Lords ChamberThis integrated rail plan is in reality about backtracking on government promises to build the eastern leg of HS2 and Northern Powerhouse Rail. The Government know that HS2 and full delivery of Northern Powerhouse Rail would have given a major boost to the economies of our northern cities, because that is what the construction and pending completion of HS2 have already done and will continue to do for the economy of the West Midlands and Birmingham in particular. Leeds and the local West Yorkshire economy will now be denied the full £54 billion of estimated economic benefits of their HS2 link, with Leeds becoming a less attractive venue than it would have been for new and expanding businesses. Northern Powerhouse Rail delivered in full, with a new high-speed line through Bradford, was also set to deliver an estimated £22 billion for northern economies. The integrated rail plan does not address the impact of backtracking on the eastern leg of HS2 and Northern Powerhouse Rail on the economies of our northern cities and towns, and there was no government answer when I asked about it last Thursday.
Typically, this Government are now seeking to silence opposition to their watered-down plan, since Transport for the North, which is overseen by all the northern mayors and council leaders, has just been told that it will no longer be financed by central government to develop Northern Powerhouse Rail and that in future this work will be funded directly, and thus controlled directly, via Network Rail by the Department of Transport, a reflection of the Government’s centralising tendency and lack of enthusiasm for real devolution of power and decision-making.
The Government’s integrated rail plan, which incidentally says very little about rail freight at all, places great weight on the virtues of upgrades of existing lines and the time in which they can be completed and the costs incurred. In doing so, though, the rail plan and the Secretary of State fail to reflect the very different experience of recent major upgrades. The west coast main line was upgraded at a cost of £9 billion, nearly four times the original cost estimate of £2.5 billion. Despite costs ballooning nearly 400%, the upgrade still had to be reduced in scope from 140 mph top speed to 125 mph with moving block signalling, in-cab signalling, being abandoned; otherwise, the cost would have been up by nearly 600%. The project led to substantial upheaval to existing services over a period of years and was not completed until 2009, very late and 10 years after it started.
Work on the Great Western electrification commenced in June 2010 and was due to be completed in 2016-17, but was not completed until 2019-20. The project ran into major difficulties, causing repeated extensions to deadlines and costs to increase by more than 300%, to around £2.8 billion in 2018 from £874 million in 2013. Despite this dramatic increase in costs, the project still had to be scaled back to keep cost increases merely in excess of three times the original figure. Electrification from Didcot Parkway to Oxford, Cardiff to Swansea, Chippenham to Bath and Bristol Parkway to Bristol Temple Meads, as well as branches to Henley and Windsor, were also deferred indefinitely by the Government in November 2016, with the Cardiff to Swansea electrification being cancelled outright in July 2017.
The message is clear: upgrading routes is not as straightforward as the Government suggest. The hard evidence shows that costs will be very much higher than projected and the time taken to do the work a great deal longer than projected. Statements plucked out of the air about being able to deliver a watered-down version of what was promised a decade earlier than projected fly in the face of the facts and experience. Such statements also fly in the face of the Government’s own document, which indicates that the new lines on part of the watered-down Liverpool to Leeds route will not come into service until the 2040s—the same timescale within which the Prime Minister, in his foreword to the plan, says that high-speed lines under the original plan will have reached the east Midlands and Yorkshire.
Further, on costs, there is no breakdown of costings for each separate project within the plan, or a breakdown of any large figures within each separate project. There is also a further issue: the watered-down schemes outlined in the rail plan are dependent for delivery, on both projected capacity and speeds, on digital signalling. But I believe, perhaps mistakenly, that there is not yet a substantial tried and tested digital signalling scheme as envisaged by Secretary of State already in full operation. Indeed, people have so far been working on trying to develop such a scheme for more than 20 years. If there is a delay in the projected timescale for bringing such an as yet untried signalling development to fruition, even the watered-down schemes as projected in the rail plan will be severely compromised in respect of capacity, speed and timescale.
In the past decade, the north of England received £349 per person in transport spending, while London got £864. If the north had received the same level of spending as London, it would already have had £86 billion more since 2010. Yet this rail plan, worth £96 billion, some of which is in the south at the southern end of HS2, will take well into the 2040s at best to complete, considerably over two decades away. This plan, with its backtracking on previous pledges and reductions in previously stated future levels of expenditure, continues, not addresses, regional investment inequalities. So much for the Government’s levelling up and delivering HS2 in full, including the eastern leg, and Northern Powerhouse Rail.
My Lords, I recall a particularly funny episode of “Yes Minister” in which the Prime Minister asked Jim Hacker to produce an integrated transport plan. It was called “The Bed of Nails”, and I was reminded of that episode over the weekend as I watched the Secretary of State valiantly trying and failing to sell this plan as a success for the north of England. It takes a lot of ingenuity to produce a plan that almost doubles the time it will take to get, for example, from Birmingham to York, and still call it an improvement on previous plans.
Despite the Secretary of State’s sleight of hand, the plan has not been well received. The Government have managed to unite the elected mayors of the north, the chambers of commerce in Yorkshire, Greater Manchester, Birmingham, east Lancashire, Doncaster, the east Midlands and even London, the Chartered Institute of Logistics and Transport, Conservative MPs for northern constituencies and the Conservative chair of the Transport Committee in opposing and criticising the Government’s plan.
Not surprisingly, one of the critics was Transport for the North, and for that it has been stripped of its powers, which seems a very strange approach to levelling up. I join the noble Lord, Lord Rosser, in asking the Minister to explain why control of the Northern Powerhouse Rail project will now lie solely with central government—what is it that makes Ministers so sure that they know better than the people of the north about what they need in relation to railways?
