Cableway Installations (Amendment) (EU Exit) Regulations 2019 Debate
Full Debate: Read Full DebateLord Teverson
Main Page: Lord Teverson (Liberal Democrat - Life peer)Department Debates - View all Lord Teverson's debates with the Department for Transport
(5 years, 2 months ago)
Lords ChamberMy Lords, this instrument is being made under powers conferred by the European Union (Withdrawal) Act 2018 and will give clarity and certainty to industry by fixing deficiencies in two pieces of legislation that will arise when the UK leaves the EU. The first is EU Regulation 2016/424—the “EU regulation”—which is a directly applicable EU regulation. The second is the Cableway Installations Regulations 2018, or SI 2018/816—the “2018 regulations”—which implemented the EU regulation.
Cableways are a mixture of funicular railways and aerial transport systems, such as ski lifts, for the transport of passengers. They are important for tourism and local communities. The majority, around 70, are in snow sports resorts in Scotland. They include chair lifts, surface tow systems, rope tows and passenger transport systems such as the Emirates line in London.
These regulations will not apply to all cableways. Those that entered into service before 1 January 1986 and are classed as historic, cultural or heritage installations, such as the Great Orme Tramway in Wales and the Babbacombe Cliff Railway, are excluded from the scope of the 2018 regulations and the EU regulation.
The 2018 regulations amend the EU regulation designed to harmonise national laws regarding the design and manufacture of cableways equipment to be used in installations designed to carry passengers. The EU regulation is in part directly applicable in the UK, so it forms part of domestic law, and the 2018 regulations supplement the EU regulation where further detail is required. The EU regulation and the 2018 regulations ensure conformity of standards of cableway components across the EU, require the Secretary of State to notify the EU Commission of the notified body responsible for carrying out conformity assessments to ensure that cableway systems, subsystems and their components meet EU harmonised standards, and require the Secretary of State to set rules on the design, construction and entry into service of new cableway installations.
The 2018 regulations and the EU regulation contain a number of elements that will be inappropriate after the UK leaves the European Union. The EU withdrawal Act will retain the EU regulation in its entirety in UK law on exit day. The instrument before your Lordships makes changes that are necessary for the legislation to continue to function correctly after exit day. The majority of the corrections are to amend European Union references and terminology to domestic references, alongside removing requirements to notify matters to the EU Commission.
The most significant change in this instrument is the new power for the Secretary of State to designate standards after exit day. There are no immediate plans or need to exercise this power, but it is sensible to make provision for the future. Until this power is exercised, products that conform to the current EU harmonised standards will continue to be considered compliant with the EU regulation as amended by this instrument. Any introduction of national standards would be subject to full consultation with industry and appropriate technical and safety bodies.
The other significant change is that the definition of “approved body” replaces the definition of “notified body”. The effect is that the Secretary of State can approve bodies to carry out a conformity assessment. This is the process demonstrating whether the essential requirements of the regulation relating to cableway components have been fulfilled. There are no such approved bodies in the UK at present so this will have no immediate practical significance to industry and, as with standards, EU notified bodies will continue to be recognised until such time as there are designated standards and a UK body is approved. The other changes are mostly minor and technical in nature.
In the event that we leave the EU without a deal on 31 October, these regulations are necessary to maintain the status quo after exit day and will ensure the continuity of operations and safety for operators and passengers. The Government’s objective is to avoid uncertainty for cableway operators following exit day, which I hope noble Lords agree is a sensible approach. I beg to move.
My Lords, I was tempted to ask whether this included zipwires, to make sure that people going down them got to the bottom. More importantly, I know from my own family that there are more high-wire facilities in parks and adventure parks. Children go on them above the trees; they are great for exploration and daring. Does this include that type of facility? I should probably have listened to the Minister even more carefully. Who inspects these facilities now? Is it local authorities? How is it done? How are we sure that the regulations, whatever they are, are not just enforced but checked? I suspect that these facilities will increase in number over the years.
I am quite concerned that because pre-1896 cableways are termed cultural, we therefore do not particularly worry about health and safety around them. Perhaps the Minister would like to explain that as well.
My Lords, I thank the Minister for explaining the purposes and objectives of these regulations dealing with the components necessary for the installation of cableways. They seek to establish parallel processes to those in the EU in the event of a no-deal Brexit. Ensuring the safety of cableways is obviously critically important, and we support the instrument’s purpose.
The instrument allows for the Health and Safety Executive and the Health and Safety Executive Northern Ireland to take over the role of enforcement body. As I understand it, the UK Accreditation Service will then ensure that an assessment is made by an approved body so that the components for installation meet the required standard. As the Minister said, the setting of standards in the event of no deal will now sit with the Secretary of State as a new extended power.