Severn Barrage Debate

Full Debate: Read Full Debate

Lord Touhig

Main Page: Lord Touhig (Labour - Life peer)
Monday 22nd April 2013

(11 years, 8 months ago)

Grand Committee
Read Full debate Read Hansard Text
Lord Touhig Portrait Lord Touhig
- Hansard - -

Like many noble Lords I have had an interest in a Severn barrage for many years. Indeed, when I was a member of Gwent County Council we strongly welcomed the previous scheme for it and some years later when I visited the Rance barrage I was greatly impressed by the power and the way that the whole operation worked.

Britain now finds itself with an energy crisis as a result of a lack of forward planning. Some 25% of our generating capacity will close in the next few years. We are facing potential blackouts by the mid-2020s unless we invest in large-scale energy projects. I believe that a Severn barrage is a sound form of forward planning because it will provide generations of Britons with cheap electricity.

The construction of a barrage will be a massive boost to our economy and provide thousands of jobs during construction and afterwards. Previous schemes have foundered on two issues—the need for large amounts of public money and the significant environmental impact. But if the developer, Hafren Power, is to be believed, its proposal will not require any money from the Government at all. It is up to Hafren Power to demonstrate and prove that. I hold no brief for the developer, but it claims that it has learnt from earlier studies and proposes a new type of barrage, which will put environmental considerations first. The ambition is to build an 11-mile line of more than 1,000 slowly spinning turbines, housed in massive concrete blocks, between Brean in England and Lavernock Point in Wales. It is certainly worthy of our consideration. Such a barrage will generate electricity as the tides go in and out, so the natural tidal flows can be maintained. The turbines will be spread right across the estuary, so the currents and navigation will not be affected. Looking at other options, I believe that the barrage is superior to wind farms, if only in reliability and predictability. I have first-hand experience of wind farms; when I was Welsh Minister, I travelled to Scotland to visit a new wind farm. The only trouble was that, when I got there, there was no wind.

A barrage, unlike wind farms, brings with it a substantial legacy of flood protection, cheap electricity and economic renewal. A Severn barrage will help defend against tidal flooding and storm surges caused by sea-level rises, and will help to reduce flooding upstream, saving billions of pounds in damages. It has already been mentioned that construction could take more than nine years, and 20,000 jobs could be provided. Those things should not be easily dismissed. Opponents of the barrage, including the Port of Bristol and some environmental lobby interests, have raised proper concerns. These concerns have to be taken seriously, listened to and taken into account so far as that is possible. But they should not be allowed to become a barrier to progress in developing a Severn barrage.

Over the past decades, we have seen report upon report written on the subject of a Severn barrage. These reports have been considered, debated, amended and then forgotten. Indeed, if the trees cut down to provide paper for these reports had instead been floated across the Severn, they would probably have covered the 11 miles from south Wales to the west of England. It is time to resolve the issue of a Severn barrage, and to be brave and bold and commit ourselves to this great enterprise. Frankly, I do not mind who builds and operates the Severn barrage, but I would like to see it built, and built in my lifetime.