New Housing Design Debate

Full Debate: Read Full Debate

Mary Robinson

Main Page: Mary Robinson (Conservative - Cheadle)
Tuesday 5th September 2017

(6 years, 7 months ago)

Westminster Hall
Read Full debate Read Hansard Text

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Neil Parish Portrait Neil Parish
- Hansard - - - Excerpts

I thank the hon. Lady for her intervention. I do not know about the individual case, but I suspect it is similar to those we all get when redress is not available. An ombudsman could intervene directly to get the builder to rectify the situation quickly. That is what the issue is about. Builders often rectify problems eventually, if they have not gone bankrupt in the meantime or used other wheezes to make sure they do not carry out improvements and repairs. If someone buys a new house, they should be able to get quality, and redress if there is a problem. We must accept that when a new home is built, there can be problems with it. I accept that, but there must be proper redress.

Before this debate, I asked members of the public on the House of Commons Facebook page to give examples of problems they have had with their new homes. There was a very strong response. They reported leaky pipes, faulty front doors, abandoned rubble and necessary re-rendering. A whole host of new build problems were raised. The anecdotes were depressing and are backed up by hard evidence. The national new homes customer satisfaction survey showed that an overwhelming 98% of new home buyers had reported snags or defects to the building after moving in. Over four in 10 reported more than 10 faults. That is shocking in a new property.

Mary Robinson Portrait Mary Robinson (Cheadle) (Con)
- Hansard - -

A new homes ombudsman would provide a great opportunity to look again at the system of warranties and perhaps assurances. As my hon. Friend will know, modern methods of construction offsite would require an assurance rather than a warranty. Is there an opportunity to look at assurances and warranties again and to give consumers the powers that they need to get decent homes and the good build that they require?

Neil Parish Portrait Neil Parish
- Hansard - - - Excerpts

I thank my hon. Friend for her intervention. That quality of assurance rather than a warranty would work much better. The National House Building Council can act, but once a builder has started repairs, it can do no more. If the builder takes a long time to instigate repairs, there is no real redress. That is where there is a role for an ombudsman and an assurance scheme so that building is delivered to a high standard and builders are held accountable. I value that point.

If a customer buys goods in a shop, there is an automatic power of redress, but if someone spends their life savings on a new home, they may struggle for years to get what they paid for. If we make the mistake of erecting millions of poor-quality homes in the next decade, the public will never forgive us. We are building to higher standards, including insulation standards, but we must make sure that houses are designed to fit in with the local area, with regional variations so that one does not see exactly the same designs all over the country, whether in the north of England, Devon, Wales or Scotland. One could almost say, “Well, we’ll have an off-the-peg development,” and all the homes would look the same. I have explained what I want to see in the future, and the cost will not be that much greater if we use a little more imagination as we build.

As things stand, the National House Building Council cannot step in if the builders claim that they are dealing with the problems, and there seems to be no time limit on how long a builder can spend dealing with problems. That is where a new homes ombudsman could step in to close the loophole. That would give a wake-up call to all house builders—many are good, but many are not—to sharpen up their act and build to the design standards and quality that they promised. Builders would know that they could not cut corners, as redress would be swift and exacting.

The all-party parliamentary group for excellence in the built environment, chaired in the last Parliament by my then hon. Friend Oliver Colvile, published a report last year on the quality and workmanship of new housing. Its No. 1 recommendation was for a new homes ombudsman. I think that the screw is beginning to turn on this issue. We need to take action. This country is going to embark on a big house-building drive. Those properties are needed, but we must ensure that they are built in the right way. Let us seize the opportunity and give people the sort of housing designs that they want. I am talking about quality, popular designs, with community backing, and all backed up by a powerful new housing ombudsman. I look forward to the Minister’s response.