East Anglia Rail Franchise Debate
Full Debate: Read Full DebateLucy Frazer
Main Page: Lucy Frazer (Conservative - South East Cambridgeshire)Department Debates - View all Lucy Frazer's debates with the Department for Transport
(9 years ago)
Commons ChamberI could not agree more. The beauty of delivering this tender well is that it can bring benefits across Norfolk, Suffolk, Cambridgeshire and Essex and benefit all our constituents, who, frankly, do not care whose constituency they are travelling through; they just care about getting where they want to go on time and in a way that is easy to access.
I congratulate my hon. Friend on securing this debate. Does she agree that, given the growth in our region and the fact that Cambridge is one of the few net contributors to the Treasury, it is essential we get the infrastructure we need? Ely is often a pinch point in infrastructure development, including the Ely North junction and the Soham-Ely doubling.
I could not agree more, because those pinch points affect such a broad area and affect the delivery of services into all our towns across the region. That is hugely important, and it was highlighted in the Hendy report.
I ask myself whether the obvious need for greater capacity would be addressed if we were not on the eve of this franchise re-tender. Our plan, with which the Minister is very familiar, is underpinned by a solid business case that will unlock the economic potential of up to £4.5 billion based on a package of improvements costing just over one tenth of that: £476 million. It will generate some £9.50 for every pound spent, providing a cost-benefit ratio that is acknowledged to be one of the most compelling investment propositions for rail. Over the next decade the plan will deliver over £15 billion in gross value added, 184,000 homes and some 50,000 new jobs, but if nobody can move around the area—and we already have to accept that the A14, which cuts right through my constituency and which travels down to the country’s largest container port at Felixstowe, is at times overwhelmed by the traffic—we really do have a problem.
Let me state quite clearly that we do not want to see “business as usual” being the operating criterion for the chosen bidder when those bids land tomorrow. We want change; we want transformational change at that, based on best practice from home and abroad. We want innovative thinking about some essential needs. I want those constituents of mine who are disabled, and particularly those who use a wheelchair, not to be faced with the situation where they cannot even access a train. If you live in Needham Market and you are in a wheelchair, that is it; you are not getting on that train. That is simply not good enough in 2015.
We know that whatever is to be delivered will be some way down the track—I have tried to avoid such comments, but I may hit the buffers at times. We do not want our new rolling stock to be somebody else’s refurbs. The taskforce report was very clear: we want new rolling stock. One reason much of our stock is to be upgraded is, quite simply, that it will be illegal shortly due to its inadequacies. We do not want pacers or old tube stock either. We have made do on this line for too long.
We have been told that with new rolling stock will come the reliability we seek. Everyone in the know says infrastructure is essential, too, including track signalling and overhead line equipment, as part of that bigger picture. But that rolling stock is essential, as the Minister knows very well from having used our service.
Essential east-west link improvements are needed, including the Felixstowe to Nuneaton and Birmingham freight route that will link the UK’s biggest container port with the rest of the UK and take pressure off the A14. My hon. Friend the Member for Suffolk Coastal (Dr Coffey) has campaigned tirelessly on this issue. As an aside, it seems incredible that one of the busiest ports in the UK is served by the single-track Felixstowe branch line.
To relieve pressure on commuters, I would recommend the introduction of an hourly Ipswich to Peterborough service—which I reiterate was not stated as a requirement in the invitation to tender—and I will add to my wish list the request that it should be increased to a half-hourly service at peak times. Improved passenger journey times, particularly in the east, are essential to optimise growth from east to west. In my constituency, we would like tomorrow to be an early start to Christmas. We have heard of Norwich in 90 and Ipswich in 60, and I am standing here today to ask you for Stowmarket in 70.
My hon. Friend is right. [Interruption.] Indeed, my right hon. Friend the Member for Witham (Priti Patel) says, “Off the A12 too”. My hon. Friend will be interested to know that one fully loaded freight train can take up to 72 HGVs off the road. That is astonishing. That is why we make money available through the modal shift grant and for the strategic freight network.
I really cannot pay tribute enough to my hon. Friend the Member for Norwich North (Chloe Smith). She has been a live wire of co-ordination and energy as the person to whom others must come and talk. I do not feel I am in a position to deliver rocket-powered trains just yet, but I would certainly like to try. Maybe there will be a train called Major Tim very soon, which would satisfy her.
My hon. Friend the Member for South Suffolk (James Cartlidge) raised the very worrying issue of leafgate. There is an important point here. I would be happy to confirm I will ask Mr Curley to meet representatives of his constituents and others. The question for me is this: what is the productivity loss to the British economy from accepting the fact that every year for a few weeks we are all late for work by 10, 15 or 20 minutes? I want to start looking at investments in our rail network through the prism of passengers and of productivity, because the two things are linked. We are making people late consistently, year after year after year, because of leaves on the line. Other places do not shut the lines, he will be pleased to hear, but they do slow down trains and run them slowly. People are cautious. I used to refute leaf stickiness as nonsense, but it is a problem. And it is not just us who face this: the Netherlands have a problem and Germany has a problem. Let us have a pan-European get-rid-of-leaves-on-the-line prize. The productivity improvement it could deliver for the British economy would be huge. I am determined that the productivity improvements rail can deliver are factored into the investment decision.
It is concerning that the cost of improvements to the Ely North junction have gone up. If the improvements come in early in control period 6 —we very much hope they will—it might still be possible to have them finished in the franchise period, which we all want, so we ask her not to rule that out.
I rule nothing out on that point. I am very keen that what is funded and delivered will be delivered by Network Rail in this period.
I pay tribute to my hon. Friend the Member for Colchester (Will Quince), who has already, in the first few months of this Parliament, been such an incredible campaigner for his constituency. He raises the very important point that we are not in the business of peddling jam tomorrow. That is why we have to deliver what is in the Hendy review, and that is why we have to make this franchise absolutely deliver for all passengers.
I want to make a couple of final points. First, we are in an unprecedented place for rail. We are investing more in our rail network than at any time since Victorian times. We will spend £38 billion on our railways over this period, and I am bound and determined that that money is spent for passengers who can see and feel the benefit. I urge this group, who are working so well together, to bring their collective intelligence and the network effect that one of my hon. Friends talked about to help us make the business case for these improvements. The benefits are much, much broader than the narrow rail prism that we often use.
Question put and agreed to.