44 Nigel Mills debates involving the Department for Transport

Train-building Industry

Nigel Mills Excerpts
Tuesday 12th July 2011

(12 years, 10 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Nigel Mills Portrait Nigel Mills (Amber Valley) (Con)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Gale. I shall try to be relatively brief on this important topic. I am grateful that we have the chance to debate and question the Minister on the future of the UK train-building industry, especially with reference to the recent award of preferred-bidder status for the Thameslink contract to the Siemens consortium, rather than the Bombardier one. It is of great interest to people in the whole Derby area, not least in my constituency of Amber Valley, that we get to the bottom of how the contract came to be awarded to a German rather than a UK-based manufacturer.

Anna Soubry Portrait Anna Soubry (Broxtowe) (Con)
- Hansard - - - Excerpts

I congratulate my hon. Friend on securing the debate in what has been a very difficult time for Derby and Derbyshire. Does he agree that the decision also has an impact on constituencies such as mine, which are as far from Derby as I think Amber Valley is? It has had a profound effect and caused a lot of anger among my constituents, as well as, no doubt, my hon. Friend’s.

Nigel Mills Portrait Nigel Mills
- Hansard - -

I am grateful for that intervention. I suspect that part of my constituency is a bit nearer to Derby than my hon. Friend’s, but I accept that we are all in the same area and that we have people who commute to work at the Bombardier plant and work in the many support industries in the area and who are threatened by the decision.

It is worth starting by saying that the area has a proud history with the railway industry, ranging back to the beginning of the industry in the early 19th century—I believe that production began in Derby in about 1839. The Midland Railway Centre is in my constituency. It is a tremendous attraction and I urge everyone to come to visit it, but the last thing we want is for our whole railway industry to become a museum. We want a thriving and growing train-building industry. We have had a thriving and growing train-building industry. Passenger numbers have been up year on year for ages and we expect that growth to continue. There is no reason why we cannot have a viable industry in the UK if the Government support it.

I want to cover two areas in my speech. The way to help to preserve and enhance the train-building industry would have been to give Bombardier the Thameslink contract in the first place. I want to talk about whether there is any way that the Government can still reconsider that decision. We are only at the preferred-bidder status stage and have not signed on the dotted line for the whole contract, so I think there is still scope for that to happen. I also want to look at how we can go forward in a better way to procure such contracts more sensibly, so that there is a level playing field and our only UK train-building company has a fair chance of winning contracts. That may not be how we see the current process.

The award of preferred-bidder status on the Thameslink contracts to the Siemens consortium rather than the Bombardier one has led many of my constituents to think that the Government have taken leave of their senses. We have rightly spent the past year talking about the need to focus on the manufacturing sector to provide the skilled jobs we need and to rebalance the economy away from London and the south-east. My constituents have told me that they thought that that meant the midlands and the north, not Germany.

The industry is very skilled, with a huge number of skilled jobs of exactly the kind that we want to attract. The award of this huge £1.4 billion contract to Siemens rather than Bombardier means that we are talking the talk, but not walking the walk. Frankly, my constituents cannot understand why we do not spend taxpayers’ money in a way that produces the overall best benefit to the economy of the UK as a whole and the Derby area. We now risk losing not only the 1,000-plus jobs at Bombardier, but the jobs in the supply chain, which are much harder to quantify at this stage.

My first question for the Minister is this: can the Government reconsider the decision? If not, would she help us to understand exactly why not? We know from Government answers and statements that their view in simple terms is that all they could do was open the submitted bids, compare them to the tender specifications drawn up by the previous Government, work out which one was the most economically advantageous and award the contract. The Secretary of State for Business, Innovation and Skills has commented that the specifications were very narrowly defined and there was almost no doubt who would win.

We understand now that weighting for overall socio-economic considerations was not included in the specifications. Had that been included, it may have allowed the Government to take into account the overall impact of the job losses, the loss of tax revenues, the benefits they will need to pay out and the overall knock-on effect on the economy. We would all much rather that those things were included in the specifications. Can the Minister confirm that that weighting was not included in the contract?

Having realised that, did the Government consider restarting the whole process and saying, “We got the specifications wrong, and if we are to spend £1.4 billion of taxpayer and passenger money, let’s get it right and spend the money properly”? Did they look at doing that? Could they have done it? If not, why not? There is a lot of concern that we are going ahead with so significant a contract, with such significant implications, when the Government do not even seem to think that the procurement process has been handled properly or included all the conditions that ought to have been included.

One reason why Bombardier has concerns is its record with Department for Transport procurement processes. It can win contracts worldwide. It can even win contracts to build trains in Germany. It can win contracts with everybody else in the UK. Out of the 14 bids it made for contracts from operating or rolling stock companies, it has won 11, but out of five bids where the DFT was running the process, it has won none. Is that just bad luck or does it suggest that there is something wrong with how the DFT procures the contracts? Do the Government think that huge DFT contracts are the right way to go about train procurement or should we look at letting the operating or rolling stock companies, which have great experience running such things, be in charge of the process? There is a suggestion that the very structure of the tender process made it hard for Bombardier to win. The phrase used was “bundled design, build, maintenance and finance” commercial structure—I find it difficult to get my head around that mouthful.

