on passengers. It was a complete failure right across the industry. That is why we set up a full inquiry into those timetable changes, chaired by the independent regulator, the Office of Rail and Road, under Professor Stephen Glaister. He has published interim reports, with a final report published just a few days ago, and the Department are reviewing its recommendations. As I said earlier, lessons from that incident must be learned, and the impact on passengers must be placed at the centre of every planning decision.

Thelma Walker Portrait Thelma Walker
- Hansard - -

In a former life I was a headteacher, and I used to work out the timetable in the summer term to set out where the children would be and with which teacher. I never had classes with no teacher in September because I thought strategically. Who is responsible for the chaos that happened under this timetable? As a former headteacher I would have taken responsibility if I ended up with two classes and no teacher, or just one teacher. Who is responsible?

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

As the hon. Lady knows, we have a system in which individual rail companies and the regulator have collective responsibility for these things, and that is what failed.

Oral Answers to Questions

Thelma Walker Excerpts
Thursday 5th July 2018

(6 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

I am very glad my hon. Friend mentions noise, because that is a topic of great interest to us. We are actively exploring whether we can bring to local concerns about noise-capturing the same kind of concerns we are bringing to the structure of the highway.

Thelma Walker Portrait Thelma Walker (Colne Valley) (Lab)
- Hansard - -

Delays, non-accessible platforms, cancelled trains, failed investment—would the Secretary of State like me to add broken promises of electrification to the list of issues with the trans-Pennine route for my constituents?

Lord Grayling Portrait Chris Grayling
- Hansard - - - Excerpts

We have already modernised the line from Liverpool to Manchester and we are about to start a £3 billion modernisation of the railway line from Manchester to Leeds to York, so I make no apology to the people of the north for the fact that we are spending £3 billion on upgrading their railway line when the Labour party, when it was in office, did absolutely nothing.

Confidence in the Secretary of State for Transport

Thelma Walker Excerpts
Tuesday 19th June 2018

(6 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Tracy Brabin Portrait Tracy Brabin (Batley and Spen) (Lab/Co-op)
- Hansard - - - Excerpts

Thank you for giving me the opportunity to speak in this important debate, Madam Deputy Speaker. I thank my hon. Friend the Member for Middlesbrough (Andy McDonald) for moving the motion.

Although the Secretary of State is no longer in his place, I thank him for meeting me last week to talk in detail about the reasons for the timetabling meltdown in Batley and Spen. I am grateful for his reassurance that, over time, things will settle down.

Last Friday morning, I spent time outside Batley railway station to speak to commuters about their experience of commuting and to hear how things are, we hope, getting better. Sadly, that was not the feedback I got. I was startled by how chaotic and unreliable the service between Leeds, Huddersfield and Manchester still is.

I heard from Mandy that her regular journey from Batley to Leeds, during the timetable chaos and beyond, is “the worst commuting experience I have ever had.” She went on to say that “to say there is only standing room is an understatement. Passengers are crammed into a limited number of carriages like sardines.”

I spoke to Dean, who uses trains every day. He said that travelling by train often adds two hours to his day due to delays, with “extra hours away from home on top of a long working day.” He went on to say that “the situation is threatening the livelihoods of many.” Dean wanted me to ask directly whether, if he were to lose his job due to mismanagement of the railways, the Minister and the Government would pay his mortgage and support his family.

I also met Rachael, who was forced to spend her journey standing in the toilet with six other commuters, as there was no space anywhere else. She told me that, as late as this week, her regular service left people on the platform, without opening its doors, as it was too full by the time it arrived in Batley. Seventy people were left waiting over 70 minutes for the next train.

Thelma Walker Portrait Thelma Walker (Colne Valley) (Lab)
- Hansard - -

Does my hon. Friend agree that, as our constituents are paying some of the highest prices in Europe for train tickets, the minimum they should expect is for trains to run on time and to be modern and comfortable and for them not to be packed in like sardines? If the train companies are unable to do that, they should have their franchises taken off them and be brought back under public ownership.

Tracy Brabin Portrait Tracy Brabin
- Hansard - - - Excerpts

I thank my hon. Friend for her intervention, and I could not agree more. Given the cost of tickets, people should not have to stand on a daily basis. Beyond Batley to Leeds, the timetable is erratic and in chaos, and it still has not settled down.

I spoke to Alison, who told me how concerned she is about health and safety. Crowds of passengers are jostling and pushing to get on already overcrowded and delayed trains.

This is just a snapshot of what is happening twice a day, every day, at most stations across the north. My constituents still see no positive change in their commute, even after reassurances from the Secretary of State. What is the Minister doing to ensure that my constituents can travel to work and back without having to factor in delays and frustrations, which are adding to their stress?

People deserve a decent, reliable rail network, and, in all honesty, they deserve better leadership from the Secretary of State. If he cannot sort it, maybe it is time for him to hand over the responsibility to someone who can.

Rail Timetabling

Thelma Walker Excerpts
Monday 4th June 2018

(6 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Grayling Portrait Chris Grayling
- Hansard - - - Excerpts

Bringing track and train back together is part of the solution for the railways. I am absolutely sure that the railways are going to have to change quite a lot as a result of what has gone on, which has been completely unacceptable. Their ways of working have got to change. We are going to need a reshaped approach for the future.

Thelma Walker Portrait Thelma Walker (Colne Valley) (Lab)
- Hansard - -

Disabled passengers in my constituency have been told that they will not be able to catch certain trains as TransPennine has rolled out old stock to try to fix the broken timetables and reduce delays. Does the Transport Secretary agree that this is discrimination and unacceptable? Will he intervene to tell TransPennine that it must make sure that each train is compliant with disability legislation?

Lord Grayling Portrait Chris Grayling
- Hansard - - - Excerpts

It is the duty of all train companies to ensure that that happens. The rolling programme of train replacement means that all trains will be disability-compliant. Every train in the north is being replaced with either a brand new train or a refurbished, as-new train. I will continue to make the point to all train operators—as will the Under-Secretary, my hon. Friend the Member for Wealden (Ms Ghani), who is responsible for accessibility—that they have to make a priority of this.