Rail Services: South-east London Debate
Full Debate: Read Full DebateTeresa Pearce
Main Page: Teresa Pearce (Labour - Erith and Thamesmead)Department Debates - View all Teresa Pearce's debates with the Department for Transport
(5 years, 8 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I totally agree with my hon. Friend, and I will be coming to that point later.
Network Rail, of course, is responsible for the tracks and for the problems that we have had with the landslip. I recently met with its route managing director, John Halsall, to discuss the situation, and he understood that it was unacceptable. There is nothing new in that; it is unacceptable.
Network Rail has regularly let down rail users, but it is not just that: Southeastern has been unable to act when contingency plans are required. It never seems to have them, and it does not provide information to our constituents about what is going on. It supposedly put extra trains on to the Erith and Sidcup line during the Barnehurst landslip, but many of us used that service when the Bexleyheath line was out of action, and when we got to Charing Cross or wherever, those trains were cancelled. The extra trains that Southeastern put on did not exist, so it is no good Southeastern saying that it is looking after the customer, because it most certainly is not.
As I have always said, Southeastern’s timetable is a work of fiction at the best of times; it was even more so on that occasion. The overcrowding, the cancellations and the distress caused to constituents who were trying to get home, pick up children from childcare, get to meetings or whatever were appalling.
Southeastern is full to busting at the moment, and given all the new development in my patch and in the right hon. Gentleman’s patch, does he share my concern about how on earth Southeastern is going to manage when it cannot manage at the moment? Does he believe that those developments will increase the risk of critical failure, given that the system will be overworked?
The hon. Lady makes a good point. Our area is ripe for further development, which is what we want. We want jobs, houses and opportunities, but we cannot have those without infrastructure. If the infrastructure cannot cope with that development, more problems are going to occur.
The Minister may be able to tell us different, but I believe no other rail network has had as many problems as ours. The excuses for delays and cancellations beggar belief: bad weather, leaves on the line, snow, low-level sunshine, overrunning road engineering works, and even drivers not turning up at Dartford because their taxi from Gravesend did not arrive on time. Southeastern could not run the train from Dartford because the driver did not turn up—it is really appalling. There have been breakdowns en route and doors that will not close—the list goes on and on. In my view, older rolling stock is the cause of some of these issues, not maintenance.
Many of my constituents have been appallingly disappointed that no decision has been made about the new franchise, as was mentioned earlier. That ought to have been in place by now, but we have just extended the existing franchise, which is one of the worst possible options that we could have chosen. If the operator cannot invest for the future, it is not going to do anything.
I totally agree with that. The sooner we know, the better, so the new operator can get cracking on what needs to be done to improve the service.
The new franchise contains some good proposals. Working more closely with Network Rail will be a great improvement, because I do not think the operator and Network Rail work together terribly well at the moment. We welcome the fact that there will be direct services from Bexleyheath to Abbey Wood, tougher demands for reliability and more frequent services to Charing Cross. However, with no decision having been made and no action, we suffer more and more, and our constituents have had enough. I know that the Minister is relatively new to his post, but I have a high opinion of him, and he is well respected across the House. I hope he will take some action within his Department.
On the point about the new franchise, commuters in the right hon. Gentleman’s constituency and in mine have journeys that are meant to be about 30 to 40 minutes, but Delay Repay kicks in only if people are 30 minutes late. Under the new franchise, it will kick in if they are 15 minutes late. Does he agree that as Southeastern has opted to bid for the new franchise, it should bring in that change now?
That would show good faith to the public, who are suffering from that situation now, would it not? I totally agree with the hon. Lady, and I hope that a 15-minute Delay Repay policy will motivate whoever holds the new franchise to operate a better service.
As the Minister will know, we have been blighted by endless signal failures at Lewisham, which again have caused misery, delays and cancellations. Sometimes, once those signals start to go wrong, they go wrong all through the day—it is unbelievable. We have already suffered from the London Bridge development, which caused considerable distress and disappointment. I understand from Network Rail that it is going to fix the signalling problems at Lewisham; it is going to start this Easter and finish next Easter, in 12 months’ time. Do we have to continue to suffer over the next year? Frankly, that is not acceptable.
There is also the problem of Crossrail. We were hopeful that Crossrail from Abbey Wood would give us an alternative and be part of what we need, but, regrettably, that has been delayed. It should have happened last December, but we do not yet have a date for when it is expected to be operational. That is a huge disappointment for our constituents. I know that it is not the Minister’s responsibility, but that of Transport for London and the London Mayor, but he should put more pressure on to get a date, at least, for when it will start. We have no date.
The other thing I want to raise is something we have been campaigning for. Originally, Crossrail was not going to stop at Abbey Wood, but would go to Ebbsfleet, and we are really keen to see that happen. We have had meetings with the Secretary of State. He came down, along with the hon. Member for Erith and Thamesmead and me, to have a look at what could be done and to have discussions with the council. An extension there would be so welcome. Other parts of the capital have Crossrail going out much further. We, who do not have an underground and have a poor rail service, have been put on the back-burner.