It was not a case of looking for someone to build trains and sell them, but a case of awarding a contract for someone to build, provide and maintain trains and keep them on the tracks for the best part of 30 years. It is a hugely complex financing exercise. I am not sure whether we were looking for a train-builder or a bank. One suspects that it is much easier for a huge multinational, diversified conglomerate with a brilliant credit rating to produce the cheapest bid, rather than the group that can build the best trains. I do not know about other hon. Members, but I am not sure that I can predict where I will be in 2045. I will be 70 years old, and I hope I will be getting a state pension by then, but I am not totally convinced of that. It is scary to think that these train carriages will be retired after me, but that is how long we are talking about.

The contract is to maintain the trains and keep them on the rails until 2045 or thereafter, which is a hugely difficult thing to do. How many of us can predict what the currency of many EU nations will be even in a year’s time? How many of us can predict how many major banks will still be solvent in a year’s time? And yet, we are asking the train-builders to come up with a finance package that in effect runs for that long period. How can they do that cost-effectively? The process started in 2008 and the state of the banks was even worse then than it is now.

Many hon. Members are concerned that the private finance initiative resulted in taxpayers paying people to borrow far more expensively than the Government could, and we ended up having to pay for that for 30-odd years. Is there not a risk that that is what we are doing with this? We are in effect locking people into a hugely expensive way of financing something, but if we did it better there might be a cheaper way.

I looked at some of the original tender documents from 2008, and there was an interesting presentation to interested parties in the “Commercial and Financial Overview”. On the financing side, it states:

“Consistent with HMT best practice, the Department will reserve the right to hold a funding competition”.

Have the Government considered that? If the financing costs made it hard for Bombardier to compete in the award of preferred-bidder status, did the Government think, “Actually, financing is a very risky thing for anybody to try and do for this long period. Should we take that out of the process and tender it separately?”? That might have been worth considering.

The same presentation outlines that the accreditation process structure had a weighting of 40% for business excellence and approach, and 60% for technical capability and experience. I do not know whether those weightings were used in the final process, but if they were, it would be interesting to understand how. We would all like to understand exactly how close these bids were. Where was Siemens stronger and where was Bombardier stronger? I fear that the answer to that probably involves hugely sensitive commercial data that the Minister cannot release today. We want people to understand why we are spending taxpayers’ and passengers’ money in this way, but it is hard to explain the process when we cannot access the full details.

One matter that has been raised—it would be helpful to have some clarification on this—is the lightweight bogie that will be used in the contract. For a contract that Siemens won in Germany, it had to use Bombardier’s bogie, and there is a joint contract in place for that. I understand—I cannot find any evidence for this on the internet—that Siemens has not managed to produce, test or bring into operation anywhere a lightweight bogie. The German train industry was not desperately keen to have its trains experimented on and tested, and therefore Siemens has used the Bombardier-made bogie to ensure that it gets the reliability from scratch. Frankly, such a situation seems a little perverse. The Germans give a contract to a German train company but they are not willing to have their trains experimented on, and we end up awarding a contract to a German train company for our trains to be experimented on rather than awarding it to the UK company that could have used its bogie, which it knows works.

Anecdotally, one of the attractions for Siemens was mentioned by the UK chief executive of Siemens rail industry operations, Steve Scrimshaw, in an interview with Rail Professional in March this year:

A lot of the DfT’s scoring is around deliverability and our trains work straight out of the box.”

Interestingly, that same article goes on to talk about the problems that Siemens has had delivering trains into Scotland, where they have not worked straight from the box and their entry into service was delayed by ScotRail until it could resolve some of the technical issues. It is not the case that Siemens delivers and works perfectly every time, and that Bombardier does not. The fact that Bombardier can win contracts in the UK and around the world shows that it probably has a similar quality of delivery to Siemens.

In light of those issues, the key question for the Government is this: can they and will they reconsider this decision before the contract goes to final status? Some of the concerns about the procurement process that I have set out have led my hon. Friends the Members for Mid Derbyshire (Pauline Latham), for South Derbyshire (Heather Wheeler) and for Erewash (Jessica Lee)—she sadly cannot be here today—and I to ask the National Audit Office to review this procurement process and examine whether we are getting the most economically advantageous position for taxpayers and passengers.

There are doubts whether the DFT is very good at handling these processes based on its experiences with the intercity express programme contract and this one. Let us be honest: this project was originally called Thameslink 2000, but these carriages might hit the tracks in 2015. That is not a tremendous procurement record. Is it right for the DFT to be handling these contracts? My hon. Friends and I have fundamental concerns about whether the right requirements were in the tender specification and whether we can come to the right decision. Therefore, there seems to be a strong prima facie case to have another look at the matter and ensure that we are spending £1.4 billion of taxpayers’ money in the right way.

We can talk about the history of the process and this contract for as long as we like but, whatever happens on that, we need to get these things right in future. The fact that the past two major contracts have not gone to a UK manufacturer is bad enough but, if we are to sort this process out and keep the train-building industry in the UK, we need to start getting such things right and ensuring that there is a level playing field. Let us be clear that no one is suggesting that we want Bombardier in the UK to be a new British Leyland. Bombardier does not want that and absolutely no taxpayer would want that. We have a company that can build high-quality trains for the right price, and it should get the chance to do that. We want a process that creates a level playing field, and for a UK manufacturer to have a fair opportunity to win contracts to build UK trains in the same way that German manufacturers can build trains in Germany and French ones can build trains in France.

What kind of message are we giving to the people we want to invest and manufacture in the UK? It seems that if someone wants to win a contract to build trains for the German rail industry, they must build them in Germany, and that if someone wants to win a contract in France to build trains for the French rail industry, they must build them in France. However, if someone wants to win a contract to build trains for the UK rail industry, they can build them where they like. If an investor is short of money and considering which countries to invest in, what will their conclusion be? They cannot close the French or German plants because they know that they will not win contracts in those huge markets, but they could close the UK one.

