Committee Debate: 4th sitting: House of Commons
Thursday 23rd November 2017

(6 years, 12 months ago)

Public Bill Committees
Read Full debate Smart Meters Act 2018 View all Smart Meters Act 2018 Debates Read Hansard Text Read Debate Ministerial Extracts Amendment Paper: Public Bill Committee Amendments as at 23 November 2017 - (23 Nov 2017)
Alan Whitehead Portrait Dr Whitehead
- Hansard - - - Excerpts

My hon. Friend the Member for Birmingham, Selly Oak has tabled an amendment that is not only interesting but timely and important. As he says, it would be overwhelmingly helpful to the roll-out procedure and would not force anyone to do anything. It would give the Minister the opportunity to consider what should be done, perhaps by secondary legislation or something similar, to confront the issues raised by what we might call reverse meter logistics, which the industry is beginning to talk about.

The amendment is particularly helpful, because this problem is not a theoretical problem for the future, or something that we can think about during the extension period; it is happening now. Indeed, the problem is not only happening now, but its extent and complexity will inevitably increase hugely as the number of new meter installations ramps up, and it will increase even more if we have any further issues with replacing SMETS 1 and SMETS 2 meters as we go through the roll-out process.

There are several aspects of the problem. First, what about malfunctioning and existing smart meters that are no longer installed and are now redundant? Secondly, what about the huge number of existing meters that will be removed and need to be disposed of as smart meters are installed? It is a combination problem. However, it is joined together by the issue of the status of meters generally—not just smart meters—in the firmament of electricity and gas supply.

Indeed, my hon. Friend has pointed out the existence of the MAPs, and it has been a long-standing arrangement in the industry that the meters are not owned by the suppliers; the meters are merely read by the suppliers. The supplier will contract others, even, as happens currently, when a dumb meter is being replaced by another dumb meter. The normal thing is that the supplier will contract with a MAP to put a meter in. The MAP has a very secure asset, inasmuch as they put the meter in, get a charge for the operation of the meter and they carry out a contract for the supplier, but they always essentially own the meter in the last instance.

When we pursue a programme of removing old meters, whether they are dumb meters or previous generation smart meters, we have a problem that is precisely the reverse of the situation when the meters go in, namely that the meters being removed by suppliers—because they are the people putting the new meters in—do not actually belong to them. So as I understand it, we now have a situation where, in warehouses up and down the country, there is supposed to be a process of reverse meter logistics taking place. That consists, essentially, of triaging those old meters, deciding who the actual owner of a meter is, and then inviting the owner of that meter to come and collect it, in order to dispose of it. The suppliers themselves do not have the ability, in their own right, just to dispose of the meter, because it is not their meter to dispose of.

The consequence of that is, first, one is not entirely sure who the owner of the meter is in some circumstances, when a meter has been taken off a wall. Unless there has been careful archiving and, as it were, archaeological numbering of meters, to determine where they need to be taken, and unless there are absolutely first-class systems of triaging, inevitably the system of getting those old meters out becomes jumbled up.

We could have meter mountains across the UK. The meters are potentially valuable assets. They are worth having, with their rare earths, rare metals and all the rest of it; they can be recycled well. However, if there are warehouses full of meters whose provenance is not known and nobody is coming to claim them, and the meters cannot be processed, the only solution is to go and tip them into landfill. Then we will get a terrible outcome to what should be an entirely different process as far as meter re-provision is concerned.

My hon. Friend the Member for Birmingham, Selly Oak touched on the reason for that; it is because of the waste electrical and electronic equipment directive. In case hon. Members think that directive will no longer apply once we leave the EU, I remind them that it has already been implemented into UK law.

The WEEE directive introduces producer responsibility for disposing of electrical and electronic goods. In principle, that is a good thing: when someone needs to dispose of their fridge, freezer or hi-fi system, the company that produced it should have a hand in that. Quite sophisticated systems have evolved for sending electrical goods back to their producers for disposal. That is fine for goods labelled “Panasonic” or “Electrolux”, but I am sure hon. Members can see that it is much more difficult for redundant meters.

If we are not careful, this issue will overwhelm the roll-out or at least have a significant negative effect on the overall atmosphere of it. After all, before the directive was implemented we had fridge mountains in this country, as the Committee may recall.

Mark Pawsey Portrait Mark Pawsey (Rugby) (Con)
- Hansard - -

But not any more.

Alan Whitehead Portrait Dr Whitehead
- Hansard - - - Excerpts

That is because the WEEE directive operated properly, but before it was implemented there were a number of small alps of electrical goods around the country. It will reflect badly on the smart meter roll-out if we end up with Dolomites of old meters as a memorial to it.

We must sort this problem out. Amendment 6 gives the Minister a golden legislative opportunity to do so; we may not get another, so he should be anxious to grasp this one with both hands. I hope he will.