All 2 Debates between Michael Fabricant and Frank Dobson

High Speed 2

Debate between Michael Fabricant and Frank Dobson
Wednesday 25th March 2015

(9 years, 1 month ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Frank Dobson Portrait Frank Dobson (Holborn and St Pancras) (Lab)
- Hansard - - - Excerpts

I thank my right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) for her kind remarks about our co-operation and for thanking the various bodies concerned.

Today’s report from the House of Lords Economic Affairs Committee batters great lumps out of the case for HS2. The Committee did not ask any questions that we have not been asking for the last five years. HS2 had no satisfactory answers before, and it apparently still has none.

I want to draw attention to the situation in my constituency, which is the most affected by the proposals. The proposals involve the demolition of the homes of about 500 people and would leave about 5,000 people living next to Europe’s biggest building site for the best part of 15 years.

Under the original proposals, HS2 was going to knock down Euston station and rebuild it, incorporating a further 75 metres to the west to provide space for everything, including the new high-speed line. Originally, that was going to cost £1.2 billion. Eight months later, a revised estimate of £2 billion was put forward—the figure had gone up by just £100 million a month. Apparently, £2 billion was too much, so the scheme was cut back, which would have given us a rather elegant lean-to shed for HS2 at the west side of Euston station, at a cost of £1.4 billion. That is what was in the Bill that came to the House of Commons. By the time it got here, however, we were told that that was not going to be done any more and that we would go back to the vast new scheme. The detailed proposals for that scheme were supposed to be available in October last year. Recently, in meetings with local people, however, HS2 has admitted that it has no such proposals and that it is going back to the lean-to shed version, which will now cost £2.6 billion. Who would put £50 billion on a racing stable that produces rubbish like this?

We were told that a supposed connection to the channel tunnel link would bring all sorts of benefits: people would be able to get on a train in Manchester and go to Paris. We told HS2 that that was not a workable proposition, and even the Institution of Civil Engineers said it was not, but no, HS2 persisted—and then the connection was abandoned. One explanation was that HS2 had come across “unforeseen factors”, including the need to “widen the route”. Now, anybody who starts an engineering project without realising that they will need to widen the route if they add some lines really is not fit to be put in charge of spending £50 billion.

Michael Fabricant Portrait Michael Fabricant
- Hansard - -

Is my right hon. Friend—I will call him that—aware that the completion of Birmingham New Street, including a new department store, has been delayed by a year and a half because of construction problems? Who is doing the project? The selfsame people who are supposed to be designing the new Euston HS2 terminal.

Frank Dobson Portrait Frank Dobson
- Hansard - - - Excerpts

I should add, Mr Betts, that the people who have been making those preposterous estimates, coming up with ludicrous proposals that will not work, are all very well-rewarded consultants. I believe that they have already had three quarters of a billion pounds in fees, so hard-working consultants are doing rather well. As far as I can see, the only train that has actually moved is the consultancy gravy train.

I advise people that if we want to benefit the cities of the north, the answer is to invest in the cities of the north and their immediate transport requirements, rather than spending what it is now believed will be £7 billion on a full-scale development of Euston. Will Sheffield, Leeds or Manchester benefit from an investment of £7 billion in Euston? Euston certainly will not benefit, and I do not think anywhere else will.

High Speed Rail (London – West Midlands) Bill

Debate between Michael Fabricant and Frank Dobson
Tuesday 9th September 2014

(9 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Michael Fabricant Portrait Michael Fabricant
- Hansard - -

Following the point that the right hon. Gentleman has just made, does a blank cheque come to mind?

Frank Dobson Portrait Frank Dobson
- Hansard - - - Excerpts

Pretty much, yes, although I am opposed to the daft £20 billion cheque in the first place, and have been all along.

What bothers me, besides the famous “connected purposes” let out, is that we are also told:

“That these Orders be Standing Orders of the House.”

According to HS2, the changes we are considering—or not really considering—this afternoon are minor, and we are placing this procedure within the Standing Orders of the House so that we have a sort of modern precedent for the Clerks to rely on if challenged. What concerns me is that the proposals that will eventually be made for the Euston part of my constituency cannot be considered as minor by anyone on earth.