Duncan Hames Portrait Duncan Hames (Chippenham) (LD)
- Hansard - - - Excerpts

I congratulate the hon. Gentleman on securing the debate. I hope he recognises that the issue goes beyond just rolling stock and that it relates to the whole of the rail supply chain. Does he agree that the key question is this: why does the German industry not have more penetration in the French market, and indeed, why does the French industry not have more penetration in the German market, if both those countries are interpreting EU procurement law in the same way as us?

Nigel Mills Portrait Nigel Mills
- Hansard - -

I am sure that all our constituents are asking that question. If Germany and France do not open their markets, why do we open our markets so much? We all want a level playing field. If Germany and France are going to reward their industries, we may have little choice but to go the same way. The issue is not new, because the previous Government considered it in 2003. They commissioned a report on how the EU procurement processes were working to see whether there was unfairness or any inappropriate activity. As usual, the conclusion was that there was no clear illegality, but there appears to have been a slight distortion in the results. Interestingly, that report was written by the then UK chief executive of Siemens, Alan Wood. It is amazing how things come back round to bite.

Baroness Burt of Solihull Portrait Lorely Burt (Solihull) (LD)
- Hansard - - - Excerpts

I congratulate the hon. Gentleman on securing this important debate. On the parochial protectionism of other countries, is it not the case that the UK is exceptionally successful in winning EU bidding contracts elsewhere? In fact, we come after only Germany in terms of the number and value of contracts that we win throughout the EU, so it works both ways.

Nigel Mills Portrait Nigel Mills
- Hansard - -

I think that Germany wins 26% of the time when it bids, and we win about 14%. However, I am not sure that those statistics work when we are talking about major infrastructure projects that are of huge overall significance, rather than about some of the smaller ones. Frankly, across the EU as a whole, we are a hugely advanced economy, with all the high skills and the value added. Therefore, we expect the UK to be able to do things that other economies cannot yet do, and to be winning contracts. The key point is that thousands and thousands of jobs are at stake. We are risking those jobs by playing by the rules, but it seems that the Germans, French and others are not.

Let us consider the Eurotunnel procurement. That contract was awarded not to Alstom of France, but to Siemens of Germany, which must be doing something right. The French went mad and had a judicial review to try to challenge that contract, because they were so surprised that it had not been awarded to one of their domestic companies. We have to send out the message that we want to encourage our UK train-building industry, which is of huge value to us, and we want the Government to support it.

Perhaps we need to consider again how we go about procuring these train-building contracts. For many years, Bombardier has questioned how sensible it is to have a feast of contracts and then a famine. How does that enable it to be a sustainable, viable business? How does having to recruit and skill up to fulfil one contract and then lay people off and start again make a company cost-effective and ensure that we are getting the best price for our trains? How can Bombardier continually develop in the UK and improve its processes if it does not know from year to year whether it will have a viable manufacturing business in the UK?

Let us not set any hares running. We all hope that Bombardier will retain a strong manufacturing presence in the UK and that this will not be a fundamental threat. However, it is a significant contract, especially on the back of its not winning the intercity express programme contract. It would be helpful if the Government set out what other contracts they expect to award in the rest of this Parliament, and how significant their value may be. We know that Crossrail should be one contract. Many have raised the question whether the Government can now bring forward that Crossrail procurement in the hope that Bombardier can win it and try to protect jobs in the Derby area.

Some have suggested that the Crossrail contract is very closely linked to the Thameslink contract. The amount of cross-savings between the two might make it very hard for a company that does not have the Thameslink contract to deliver Crossrail competitively. Will the Minister confirm that that is not the case, and that it is open to the Government to award the Crossrail contract to a different provider?

Andrew Griffiths Portrait Andrew Griffiths (Burton) (Con)
- Hansard - - - Excerpts

I congratulate my hon. Friend on securing the debate. Bombardier is a major employer in my constituency, too. He has discussed the success of Bombardier and its ability to win contracts. Is he aware of the statistics that show that of 14 contracts that Bombardier bid for that were not related to the Department for Transport, it won 11, yet of all of the contracts it has bid for with the Department for Transport, it has won not a single one?

Nigel Mills Portrait Nigel Mills
- Hansard - -

I am grateful for my hon. Friend’s intervention. Had he been here from the start, he would have heard me quote those very same statistics. His point is valid, however, and he reiterates the question whether the Department for Transport is handling those procurements in the most effective manner.

I conclude by asking the Minister some questions about future procurement processes. Do the Government think that there is a need for improvement? Should the Department for Transport be handling them? Will the Department guarantee that the socio-economic benefits will be given some weighting in that process? Can the contracts be structured so that UK manufacturing industry has a chance of a sustainable, viable future? Can we look to structure those contracts in a way that gets trains built, and not look for the biggest bank we can find to underwrite 30 years’ worth of financing?

No one should doubt that the train-building industry is of great importance to the Derby area and the UK economy as a whole. We have a proud heritage of train building. We can and should have an exciting future of train building. I urge the Government to do their bit to ensure that that is what we get.

--- Later in debate ---
Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

I am saying that, as the Minister, I need to abide by the law and by our obligations under the European Communities Act 1972 and the treaty of Rome; I am afraid I have no choice in that. Going forward, we of course recognise the need to examine wider issues about whether the UK approaches the application of EU procurement rules in the right way and achieves the right balance of risk. Similarly, I agree with my hon. Friend the Member for Amber Valley that we need to see whether our approach is consistent with those used in other member states. That is why the issue will be considered as part of the Government’s growth review.

