(2 years ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I beg to move,
That this House has considered the economic impact of covid-19 lockdowns.
It is a pleasure to serve under your chairmanship, Mrs Murray, and to be able to debate the economic impact of covid-19 lockdowns, because so often during the pandemic we did not have the opportunity to question key decisions that were taken. In those early days of covid, much was done in a rush. Although it was understandable then, with the passing of time analysis needs to be done of the measures and decisions taken. No matter how painful and difficult the conversations will be, we need to have them. Open and frank conversations are made more difficult by the fact that the vast majority of MPs voted for continued lockdowns and most of the media was reluctant to question them.
Although everyone supported the first lockdown—March to June 2020—no one knew what we were confronting. As knowledge of covid and medical treatments grew, so should the debate have grown, particularly about subsequent lockdowns, but that was not the case. Prior to March 2020, how many of us had heard of the concept of lockdown? Blanket, stay-at-home policies were an unknown and unevidenced method of trying to control the virus.
Although lockdowns will have saved lives from the virus, many experts predicted from the start that they would also cost lives, through the unintended collateral damage they inflict. A Government report in July 2020 found that more than 200,000 lives could be lost due to lockdown. Well-rehearsed pandemic protocols, including those endorsed by the World Health Organisation and the Department of Health and Social Care had not previously recommended lockdowns because, quite simply, they are a blunt instrument.
In addition, it was felt that such drastic restrictions would not be tolerated by western democracies. As Professor Neil Ferguson infamously put it, after observing entire communities in China in lockdown,
“We couldn’t get away with it in Europe, we thought. And then Italy did it. And we realised we could.”
That poses a question. If people assumed that the UK population would not tolerate lockdowns, was messaging hardened and questions against lockdown not tolerated, in order to force compliance? We might never know the answer. Ongoing lockdowns were achieved, but at what price? Interestingly, only the other week, Andrew Gilligan, a former No. 10 adviser said on GB News that, looking back, the ongoing lockdowns were wrong, but politically we could not have got away with not doing them.
Why was that? How was an environment created in which even asking questions and providing alternative suggestions could get someone demonised? And those people were. I wrote an article for The Daily Telegraph in November 2020 saying, regretfully, that politicians had been guilty of a dereliction of duty. Instead of just listening to the one-dimensional approach of Public Health England and the scientists, they should have factored in all competing consequences. They did not and ploughed on, without questioning those other factors.
I am a massive fan of small businesses, enterprise and those people creating wealth in their communities, and we will have to support them. Also, I will pause for a moment to reflect on all those small businesses that did not get support during the pandemic, which are known as Forgotten Ltd, and they also need support going forward. We again have to create a dynamic world and a dynamic UK for these private enterprises.
Vacancies are now at a record high as people elect to resign from the labour market, which is known as “the great resignation”, and because there are those other people who are now classed as being economically inactive. This is something that we could not have foreseen as we furloughed and closed the country down, but again it is a consequence of the lack of debate, probing and questioning at the time.
It is finally time to publish the much talked-about but still missing cost-benefit analysis that led to the nation being locked down, and to have full disclosure about the facts that were available. Let us review the list of experts on the Scientific Advisory Group for Emergencies, or SAGE, and on other advisory committees. Going forward, let us ensure that there is transparency about the members of these groups, as we have for MPs, such as their political affiliation and the financial support they receive.
All eyes are on the covid-19 inquiry for impartiality and a diverse range of experts to give evidence. We need integrity and clarity, and the policy of lockdown needs to be assessed honestly and fully. However, today I call on the Minister—the Economic Secretary to the Treasury, my hon. Friend the Member for Arundel and South Downs (Andrew Griffith)—to release the much-awaited cost-benefit analysis of lockdown.
Before I call the next speaker, may I just apologise for the background hum? I understand that staff are trying to resolve it. In the meantime, however, if Members could speak very clearly, I think we can continue with the debate.
I thank everybody for such a constructive debate, which was the start of our being able to look at the cost of lockdown in an open-minded way—being able to take challenge, being able to take rebuttals and answering things as honestly as possible—because when £400 billion is spent, we know that cannot be done without having long-term impacts.
We see the impact in the vulnerability of our country now—in the cost of living, the cost of jobs, the cost of inflation and the cost of poverty. We heard about the cost in terms of our health and our mental health. We should think before we ever introduce such profound policies again, particularly when the World Health Organisation and the Department of Health and Social Care have conceded that we should not use lockdowns because they are such a blunt instrument. We can never live in an atmosphere where just to ask questions is condemned. I thank everybody for participating in the debate.
(2 years, 5 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Esther McVey will move the motion and then the Minister will respond. As is the convention in 30-minute debates, there will not be an opportunity for the Member in charge of the debate to wind up.
I beg to move,
That this House has considered the Winnington Bridge corridor proposal.
