High Speed Rail (London – West Midlands) Bill: Instruction (No. 3) Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (London – West Midlands) Bill: Instruction (No. 3)

Robert Flello Excerpts
Tuesday 23rd June 2015

(9 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

Those are precisely the sort of issues that petitioners can come forward with as part of the hybrid Bill process that this additional provision triggers. May I make it clear that we are not, at this point, considering agreement on these changes? This is about setting the process in train so that these points can be made and the Committee can look at them.

Robert Flello Portrait Robert Flello (Stoke-on-Trent South) (Lab)
- Hansard - -

Will the Minister clarify that last point? Will an environmental impact study be carried out on the difference between the two possible depot sites? Has that been considered or is it something that will come further down the line, if he will pardon the pun?

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

There will indeed be an environmental statement to address the impact that will arise from the 18 changes that require additional powers in the Bill—for example, a new location for the replacement village hall for Burton Green. An environmental statement will accompany those additional provisions, and some changes that do not require additional provisions will also have their own environmental statement, which will allow those particularly important environmental considerations to be discussed.

The additional provision includes powers to build sidings for Crossrail at Old Oak Common which may in future enable a link to be built between Crossrail and the west coast main line. That is not in itself part of HS2, but doing the work after HS2 is built would incur significant expense and disruption.

--- Later in debate ---
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

The hon. Lady makes precisely the point that has already been raised by many residents about the existing provision before the hybrid Bill Committee. The additional provisions in AP2 will also allow them to have that say, so that, if necessary, mitigation can be put in place to lessen the impact of construction traffic and to look at alternative routes for traffic and other such things. I have been down the line of route, and I do understand many of the problems. Indeed, I was in Slough on Sunday, and saw the site from the train. I know exactly where it is located.

Robert Flello Portrait Robert Flello
- Hansard - -

On the future-proofing issue, the Minister may possibly be aware that I have a certain interest in Stoke-on-Trent being serviced ideally by HS2 directly. However, is the Handsacre junction also being future proofed to protect areas such as Stoke-on-Trent? Do these provisions address that?

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

That matter does not specifically relate to measures in AP2. Where possible, we will ensure that, as we construct the railway line, we do not rule out other connections, which is precisely the point that I made about the west coast main line.

The changes in total will not increase the overall project budget or target price for phase 1. They result in modest additional costs, but they will be accommodated within the contingency, which is provided for that very purpose.