All 1 Debates between Maria Miller and Alan Whitehead

Carbon Capture and Storage

Debate between Maria Miller and Alan Whitehead
Wednesday 20th October 2021

(3 years, 1 month ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Alan Whitehead Portrait Dr Alan Whitehead (Southampton, Test) (Lab)
- Hansard - - - Excerpts

I congratulate the hon. Member for South Cambridgeshire (Anthony Browne) on securing this debate and the exemplary way he put forward the case for carbon capture and storage—a case that has many other articulate exponents on both sides of the Chamber as well as him. My hon. Friend the Member for Stockton North (Alex Cunningham) particularly comes to mind. He has championed the cluster, CCS and all that goes with it over many years, and he is, I think, substantially responsible for the moves forward in CCS.

We do not need to spend much time clarifying among ourselves that the case for CCS is overwhelming. We are, after all, moving to a net-zero target. In this context “net” is a very important word. To achieve the net-zero target, we have to concentrate on not only keeping minerals and energy and such in the ground, but putting stuff back into the ground, and we have to think of methods of doing that, because there will be a carbon overhang in 2040, 2050 or whenever. The methods of doing that include growing trees and direct air capture, which has been mentioned, though that has to go in the ground as well. Other methods are CCS and bioenergy with carbon capture and storage, which involves attaching CCS to an already relatively low-carbon method of producing power, thereby making it net carbon-negative.

CCS is important across all these fields and the industry as a whole. It is not just a question of the power sector. Most heavy and energy-intensive industries will need CCS if they are to have lower-carbon processes; they have processes besides power production that produce a lot of carbon. It is important across the board. I was indeed pleased to hear in the statement yesterday that the north-east cluster and HyNet had secured strong backing for going ahead with precisely that combination of activity—with providing CCS for industry, or with providing the proper transport for CCS and then sequestration. It is important to recognise that there are a number of different components to CCS.

As the hon. Member for South Cambridgeshire said, this is not an experimental technique that we need to do a lot more work on. We know how it works. We know what we have to do and where we have to put CO2. The North sea, for example, has capacity to take 78 billion tonnes of CO2—200 years’ worth of the country’s CO2 emissions. We know where it is going. As I have said, I have seen a full-chain CCS plant in operation at Boundary Dam in Saskatchewan, Canada. It captures the emissions it transports and sequesters them. What it does with the sequestered CO2 is a matter for another debate. The system works really well and is complete. We should be aiming to get whole systems working together in those industrial clusters in the north-east and the north-west, so that everything works well for the benefit of industry, hydrogen production and low-carbon heavy industrial activities.

It is perverse that the Acorn Project has been designated as first reserve—whatever that means—in this process. I do not understand how a first reserve is meant to come in if the first two clusters do not work very well, or change their minds and decide that they do not want to do it. It is clear to me that we need to go with three, and that the Acorn Project should be one of them.

I want to emphasise that we are no longer in the chamber of discussion on CCS. We are in the chamber of action, and we need to apply that to as many things as possible, as soon as possible, in this country. In that context, I want to ask the Minister very briefly—

Maria Miller Portrait Mrs Maria Miller (in the Chair)
- Hansard - -

Very briefly, please.

Alan Whitehead Portrait Dr Whitehead
- Hansard - - - Excerpts

Very briefly indeed, Mrs Miller. What is the status of the various support measures that will be introduced for CCS? I have perused carefully the various updates on the design of the CCS infrastructure fund and the business models, but it seems to me that there is no clear line on the exact support to be offered to the different CCS sectors that I have talked about. There may be a contract for difference, for example, for heavy industry. That will need to be led by a 10-year plan, with a levy control framework or similar, but that is not in place.

Maria Miller Portrait Mrs Maria Miller (in the Chair)
- Hansard - -

We need to move on to the Minister’s comments now.

Alan Whitehead Portrait Dr Whitehead
- Hansard - - - Excerpts

There is no CfD in place, either. How is that coming on, and will the Minister guarantee that the arrangements will be in place as soon as possible so that we can roll out CCS as quickly as possible?