All 1 Debates between Robert Goodwill and John Denham

Rail Services (South-East England)

Debate between Robert Goodwill and John Denham
Wednesday 12th February 2014

(10 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Robert Goodwill Portrait Mr Goodwill
- Hansard - -

The hon. Lady is right. The situation has not just developed in the past four years; there has been a backlog in investment in our rail, particularly in rolling stock. Northern Rail has some very old rolling stock. Indeed, a couple of weeks ago, we had a debate in which my hon. Friend the Member for Stevenage (Stephen McPartland) suggested that the rolling stock on his line is older than he is. There is a lot to be done, but that is no reason for not continuing with the investment that we have announced and with the projects that we are continuing to deliver. I often hear the criticism that we are spending far too much in London, when other parts of the country are being neglected.

John Denham Portrait Mr Denham
- Hansard - - - Excerpts

I am familiar with that north-south argument that suggests that all the investment is going to the south-east. Does the Minister accept my concern that my constituents, who are paying so much over the odds for their rail journeys, are no keener than constituents in the north of England to subsidise a railway in another part of the south-east? We have a situation in which we are asking a relatively small part of the country to pay the bill for all the railway investment that is taking place, whether in the north or the south.

Robert Goodwill Portrait Mr Goodwill
- Hansard - -

I suppose that my constituents would counter that by saying that the east coast main line is the line that contributes to the Government’s coffers, whether through a franchise operation or its current nationalised express, as I think someone called it the other day. A lot of investment is going into London and the south-east because that is where we see the most congestion and overcrowding. The £6.5 billion investment in Thameslink will link Kent, Sussex and Surrey, through central London, with Hertfordshire, Bedfordshire and Cambridgeshire. The Thameslink programme will deliver up to 1,140 carriages of high-capacity, next-generation rolling stock, in addition to some 600 new carriages that are being provided as part of the Crossrail project, which is a significant enhancement of the rail network’s capacity. I do not need to mention that Crossrail is the biggest engineering project in Europe. I was down there yesterday morning to see how work is progressing, and it is expected to be delivered on time.

My hon. Friend the Member for Dartford referred specifically to the service provided by Southeastern. As one would expect, the Department closely monitors rail performance, and I will spend a moment providing a little more detail on some of the recent performance trends. The key headline indicator for rail performance is the public performance measure, which measures the percentage of services that arrive between one minute early and five minutes late of their timetabled time.

The most recent period data available, from April 2013 to 1 February 2014, show a total average PPM score for the Southeastern network of 89.8%, which is 2.4 percentage points below the target agreed between the operator and Network Rail. Southeastern’s PPM score positions it in the lower mid-table when compared with all other train operating companies. Compared with similar operators in the region, Southeastern has a higher PPM score than Southern Railway, which is at 86.8%, and a slightly lower PPM score than South West Trains at 90.2%.

Southeastern’s franchise agreement, in keeping with all franchise agreements, includes operator performance benchmarks for delay minutes, cancellations and train capacity. Those benchmarks are a contractual requirement, which, if breached, can result in actions against the operator, such as additional passenger benefits at no cost to the Department or, in the case of extreme poor performance, franchise termination. Southeastern is currently performing within its contractual benchmarks and has been doing so for the duration of its franchise. My officials assure me that swift action will be taken if performance benchmarks are breached.