Tuesday 26th February 2013

(11 years, 9 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Stevenson of Balmacara Portrait Lord Stevenson of Balmacara
- Hansard - -

I thank the noble Lord, Lord Truscott, for securing this debate. I declare an interest, as my home is in Little Missenden, which is close to the current preferred route for phase 1. Of course, being a nimby may encourage some others to devalue my comments, but without that close connection, I would probably not have studied the Government’s proposals in the way I have.

I want to make two points. I support investment in our national rail network and I am in favour of introducing a high-speed network for the UK, although I would start in a different place, both literally and metaphorically. I would start in the places that actually need high-speed connectivity, such as the south-west, Wales, the north-west of Scotland, and Scotland more generally—a contribution, perhaps, to a united kingdom.

I would insist on interconnectivity with other transport systems. Why on earth does HS2 no longer stop at Heathrow? Why does it not connect properly with HS1, through Stratford and thence to the continent? I would follow existing major transport corridors, such as the M40 from Heathrow to Birmingham, or the M1 through Milton Keynes. I would pay proper regard to areas of ancient woodland and precious areas of natural beauty, even if it means that journey times are slightly extended. I would consult properly on all the possible alternatives so that the best choice is made and I would certainly have a much better compensation scheme.

My second point is about the route through the Chilterns. The presentation of HS2 Ltd of the case for the “Y” route north of Birmingham trumpeted that it,

“avoids national parks, Areas of Outstanding Natural Beauty and registered parks and gardens”.

I welcome this, but it throws into stark relief the fact that the Chilterns is now the only AONB along the entire HS2 route that is adversely affected by the proposed scheme. My local campaign groups, Conserve the Chilterns and Countryside and the Chiltern Ridges HS2 Action Group have suggested a tunnel through the entire Chiltern AONB, which I support. However, HS2 Ltd clearly wants nothing to do with it. It claims it will increase costs by some 10 times the amount that we calculated it would cost but, of course, it will not publish its calculations to prove that.

A continuous full tunnel through the Chiltern AONB would not be necessary if HS2 was routed from Heathrow, up the M40, or through the M1 travel corridor to Milton Keynes. If the Government are intransigent on this, however, the continuous full tunnel would enhance the current phase 1 route because it better protects existing natural assets, meets local concerns, reduces the total phase 1 construction time and saves landscape-related costs of more than £65 million.

The Government should re-consult on the HS2 phase 1 route to allow proper and effective consideration of all alternative options, including those relating to the Chiltern AONB. They should ensure that the Chilterns tunnel proposals are included in the forthcoming environmental impact assessment, or else adopt the Labour Party’s proposals for hubs at Heathrow and Stratford.