Nigel Mills Portrait Nigel Mills
- Hansard - -

On that point, I would like to draw my right hon. Friend’s attention to another quote from Mr Scrimshaw, who is the head of Siemens’s train building in the UK. Rail Professional asked whether he would ever look at building in the UK, and he replied:

“I wouldn’t rule it out. Currently, all the tenders from DfT don’t include requirements for UK manufacture. We have a model that works quite well.”

It seems that Siemens did not entirely rule out the possibility that such a requirement might exist. Perhaps the Department could look at that in future.

Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

Even if we had designed the criteria, it remains the case that we could not have made the location of the manufacturing process a condition of successfully achieving the contract; that is simply not permitted by EU law. However, I totally deny the allegation that the Government are sitting back and not taking action. I agree that we need to take action to help Derby and Bombardier. The reality is that Bombardier advised the Department for Transport that it expected to make more than 1,000 redundancies, regardless of the outcome of the Thameslink procurement, because several of its orders are about to reach completion. However, whatever the reason for the redundancies, we want to try to help Derby and the surrounding area at this difficult time.

As a result of the review by Bombardier of its UK rail operations, the Business Secretary has set up an economic response taskforce. It will he headed by Margaret Gildea and its remit will be to mitigate the economic impact of job losses at Bombardier, in its supply chain and in local communities. It will draw on representatives from Derby city council, the county council, Derby college and the Skills Funding Agency. Jobcentre Plus will also deploy its rapid response service, to support workers who will be affected. That is in addition to the work on skills that the Government have been involved with in Derby in partnership with Rolls-Royce and Bombardier, and the support that the Department for Transport is giving to the National Skills Academy for Railway Engineering, which my hon. Friend the Member for South Derbyshire (Heather Wheeler) mentioned. We shall do our best to help Bombardier to get the overseas contracts it is bidding for, such as in South Africa. That is one reason why representatives from Bombardier will accompany the Prime Minister on his visit to South Africa, which is coming up.

Oral Answers to Questions

Nigel Mills Excerpts
Thursday 23rd June 2011

(12 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

I am sure the hon. Lady will be aware that the redevelopment of Farringdon station involves Crossrail and Thameslink. It is going to be an exceptionally busy and important station after that and there will be toilet facilities. It is intended that those facilities will be provided in the London underground aspect as part of the Thameslink upgrade, so Crossrail passengers are likely to have access to facilities nearby as part of the London underground upgrade.

Nigel Mills Portrait Nigel Mills (Amber Valley) (Con)
- Hansard - -

When it comes to providing toilets, and indeed the whole rolling stock, will the Minister assure me that there will be a level playing field so that there is a fair chance that rolling stock can be constructed in Derby in the UK, rather than in Germany as in the announcement last week?

Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

It is vitally important that all procurement processes are entirely fair to suppliers, including Bombardier.

A38 (Amber Valley)

Nigel Mills Excerpts
Wednesday 16th March 2011

(13 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Nigel Mills Portrait Nigel Mills (Amber Valley) (Con)
- Hansard - -

It is a pleasure to speak under your chairmanship, Dr McCrea. I am grateful to have the chance to raise this issue, which is of great importance to many communities throughout my constituency.

It would help to start by putting the issue in context, in case the Minister is not fully familiar with the stretch of road. The A38 is a dual carriageway, providing a convenient link from the M1 to Derby and on to Birmingham. Despite the efforts of some signposting on the M1, it is an attractive commuter route to Birmingham, especially when faced with the risk of delays on the M1 and M42, the generally suggested route.

Since the road was constructed about 30 or 40 years ago, the level of traffic, especially heavy lorries, using it has grown consistently, exacerbating the noise. There is real concern that the level of traffic will only continue to increase. There are some proposed developments, including one in my constituency that would add a new junction to the road and a new business park. As a result, we would all expect to see an increase, certainly in heavy goods traffic.

Employment and jobs are attracted into my constituency by the great transport links provided by the road, especially to the various industrial parks nearby. That is not something any of us wants to stop. I suspect the strategy for increasing the number of jobs is to build on the attractiveness of the road. However, that leaves us with the problem that a number of people up and down the road are suffering significantly from the level of noise.

It is useful to paint a picture of the geography of Amber Valley. The clue is in the name of the constituency. It is made up of lots of hills and valleys, through which the A38 sweeps. In places the road is higher than the neighbouring houses, and in others the houses look down on the road. Those two situations suffer some of the most significant noise problems.

Various communities up and down that nine-mile stretch of the road are in my constituency. We can start in the south in the small village of Coxbench, working northwards to Rawson Green and various bits of the town of Ripley that are quite close to the road. Moving further north, we come to Swanwick; that, too, abuts the road. The place that perhaps suffers the most significant problem, given the volume of houses, is the town of Alfreton. I have not listed every place that suffers an impact from the road, because my constituency contains so many separate communities.

It will be useful to explain the history of the road. Some places that are affected were there before the road was built. Sadly, when the road was constructed, the present rules and regulations on how close to houses new roads can be built, or on what noise abatement measures should be put in place, were not in force. We ended up with some slightly strange situations where houses are incredibly close to the road.

