All 1 Debates between Pete Wishart and Owen Paterson

Mon 2nd Mar 2020
High Speed Rail (West Midlands - Crewe) Bill: Revival
Commons Chamber

Carry-over motionmotion to revive Bill & Carry-over motion & Bill reintroduced & Bill reintroduced: House of Commons & Bill reintroduced & Bill reintroduced: House of Commons & motion to revive Bill: House of Commons

High Speed Rail (West Midlands - Crewe) Bill: Revival

Debate between Pete Wishart and Owen Paterson
Carry-over motion & Bill reintroduced & Bill reintroduced: House of Commons & motion to revive Bill: House of Commons
Monday 2nd March 2020

(4 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts Amendment Paper: Consideration of Bill Amendments as at 15 July 2019 - (15 Jul 2019)
Owen Paterson Portrait Mr Owen Paterson (North Shropshire) (Con)
- Hansard - - - Excerpts

I will be brief, because I am sure that others want to speak. I remember hearing the news about this when I was in the Cabinet. In 2010, we were told that the project was going to cost a little over £30 billion, that it would give a direct link from the north straight to HS1, opening up all the opportunities of the continent, that it was going to go directly to Heathrow, with all the advantages that that would bring, and that it would cut out short flights from Manchester and Liverpool down to Heathrow. That is not going to happen. Instead, we are going to go to somewhere called Old Oak Common. This might be a very charming place. It might have many attractions, but my constituents do not want to go to Old Oak Common. They want a direct link to HS1 and the continent, or they want to go to Heathrow.

And what has happened to the money? The money is absolutely out of control. It was £30 billion. Then we were told it was £80 billion. The latest estimate is £100 billion. The very worst figure I saw in a Sunday paper was £230 billion. Put brutally, this is Victorian technology: rolling around the country in steel boxes on steel wheels on steel track is Victorian technology. It was revolutionary at the time, but now we have broadband. The chief executive of Openreach has said that for £30 billion, the original cost of HS2, we could provide superfast fibre to every single one of the 30 million properties in the country. That would deliver far greater social, educational and economic benefits than spending this titanic sum.

It is with some regret that I have seen this project slip and slip. I have seen it with my own eyes, locally, in the village of Woore. It is effectively a salient of Shropshire sticking out into Cheshire and Staffordshire—a village of 1,200 people, a large primary school and an already busy main road, quite a lot of which has no pavements. This means that small people go to school without a pavement to walk on. HS2 announced suddenly—notices were put up in Woore, and we were told this at a meeting—that there would be 600 vehicles a day passing through the village during the construction phase. At 24 vehicles a day, a project has to get permission under section 17 of the Town and Country Planning Act 1990, but we are talking about 600. We have had numerous meetings with HS2. I give all credit to HS2: it has always come along, but it has not budged an inch. All that we have done is double the time of the construction phase, so that instead of 600 vehicles a day, there will be 300 a day—

Pete Wishart Portrait Pete Wishart (Perth and North Perthshire) (SNP)
- Hansard - -

Will the right hon. Gentleman give way?

Owen Paterson Portrait Mr Paterson
- Hansard - - - Excerpts

I will not, because we are getting very short of time.

So on that local issue, I have got absolutely not an inch out of HS2. It has been completely inflexible. It is insisting on taking traffic round three sides of a rectangle, with a journey of about 14 miles, although it could have used a direct route of 6 miles. I am completely disillusioned with this project at national level, and I cannot see how we can justify this titanic sum of money. As my hon. Friend the Member for Lichfield (Michael Fabricant) said, the original plan was for the track to go up the M40. We were going to have very fast trains that would deliver a substitute for flight times, which is not going to happen.