Rachael Maskell
Main Page: Rachael Maskell (Labour (Co-op) - York Central)Department Debates - View all Rachael Maskell's debates with the Department for Transport
(6 years ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is, as always, a pleasure to serve under your chairmanship, Ms McDonagh. I congratulate the right hon. Member for Preseli Pembrokeshire (Stephen Crabb) on opening today’s debate and enabling a strong debate on the urgent need for transport investment in south Wales.
The right hon. Gentleman represents a beautiful peninsula in south Wales and a vital transport corridor, which I have no doubt will be in more demand following the UK’s leaving the EU; but without the right infrastructure in place, it could result in a massive impact on his constituency and throughout the south Wales corridor. This level of detail has been ill-conceived by the Government. As 29 March next year is rapidly approaching, I urge the Minister to ensure that the risk analysis for all parts of his portfolio, including the impact in south Wales, is clearly attended to.
My fear is that the Prime Minister's plans will not contain anywhere near the level of detail needed, whenever we get to see them—maybe later today. I have also heard a real call for better connectivity to the whole of south Wales, and rightly so, not least from my hon. Friend the Member for Newport East (Jessica Morden). We know that the Welsh economy has been seriously challenged by poor connectivity, and that recent decisions made in Westminster—not in the Senedd—have had the worst impact, not least on rail.
We will never forget how in 2017, the day after Parliament rose for the summer recess, the Secretary of State snuck out the announcement that he would cancel the rail electrification project in south Wales. That would have been a game changer to all communities in the region and would have enabled faster, cleaner and more efficient rail services to the valleys and conurbations. However, in writing off south Wales he has singly made the most detrimental decision to stem the potential of the Welsh economy and sustain a transportation challenge in the region.
My hon. Friend makes the point about the cancellation of electrification beyond Cardiff. Does she share my concern about the delays that there have been to the electrification as far as Cardiff? We have seen that put off again and again, with delay after delay. People are enduring really poor service on the Great Western main line, which has a huge impact on transport infrastructure.
My hon. Friend makes a really important point. I feel great pain as he speaks about the delays in improving the railway network. The situation is unsustainable. We should be investing in high-quality digital rail, which would build far more capacity across the network, as well as upgrading rail networks through electrification projects. That is why I believe that people in Wales will focus on this issue at the ballot box at the next election.
I want to put it on record today that Labour, in government, in Westminster, is fully committed to expansion of electrification and digital rail projects in south Wales. We believe in optimising every economic opportunity for the population of Wales. Further, our renationalisation programme for rail will be a serious game changer for all rail operations across Wales, including those in the M4 corridor, both in Wales and leading into England. That connectivity will move forward the economy in that part of the country.
I now turn to the wider transport brief. It was so important for me to start my contribution with a focus on rail because connectivity is not about segregated transport systems, with rail in one silo and roads in another, as the Government place them; it is about a joined-up approach to ensure that business, commuter and leisure passenger movements can be made with maximum ease and minimum expense. Labour has clearly set out how we will put a real emphasis on bringing about modal shift, helping to decongest our roads and create greater reliability. The sheer misery—which we have borne witness to in today’s debate—of those using the strategic road network in Wales has been palpable. It will be important, therefore, for the Minister to tell us how he will provide short-term relief for that, as well as long-term solutions.
In an age when climate change is having a devastating impact on our planet, and when cars are logjammed on our roads, as highlighted by my hon. Friend the Member for Cardiff South and Penarth (Stephen Doughty), the current situation is polluting our atmosphere today and causing major air quality problems to residents along the M4 corridor. We know that that hits the most deprived communities the worst. We need an urgent resolve to get quick relief.
The current proposal for a 14-mile stretch of road around the south of Newport is expected to cost around £1.4 billion. Since 2016, the proposal, which has been on and off the table for the best part of 30 years, has been the subject of consultation, with the final decision to be made in the coming months. The pubic consultation closed this spring. The so-called black route has been the preferred route and the Welsh Government have stated that it is vital that the route resolves issues of capacity, safety and resilience along the M4 corridor in south-east Wales. As with any road project, clearly strong arguments will be made on all sides—and I have read them—both on the economic and transportation challenges and on the environmental case.
Some £50 million has already been offered to offset the carbon cost of the project. There is recognition that the project will have a serious environmental impact, as we have heard today. We would be disingenuous, therefore, if we did not all recognise that it is a difficult decision. On the one hand, we have pollution as a result of congestion, delays as a result of queues, and 100,000 vehicles using the route every single day. There is an urgent need for better transportation—better connectivity between sea, rail and active travel—and there is an opportunity to be grasped. For every £1 spent we will see £2 returned to the economy. Perhaps the greatest prize will be the 300 accidents that the project prevents. We cannot wait until 2023 to see that number fall dramatically.
On the other hand, there is serious environmental concern. We are familiar with the evidence highlighting the impact of induced capacity, which draws vehicles on to major routes, causing them to become a source of major pollution and future congestion. The Welsh Labour Government have done more than any other to impact-assess their policies against that, through the Wellbeing of Future Generations (Wales) Act 2015 and the Environment (Wales) Act 2016. The figure that perhaps we should all focus on, here in Westminster and in the Senedd in Wales, is that the project is cited as becoming carbon-neutral by 2072. With nations that face catastrophic flood and drought, every decision we take must also seek to enhance our climate and focus on the humanitarian consequences. I know that such concern will be at the forefront of the Welsh Government’s thoughts as they conclude their deliberations.