In various places, the road almost goes over houses, and some unfortunate people in Alfreton live in houses that are almost sandwiched between the A38 and the slip road that joins it at that point. One can only imagine the level of noise suffered by those who live there. I have visited one of those houses, and even with double glazing and with all the doors and windows closed there is a constant burr of noise when the road is busy; when the windows or the back door are open in the summer, the noise is unbelievable. It is not something that any of us would choose. The noise obviously has a major impact on quality of life.

I have tried to stress how significant a problem it is, although I do not doubt that it is a problem for all who live near trunk roads. The problem was recognised by the previous Government, because noise action plans for major roads were signed off by the then Secretary of State almost a year ago, on 15 March 2010. They set out action plans for tackling the problem.

A study has come up with some scary statistics. For instance, 9.7 million people in the country have to live with noise of more than 55 dB from major roads. That figure falls as the level of noise increases; about 74,000 people have to live with noise of more than 75 dB. Having experienced what I suspect was noise of more than 75 dB, I can tell the House that urgent action is needed. The study says that dealing with those locations is the first priority. The details provided by the Highways Agency show that four patches in my constituency fall within those first priority locations—Coxbench, Rawson Green and two stretches in Alfreton.

I have some concerns about exactly how that study was done. I was told that it was a desktop study that mainly considered distances between houses and the road. I do not know whether it took account of the fact that the road towers over houses or that other houses are somewhat higher than the road, but the nature of valleys can cause the noise to echo, resulting in the noise being louder than expected from a distance. Perhaps further work needs to be done to validate whether those sites, too, should be a first priority. I have listened to the noise in some parts of my constituency, and I am surprised that they are not shown as being at the same level as those that are considered to be first priority.

That leads me to the two themes that I hope the Minister will address. First, when can we expect to see action for those who live in first priority locations? Secondly, where will that leave those who are not in those locations? The action plan produced a year ago sets out four potential courses of action for those who live in first priority areas. In simple terms—I am not an expert—they are to erect noise barriers, with which we are all familiar; to install low-noise surfaces; to introduce traffic management measures; and to improve the noise insulation of affected properties. I suspect that on this stretch of the A38, traffic management measures will be a challenge, as it is a long run with no junctions from the M1 to Derby, and it attracts some to drive at high speeds—except at the rush-hour peak, when the traffic tends to back up.

Norman Baker Portrait The Parliamentary Under-Secretary of State for Transport (Norman Baker)
- Hansard - - - Excerpts

To what extent does traffic divert from the A38 to the B6179, which seems to run parallel to it for a long stretch?

Nigel Mills Portrait Nigel Mills
- Hansard - -

As with all such matters, trying to work out who uses what route at what time and for what purpose is a challenge. The A38 is a major trunk road, and unless there is a problem for those travelling through Amber Valley from Derby to the M1 or vice versa, I suspect that they are unlikely to divert to other routes. People who are making short, local journeys will clearly take a different view, and there are other options for those who might prefer a different route, but it depends where they are going. Most of the noise problems are caused by heavy goods vehicles going at significant speeds, but it is unlikely that HGV drivers would divert from the main road.

I doubt whether traffic abatement measures will help. If we were to say that the solution was to reduce the speed limit to 50 mph, we would hear howls of protest, especially as the Government are apparently talking about raising the speed limit on motorways to 80 mph. If the speed limit on the A38 were reduced, I am not sure how many drivers would observe it, given that many do not observe the existing speed limit.

A low-noise surface would be an attractive solution. It is used in some places, but I understand that funding does not allow the proactive replacement of such a surface; in most cases we have to wait until the existing surface has worn away and needs to be replaced, at which point the change could be made. I wonder whether there is any scope for proactive replacement of that surface where there is a clear problem. That leaves the erection of noise barriers, when effective, or helping people to insulate their houses.

The study suggested four potential outcomes for people in high-priority areas. The first is the implementation of action, with financial resources being immediately available. That sounds like a great scenario. Will the Minister say what financial resources will be immediately available? I am not sure that we in Amber Valley look forward to his answer.

The second is the implementation of action but with no immediately available resources. That may be possible, but what resources does the Minister expect to be available in the short to medium term, and how are we to go about finding them? The problem is caused by the Highways Agency’s trunk road and there is a duty to take some action. It is not a discretionary matter, where people can say, “Yes, we know it’s a problem but it is not our problem.” There is a duty to act.

The third is that action is possible but there is no scope to construct or there are overriding technical problems. The worst potential outcome is that action will not be possible owing to large adverse effects—perhaps environmental matters.

The questions are these: what can be done and when can it be done? It is all about timing. My constituents have known about the problem for many years, and have been waiting for some kind of action. There is an action plan, and I suspect that everyone wants to see progress being made. Will the Minister say when he expects to see these projects being started? I am not sure that I can press him for this level of detail, but when can we expect to see some help in Amber Valley? The action plan implies that some of the action will start from April 2011. Is that still the case, or is there likely to be some delay?

I wish to raise one more matter, as I want to give the Minister plenty of time to respond.

Neil Carmichael Portrait Neil Carmichael (Stroud) (Con)
- Hansard - - - Excerpts

You are probably wondering why I am intervening on the subject of this road, Dr McCrea. It is because it goes through my constituency as well. There are two points that I should like to bring to the Minister’s attention. First, we have difficulty with the varying speed limits, and it would be easier to have a consistent speed limit for some parts of the A38. Secondly, we need to lower speed limits to deal with the problems of noise. Can the Department for Transport be more flexible and allow our local councils to alter speed limits to suit local needs?

