Mark Tami
Main Page: Mark Tami (Labour - Alyn and Deeside)Department Debates - View all Mark Tami's debates with the Department for Transport
(13 years, 5 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I thank the hon. Gentleman for his thoughtful contribution—many thanks.
Finally, let me deal with the so-called Rail Plan 2, which could apparently solve our capacity problems for a fraction of the price of HS2. That plan contains such major flaws that even its supporters are having to modify it as they go along. I have already heard of Rail Plan 2a, for example, which is supposed to be more “sympathetic”. RP2 basically involves doing almost nothing, maintaining and improving our existing tracks in a hotch-potch manner, and improving capacity a little bit here and a little bit there. Of course it is cheaper—it has not achieved anything that we would not have done as a matter of routine upkeep. Of course, it is quicker as well. It will have to be quick, because rebuilding a line that is still in use as the main line route will cause massive disruption. I wonder whether the cost of that massive disruption has been taken into account in these very low cost estimates for RP2, let alone that the horrible experience of using a line which is half dug up may put a lot of people off rail travel for life.
If we want a top-class railway system, it is not enough just to fiddle around little by little. High-speed rail is the way forward. It has worked in other countries and is backed by all the key figures around the UK. Of course, we can and should improve our existing network as well. I have already said that I hope that the north Wales main line, referred to by the hon. Member for Aberconwy (Guto Bebb), will be electrified soon. However, such a piecemeal investment project will have no wider economic benefits and create no draw for inward investors, and it will create such chaos on the railways while being built that it could make the whole idea of inter-city travel less attractive altogether. If we never begin a long-term project, we will never finish it, either.
On the issue of crowding on the north Wales line, unlike my hon. Friend the Member for Alyn and Deeside (Mark Tami), I am a weekly user of the line. It is already at capacity. Everybody has to stand up on the Arriva trains between 4 pm and 5 pm. We need that investment and we need it soon.
I agree. My hon. Friend the Member for Alyn and Deeside wished to intervene.
As my hon. Friend the Member for Vale of Clwyd (Chris Ruane) mentioned, I am not a regular user of the train. There are connection problems. I used the train last week, only to find that I waited for a connection for nearly 40 minutes. That is an issue. It is all very well having high-speed rail, but if the connection time is so out, we will not get the benefit.
I agree with my hon. Friend on that point.
As I was saying, if we never begin a long-term project, we will never finish it, either. Even if HS2 takes many decades to build, the benefits it will bring will make it worth it many times over in the long-run. RP2 may work for a while but, ultimately, it will leave us continually plugging leaks, while the rest of the world races away with new technologies and coherently planned schemes.
In conclusion, we need more capacity, faster journey times, jobs, investment and better access. HS2 can give us all that, and it is heartening to see so much support among hon. Members this morning. I call on the Government to face down the saboteurs and stick to their promises. Only a small number of people oppose the scheme—regrettably, they include the Secretary of State for Wales and the Chilterns—but everyone else backs it, and so do I.