It is a real pleasure to have you in the Chair, Mrs Murray, overseeing this vital debate. I thank my hon. Friend the Minister for taking the time to hear the concerns of the constituents of Tatton as well as those of a neighbouring constituency, Weaver Vale, about Winnington bridge and the urgent need for it to be upgraded. I am grateful to the hon. Member for Weaver Vale (Mike Amesbury) for being here today to support this debate and this campaign.
This is the new battle of Winnington bridge. The original one, often described as the last battle of the civil war, took place on 19 August 1659 and resulted in a win for the Government. Today I hope to elicit a win for the constituents of Tatton and the surrounding areas, and that there will be no need for much of a battle. Rather, I hope the Government will see common sense and common purpose and support the levelling-up bid to allow the upgrade of, and improvements to, this bridge.
As history points out, Winnington bridge, which crosses the River Weaver, has been a vital piece of infrastructure for many a year, and it remains so. In fact, its importance only grows, and it now carries the A533 trunk road between Northwich and Barnton. That is a major route, yet it is served only by a single-lane swing bridge. To cross the bridge, three lanes of traffic are funnelled down into one lane, which then allows people to cross the bridge single file, one way. I will repeat that, as most people cannot quite believe it: three lanes are funnelled into one for a single-file crossing.
The current bridge was built in 1908 to enable passage from one side of the river to the other and to allow use of the waterway below, allowing growth of the area’s developing chemical industry. This crossing was deemed to be so important in developing both Cheshire’s and Northwich’s economy that a “newfangled” swing bridge was constructed; it was one of the early electronically operated ones. I am sure the Minister will agree that a lot has changed since 1908 and that what was deemed state of the art back then, in an area surrounded by fields and with only a few houses, is far from what is needed in 2022 and certainly does not cater for heavy goods vehicle lorries and the mass movement of cars. That traffic now serves a thriving business area and local communities, and keeps increasing in this most sought-after part of the country.
The bridge has needed replacing for many years, and the levelling-up agenda and the levelling-up fund now allow the issue to be addressed. Cheshire West and Chester Council has identified Winnington bridge as the single most important piece of transport infrastructure for the area and has submitted a bid to the levelling-up fund—the deadline for bids was meant to be tomorrow, but I hear that it has now been extended. Please let the record show that I am pledging my support for that bid—one that the Government need to support and get behind too.
The project will include a new road bridge across the River Weaver, conversion of the existing single-track bridge, as a cycle-and-pedestrian-only option, and the undertaking of three junction improvements between the bridge and Northwich town centre to create a corridor scheme to fully address the congestion issues and create a cycle link from Barnton and Anderton through to Northwich town centre amenities and national cycle network route 5, thereby serving the residents of the villages of Barnton, Anderton with Marbury, Comberbach and Little Leigh.
The current bridge is an unsuitable crossing now and in the long term. The bridge is a prime crossing point for residents, the number of whom, in the last 10 years, has grown exponentially because of the 1,200 new homes built around the bridge. That number is only set to grow further, with an extra 473 new build homes having been approved or already having existing valid planning permission. On top of that, another 1,555 are proposed on the Winnington Works site. That means that there will be thousands of new residents in the local area, who will be using the bridge every day to get to work, school and the local amenities on either side of it.
The increase in cars on the road and commuters in those new houses will only worsen the already long queues and increase the emissions in the area. So bad is the annual wear and tear on the bridge that approximately £1 million to £2 million is spent every five years to retain it in its current state. Such has been the traffic use of late—it only keeps increasing—that in summer 2020 essential bridge maintenance costing approximately £980,000 was required to replace deteriorating parts of the 110-year-old bridge to ensure that it can continue to operate. A heavy goods vehicle traffic ban on the bridge to reduce the load is not feasible, as it serves as a vital artery for a successful industrial estate in Barnton.
We need a permanent solution now, as maintaining the bridge is not only costly but disruptive. A constituent has reported that congestion at peak times is ridiculous. The condition of local roads due to construction traffic is of lunar standards. We are constantly battling poorly planned roadworks, and it is impossible for a person to see a doctor when they are ill.
I cannot emphasise enough how much this problem has affected local people on so many levels, and it is only getting worse as more houses are built without a second thought to the existing community. Repeated closures for repairs cause significant congestion on top of the already long delays. Worried residents write to me saying they fear for their lives. Lives can be lost due to the extra time that emergency services take to navigate around the road closures. One constituent said:
“I was on ‘Battle’ Bridge”—
as it is now known—
“when an ambulance was trying to get through to Barnton. This was totally impossible. Because of the three-way permanent lights at the foot of Soot Hill, this was blocked completely.”
My constituents are rightly worried about the impact on local life. I hope the Minister will agree to speak to the whole Levelling-up team to ensure they are fully aware of the multitude of problems associated with this out-of-date, totally unsuitable, unworkable old bridge.