Nigel Mills Portrait Nigel Mills
- Hansard - -

I am grateful for that intervention. I was talking about speed a few minutes ago. Although such a solution would be helpful for my hon. Friend, I struggle to see how practical it is as an option and how likely it is even to be observed.

Before my hon. Friend intervened on me, I was asking about the people who are not in the areas of first priority. What hope do they have of seeing some noise mitigation measures even in the medium term? Will this Parliament only be able to deal with those in the first priority areas, or is there some hope for the next highest band? A significant number of people who are not in the first priority area have to live with noise of more than 60 or even 70 dB. If it is unlikely that we will have any significant amounts of funding from the taxpayer to deal with that, what other options are available? Is it possible to consider match funding? If there is some significant development in the area that will increase traffic, is there a way in which we can raise section 106 contributions to put in noise barriers, even if they are not exactly adjacent to the new development? It is probably not right to rule out any option. If we think creatively, we may be able to improve the quality of life for people who live in these areas.

I hope that the Minister can give me some good news on when we will start seeing some action. At the very least, I hope that he can help my constituents to understand what the timings and processes are before we can resolve this long-standing issue.

Norman Baker Portrait The Parliamentary Under-Secretary of State for Transport (Norman Baker)
- Hansard - - - Excerpts

I thank my hon. Friend the Member for Amber Valley (Nigel Mills) for raising the important subject of traffic noise and securing time to allow us to debate the issues. I speak for the Government on 97% of the roads in England—the local roads. The Under-Secretary of State for Transport, my hon. Friend the Member for Hemel Hempstead (Mike Penning), deals with trunk roads and motorways, so the A38 is one of his roads. Unfortunately, he cannot be here today, so I am standing in for him. I will discuss with him the issues that have been raised today and draw his attention to my hon. Friend’s comments about the road in his constituency.

Nuisance from traffic noise is an issue that the Government recognise. Action is being taken to reduce the problem and real progress continues to be made. The strategic road network provides the backbone for the distribution of goods, services and people within England and beyond, thus providing a valuable contribution to the UK economy.

The network carries a third of all traffic and two thirds of all freight traffic, but represents only 3% of the road network by length in England. With such a concentration of use, combined with the speed of vehicles, noise from motorways and high-speed trunk roads is an understandable concern for those living close to them.

My hon. Friend has raised a number of concerns about traffic noise at sites along the A38 in his constituency. I sympathise with his concerns and I will explain our policy on dealing with traffic noise from roads and what measures the Highways Agency has taken, and will take in the future, to deal with the issues identified by him.

Before 1998, the assessment of noise impacts was carried out only for new roads. Where noise levels have been predicted to be high as a result of the construction of a new or improved road, measures such as noise barriers or earth embankments are normally included in the design of the road as a means of reducing noise to more acceptable levels. Where such measures cannot be provided, either because of high costs or for practical reasons, there are provisions in the Land Compensation Act 1973 and the Noise Insulation Regulations 1975 for the provision of noise insulation at the affected properties. Such measures have, for many years, provided protection against increased road noise for those affected by new roads.

Since 1998, quieter surfacing materials have been installed on new strategic roads as a matter of course. They have also been installed on existing strategic roads when they have required resurfacing to restore them to a safe and serviceable condition. Such materials have provided significant reductions in traffic noise for many in recent years.

The UK has used quieter surfaces from as early as the 1970s, developing the use of porous asphalt, which was known to reduce tyre noise as well as spray in wet conditions. That material has successfully been used for a number of years on some strategic roads, but it is a more costly solution than recently developed materials. Further progress has been achieved in the development of a new generation of quieter surfacing materials, which are cost-effective, reduce the time needed for resurfacing and can be used routinely on motorways and other high-speed trunk roads. To date, 40% of the strategic road network has been resurfaced with these materials, including a section of the southbound A38 between Ripley and Rawson Green.

The Highways Agency regularly reviews ways in which it can maintain the network in the most cost-effective way. It is currently reviewing maintenance strategies for the strategic network in its drive to reduce cost. I will ask the Highways Agency to keep my hon. Friend informed of the outcome of the review, particularly if it has an impact on future maintenance of the A38 in his constituency.

My hon. Friend mentioned resurfacing as one of the possible ways in which to deal with these matters. I am advised that the Highways Agency policy is to install quieter surfaces when a road is due to be resurfaced, but it will not resurface a road solely for noise-abatement purposes. That is deeply frustrating for hon. Members. I have been trying to persuade the Highways Agency to resurface the A27 in my constituency for similar reasons, so I understand the concerns that he and his constituents have. I am advised that there will be not much new surfacing along this particular stretch of road for the next four or five years.

Looking to the future, we will continue to manage road traffic noise levels as a result of the introduction of the environmental noise directive. The directive requires member states to undertake five-yearly cycles of noise mapping and action planning for all major sources of environmental noise, including that from road traffic.

This approach will help us to understand the extent of traffic noise problems alongside our major roads, and to identify where action to reduce road traffic noise needs to be taken, subject to funding being available. Although the Department for Environment, Food and Rural Affairs has overall responsibility for delivering the directive’s requirements in the UK, the Highways Agency has been working with it for a number of years to deliver its noise mapping and action planning requirements.

The first round of noise mapping results were published in May 2008 by DEFRA. That was followed in March 2010 by the noise action plans, which were designed to identify important areas that sustain impacts from major sources such as road traffic. The action plans require those important areas that contain first priority locations to be investigated initially. My hon. Friend referred to those locations in his constituency. I am advised that there are about 1,500 important areas containing first priority locations along the strategic road network. Two of those are along the A38 within his constituency and, as he is aware—from his meeting with Highways Agency officials on 16 August last year—they are at Rawson Green and Coxbench.

