(2 days, 4 hours ago)
Commons ChamberMay I begin by apologising to the hon. Member for Thurrock (Jen Craft) for missing a bit of her speech? I nipped upstairs briefly to see the Children’s Parliament in action in Room 14. It is something our great friend Sir David was passionate about, so I hope the House will forgive my absence; no disrespect was intended. If it helps her, I have heard anecdotally that there is a lot of support for bringing back the Tilbury ferry—if I say that, perhaps she will forgive me.
There has been some debate about whether or not the Conservative party was committed to long-term infrastructure projects. Just for the record, in 1963, the first Dartford tunnel opened; I think Sir Alec Douglas-Home was Prime Minister at the time. In 1986, the first section of the M25 was opened by Margaret Thatcher. In 1991, the Queen Elizabeth II bridge opened, and in 1994, the channel tunnel opened, both during the premiership of John Major. We can trade historical dates, but I think those four examples show fairly conclusively that the Conservative party has been committed to major infrastructure down the decades.
On the lower Thames crossing, as I said in an earlier intervention, the truth is that this has a long and complex history. I know that it has been very controversial in Thurrock and in what is now South Basildon and East Thurrock. This really had a genesis, I think, under the Blair and then Brown Governments, so it goes back a very long way, and it is a fact that the project has been delayed by multiple consultation exercises over a period of years. But we are where we are, and because of the points raised by my hon. Friend the Member for Christchurch (Sir Christopher Chope) about the history of tolls on the QEII bridge, and whether or not they would ever be cancelled, I hope the Minister will understand that there is understandable scepticism—certainly in south Essex—about what would happen to tolls on the lower Thames crossing.
For the record, I have asked the Transport Secretary three times on the Floor of the House over the last year or so which financial institutions are now going to finance the 85% to 90% residual cost of the lower Thames crossing. I heard what the hon. Member for Crewe and Nantwich (Connor Naismith) said about the negotiations still being ongoing, but given the history of the whole project, I hope the Minister can understand in all seriousness why some people in south Essex are sceptical that the Government cannot yet tell us which companies or financial institutions would, in fact, pay for it.
When the Minister winds up, will he answer three very specific questions about the lower Thames crossing? First, given all of this complex history, what is the Government’s latest estimated year in which the crossing will open to traffic? Secondly, what is their latest estimate of the toll for a family car when the crossing opens? Thirdly, what is their latest estimate the toll for a 38-tonne lorry when the crossing opens? I would be grateful if the Minister could at least attempt to answer those three specific questions in his winding-up speech. I want the crossing to go ahead, but I want to know when, and I want to know what it is going to cost my constituents to drive through it, be they a private motorist or a lorry driver.
The Bill is about highways financing. I have dealt with the Minister before in a different context when he had a different job, and he has always struck me as a reasonable man—let’s get that on the record—but I wonder if he can understand the frustration in south Essex over the recent decision to cancel the proposed upgrades to the A127. Those upgrades included a scheme to straighten out what is now, in effect, the chicane at the old Fortune of War roundabout, and to add a third lane to the A127 in the Southend-bound direction between the Halfway House, as it is known, and the site of the old Fortune of War. Both those schemes would have increased flow and capacity on the A127. Some months ago, the incoming Labour Government cancelled the proposed widening of the A12, which had been in gestation for almost as long as the lower Thames crossing. I hope the Minister will understand why this has caused immense frustration in south Essex.
A different Department, the Ministry of Housing, Communities and Local Government, wants to build 100,000 houses from Grays to Shoeburyness. That is its departmental objective. The Department of Health and Social Care has a particular challenge at Basildon hospital, which is pretty much maxed out as it is. According to the NHS’s own planning metric, it works on a basis of 2.4 additional potential patients per dwelling. The plans say there will be 28,000 additional houses in the Basildon borough, and 35,000 in Thurrock, thanks to Reform and Labour; that is 63,000 in total. When we factor in the 2.4 multiplier, that is 151,200 additional patients—at least by my maths—for a hospital in Basildon that is completely maxed out today as it is.
I see the hon. Member for Thurrock nodding assent.
That hospital is rated “inadequate” by the Care Quality Commission. It is part of the Mid and South Essex foundation trust—along with Broomfield hospital in Chelmsford, and Southend hospital—which is a failing organisation. How can we build all those houses when there is no real plan of any kind to expand capacity at the hospital? Now we are cutting road programmes on the A127, which is one of the two fundamental east-west arterial roads between London and south Essex, and the A12 obviously feeds into to that area from the north.
The point that I am seeking to get across to the Minister is that none of this is joined up: one Government Department wants to build a vast number of houses; another Government Department is responsible for healthcare but has no idea whatsoever how to cater for what could be a quarter of a million extra people, if we use the NHS metric; and the Department for Transport is cancelling road upgrades that were supposed to increase capacity. At the morning and evening peaks, the A127 and the A13 are at 99% capacity as it is. I have seen the heat maps; the busier the road, the darker the red, and both those roads metaphorically glow scarlet in the morning and evening peaks. We have three different Government Departments with conflicting objectives, but my constituents in south Essex and other people who live there have to bear the consequences.
I have dealt with the Minister before on a constituency case, which I will not go into now, and he was very reasonable and listened. My plea to him this afternoon is: please accept what I am saying as true; please do not cancel anything else in Essex; and, for God’s sake—whatever you do—do not cancel the upgrade to the Fairglen interchange at Rayleigh on the A127, because if you think I am upset now, you want to see me then!
Those are the points that I wanted to make. Some are directly about the lower Thames crossing and some are about other issues, but I think my fundamental point about these key infrastructure projects is: it’s all got to be joined up. We cannot tolerate a situation where we have three Government Departments—I know the Minister is only responsible for one of them—pulling in three totally different directions. I hope that is not an unreasonable point to make in a debate of this kind. With that, I rest my case.