Nigel Mills Portrait Nigel Mills
- Hansard - -

The details provided by the Highways Agency have identified some further locations in Alfreton in addition to the two at Coxbench and Rawson Green. Is that something that is not correct now, or is it something that the Minister needs to check?

Norman Baker Portrait Norman Baker
- Hansard - - - Excerpts

The information that I was given by officials is that there are two areas on the A38 within my hon. Friend’s constituency, but as he has put his query on the record, I will ensure that either I or my hon. Friend the Member for Hemel Hempstead writes to him to clarify that point.

As with all important areas with first priority locations, the agency will investigate the sites at Coxbench and Rawson Green during 2011. Those investigations will identify what measures could be effective at reducing noise levels at the individual locations. As they are not yet complete, I cannot confirm what measures will be identified at the two sites and whether any funding will be available to install them. However, I will ask the Highways Agency to inform my hon. Friend of the outcome of the investigations at these two sites when that information is available. If there is any further information that is available when I or the Under-Secretary of State for Transport, my hon. Friend the Member for Hemel Hempstead, write to him about the points that he has raised in this debate, we will include it in the letter so that he has the most up-to-date information available at that stage.

My hon. Friend the Member for Amber Valley also mentioned a number of possible solutions. Barriers will obviously be considered as a potential solution, if their use is thought to be appropriate. I must make it clear that I am not promising that barriers will be installed, but they will be considered just as a matter of common sense. Obviously, barriers have a cost and an impact on the countryside, and those factors must be taken into account when considering the use of barriers on any trunk road in the country.

My hon. Friend is probably right to say that the potential for traffic management on the A38 in his constituency is limited, although I note his comment about speed limits. Again, I will pass that back to the Under-Secretary of State for Transport, my hon. Friend the Member for Hemel Hempstead. In addition, my hon. Friend the Member for Stroud (Neil Carmichael) made an intervention about speed limits. The general approach of the Department and indeed of the Government is to move towards having more localism, but obviously speed limits for local roads—the 97% of roads that are within my portfolio—more easily lend themselves to local authority influence than speed limits on trunk roads. However, if a local authority, particularly a highway authority, wants to suggest a speed limit for a motorway or, more likely, a trunk road, there is no reason why that suggestion should not be fed in to the Highways Agency and properly considered at that stage. If there are particular views about the speed limit on the A38, I encourage hon. Members to feed them in to the Highways Agency or to the Under-Secretary of State for Transport, my hon. Friend the Member for Hemel Hempstead.

There was also mention of section 106 agreements. In principle, section 106 agreements can be designed and used to achieve helpful changes to the road network in a particular location, if they are germane to the planning application that has been submitted and agreed to. However, that is really a matter for the local authority—the planning authority—to take forward and to determine what, if any conditions, are appropriate for a section 106 agreement. That is not a process that we would get involved with directly, but if there was a feeling in an area that section 106 money should be used to tackle a trunk road problem, obviously the Highways Agency would want to become involved at that stage, to discuss whether or not that course of action was appropriate for that location.

My hon. Friend the Member for Amber Valley also mentioned the action plan on noise. As he knows, that plan has already been published by DEFRA and, as I have already said, at the start of next month the Highways Agency will begin to consider noise mitigation measures that, in theory, can be installed in 2012-13.

Lastly, the policies that are already in place have led to significant improvements for many residents living close to strategic roads across England. Real differences have been made and we will continue to help those people who are most affected by road traffic noise in the long term, including people in my hon. Friend’s constituency.

Nigel Mills Portrait Nigel Mills
- Hansard - -

I am grateful to the Minister for those comments. The “pushback” that we get from constituents is that these action plans are meant to be five-year action plans and what we all want is that, during the five years of these plans, we actually see some action. Is the Minister suggesting that we will start to see some action on some of the 1,500 projects around the country during the life of this Parliament, or is it likely that the funding constraints will mean that there is little chance of these noise hot spots being dealt with during that time? He was not entirely clear about how much resource was immediately available to address these issues.

Norman Baker Portrait Norman Baker
- Hansard - - - Excerpts

Dr McCrea, I had actually finished my response to the debate, but I am happy to take a further intervention and respond to it as best I can. My hon. Friend will be aware that the resources that are available at the present time are stretched, because of the appalling inheritance that we received from the last Government. Therefore, we have had to look carefully at where we spend our money. On the other hand, we have legal obligations—for example, the environmental noise directive—and we will seek to discharge them.

If there is any further information that I can add about time scale in the letter that we will send to my hon. Friend—it will come either from myself or from the Under-Secretary of State for Transport, my hon. Friend the Member for Hemel Hempstead—after this debate, we will do that. We will certainly try to include as much information as possible at that time. I hope that that response has been helpful.

Rail Services (Erewash)

Nigel Mills Excerpts
Tuesday 7th December 2010

(13 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Jessica Lee Portrait Jessica Lee
- Hansard - - - Excerpts

My hon. Friend makes a good point, and I agree. The possibility of enjoying the benefits of employment and the ability to travel to work would be much improved. As my hon. Friend suggested, that would revitalise the whole of the east midlands up to Sherwood.

Any proposal for a train station would be backed by the local business community in Erewash. Our excellent local business group, the Erewash Partnership, certainly supports the campaign. I had better declare now that the local MP is always asked to sit on the partnership’s board, and it is a real privilege and honour to do that. The partnership would assist wherever needed to help the plan come to fruition.

Turning to the approach taken by the coalition Government, I have been encouraged by the observations made by my right hon. Friend the Chancellor in his Budget speech in June, and by the Secretary of State for Transport, on the importance of rail travel. In his recent statement of 25 November, the Secretary of State set out the Government’s plans for investment in rail infrastructure and rolling stock.

I have undertaken meetings in recent weeks and months with the borough councils and the county council in Derbyshire. I have written to the leader of Derbyshire county council, and I am encouraged by the reply that I have received. That letter, from Councillor Andrew Lewer, dated 25 November, confirms that the station proposal, the estimated cost of which is £5 million to £6 million, is one of the major transport infrastructure proposals in the local transport plan, and that it is deliverable within the time scale of the current Parliament. Further, he accepts that the plan offers good value for money.

I am further encouraged by the fact that, following my letter, the leader of the council accepts that serious discussions will take place next year and, importantly, that a bid for funding from the regional growth fund will be made in January 2011. Of course, I support that bid, which will be made through the newly formed local enterprise partnership. That is good news, and I am grateful that the county council is making the application in the short period before the January deadline.

Having addressed the social and economic case for a station in Ilkeston and put it in its historical setting, I hope that my right hon. Friend the Minister will agree that there is a powerful case for a station to be reopened in Erewash, particularly in the Ilkeston area. I will do all I can to support any proposals to make this project a reality.

Nigel Mills Portrait Nigel Mills (Amber Valley) (Con)
- Hansard - -

I congratulate my neighbour and hon. Friend on securing the debate, and I praise her long-standing commitment to this cause. As she knows, some of her constituents are likely to use Langley Mill station in my constituency. Will she join me in calling on East Midlands Trains to sort out access to the platforms there at long last? Southbound passengers arriving at Langley Mill have to go down a steep and slippery flight of steps. There is also no disabled access, and the only option for disabled people is to get a train into Nottingham and back out again so that they can use the other platform. There have been many promises over the years that the situation will be sorted out. Most recently, we were promised some sort of chairlift, and it would help rail passengers in both our constituencies if progress could be made on that.

Jessica Lee Portrait Jessica Lee
- Hansard - - - Excerpts

I am grateful to my hon. Friend, who makes a good point. Of course, there must be suitable disabled access at Langley Mill. I would similarly campaign for such access at any new station at Ilkeston, although I am sure that there would be appropriate access for those who are less able. With those remarks, I will conclude.

--- Later in debate ---
Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

I am grateful to my hon. Friend. A striking aspect of the comprehensive spending review was the Chancellor’s commitment to continued investment in our transport infrastructure. Past spending squeezes often meant that the axe was taken to a whole range of transport upgrade projects. We have decided not to do that, because those projects can play an important role in generating the growth we need to get out of the economic mess left by the previous Government. Integrating different modes of transport can, of course, yield important benefits for passengers and, similarly, valuable economic benefits, if people have better access to different modes of transport and we try to co-ordinate them.

Nigel Mills Portrait Nigel Mills
- Hansard - -

I concur with the Minister’s assessment. The Liverpool-to-Norwich train was taken off from stopping at Langley Mill, and was effectively replaced by the Leeds-to-Nottingham service, which stops twice in my constituency, at Alfreton and Langley Mill. That service has proved very popular, according to the number of people I have seen on that train when I have used it.

I would strongly oppose any timetable changes that removed that service from stopping at either of those two stations in my constituency. This proposal should be an incremental addition to that service, not a replacement. There have been rumours of a threat to Langley Mill station if Ilkeston were reopened. I would urge the Minister not to go down that route.

Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

I am not aware of any intended subtractions of services. As my hon. Friend says, we are discussing today whether it is realistic and practical to add a service and a station at Ilkeston, but he makes a good point.

The third of the questions that I posed at the start of my speech was whether commercial incentives alone would motivate train operators to call at a new station at Ilkeston. That is another important issue that we need to address. Before going ahead, the Department would expect the county council to confirm with Northern Rail whether it would be prepared to stop at a new station. However, its franchise is coming to an end relatively shortly, and it is not easy to predict what approach a future franchisee might take. Although the studies undertaken for the county council indicate that revenue from the station calls would outweigh the costs of its operation, train operators might take a different view of the impact of journey-time changes on longer distance passenger numbers, and hence on ticket revenues.

The Department for Transport is certainly prepared to consider whether it would be justifiable and appropriate to include obligations in relation to the new station in the future franchise contract. As the House will be aware, the Government have been assessing how to reform the franchising process, and we made a further announcement on that today. We want to see a move away from the specification of highly detailed inputs that leave little flexibility for train operators to innovate and respond to the changing needs of passengers. That said, franchise contracts under the new system will continue to contain obligations on service levels. We could consider whether that should include obligations in relation to a new station at Ilkeston.

The issues raised by the third question that I posed look as if they also could be resolvable. However, I would emphasise the word “resolvable”, not “resolved”. It is important to ensure that the commercial case for the station is rigorously assessed, so that the Department, the county council and train operators can be as confident as we can that the new services would be commercially viable. That is pivotal. Without that confidence, it is difficult to see how the project can get off the ground.

I am grateful to my hon. Friend the Member for Erewash for the opportunity to give an indication of the Government’s approach. In conclusion, it is clear that the coalition will face difficult decisions if we are to address the crisis in the public finances that we have inherited and get our economy back on track.