The most high-profile decision was, of course, to truncate HS2 by abandoning the eastern leg. Those cities that had expected to be directly linked to a new 21st-century rail line have developed investment plans predicated on that and expected an economic boost along those lines. They now have to start again following a massive no-confidence vote by the Government. As the noble Lord said, transport spend per head is scarcely more than one-third of the size that it is in London. In her answer to me last Thursday, the Minister admitted that abandoning HS2 and reducing the Northern Powerhouse Rail plans
“saves the taxpayer billions of pounds.”—[Official Report, 18/11/21; col. 407.]
I suggest to the Minister that this approach is totally unacceptable. What do the Government plan to do to redress the balance now that their levelling-up promises to the north of England lie in tatters?
HS2 was always as much about capacity as speed. The Government are going instead for a patchwork of schemes, with short stretches of electrification. Digital signalling, which has long been promised, and longer platforms for longer trains will create some extra capacity but it does not compare with what a whole new railway would do. The Government promised to electrify 13,000 kilometres of railway by 2050 and so far have done 2.2% of that. So we are 235 years behind schedule. I ask the Minister: after all the stretches referred to in the plan have been completed, what percentage will we be on?
Finally, one of the reasons for building a new line is that the upgrading of existing lines is enormously disruptive. As a veteran of 10 years of Great Western’s electrification, I can attest to that. What calculations have the Government made of the cost of disruption for the lines they propose to upgrade?
(3 years ago)
Lords ChamberBradford—ah, when the noble Baroness has been able to read the documents that are about to be published, she will see in there that we will be electrifying the route from Bradford to Leeds. The journey time will be hugely more reliable—it will take 12 minutes.
The economy of the West Midlands, and Birmingham in particular, has been boosted by the construction and pending completion of the fast new rail service that is HS2. Despite what the Minister has been seeking to say, it appears that Leeds and the local West Yorkshire economy will now be denied the estimated full £54 billion of economic benefits of their HS2 link. Leeds, for example, will be a less attractive venue than it would have been for new and expanding businesses without its promised high-speed rail links. Northern Powerhouse Rail delivered in full was also set to deliver £22 billion for northern economies, including Bradford, by 2060, according to a report by Mott MacDonald. What is the Government’s estimate of the loss of projected economic benefits to Leeds and the West Yorkshire economy of the decision to backtrack on previous promises on the HS2 high-speed rail link to Leeds and on full delivery of Northern Powerhouse Rail? What is the loss of those economic benefits that were projected?
As the noble Lord will see when he gets to read the documents that are being published today, a huge number of projects are being brought together, and so many of those are around Leeds. It is the case that the core part of Northern Powerhouse Rail will be constructed, and that will provide those fast links through to Manchester. It is the case that there will be significant upgrades to the east coast main line and, of course, there will be electrification of the Midlands main line. Combining that with the construction of a mass transit system, I think, somehow, that Leeds is going to be all right.
(3 years ago)
Grand CommitteeMy Lords, most of my comments will be directed towards the (Amendment) (No.2) regulations and to the report of the Secondary Legislation Scrutiny Committee, which homed in particular on that order.
Under these regulations, the obligation is removed for some car drivers towing a trailer to have to take the additional test. As the Minister said, that is to free up capacity and enable more test appointments to be fitted in each month for heavy goods vehicle licences in a bid to address the current shortage of HGV drivers. No doubt the Minister in her response may wish to comment on the extent to which that shortage has been eased or the extent to which it continues.
The regulations also remove the requirement in relation to the staged access route to licence acquisition for heavy goods vehicle and bus licences, which will also free up driving examiner time and shorten the amount of time that it takes for a driver to become qualified to drive the largest heavy goods vehicles.
I understand that the category B towing test will not be abolished, because it is still needed by anyone wishing to drive a trailer in the EU. The regulations simply remove the obligation to take the test before towing in the UK, and will be reviewed after three years and then every five years after that, which frankly suggests that the Department for Transport see these changes to all intents and purposes as being permanent, rather than being a short-term measure to address the current heavy goods vehicle driver shortage—unless, of course, the Department for Transport envisages that shortage going on for years and years.
The Secondary Legislation Scrutiny Committee has drawn the attention of the House to the regulations, not least in respect of the potential safety implications. There are, apparently, about 1,000 collision injury accidents or incidents involving trailers each year. It is not clear whether the Government do or do not expect that figure to be affected by the removal of the towing test. Frankly, at the moment, I do not think the Government even have a view, since the Department for Transport has indicated that a risk assessment on road safety will form part of the impact assessment, which is fine, apart from the fact that the impact assessment will not be cleared for publication until the end of this month at the earliest. I note what the Minister said at the beginning, and that the regulations were intended to come into effect this coming Monday.
The Secondary Legislation Scrutiny Committee said:
“We view this as poor practice.”
It is right. Once again, the Department for Transport has been slow to react, caught out by a driver shortage that it did not address in time, despite it being in large measure of the Government’s own making, thanks to their own particular brand of hard Brexit. The committee commented:
“It is part of the purpose of an IA”—
an impact assessment—
“to provide information on what options, including non-legislative options, were considered and why they were not adopted. Because the IA has not been made available to the House alongside the instrument, we are unclear about why possible alternatives were rejected … From the date this instrument comes into effect, any car driver will be able to tow a trailer but DfT has provided no estimate of the additional numbers that that might attract or the likelihood of incidents that might follow.”
However, the department asserts:
“There is not currently any statistical evidence to suggest that competence and skills will worsen if drivers do not take a statutory test to tow a trailer … it is therefore difficult to identify how much the car trailer test … has made a difference since it was introduced in 1997 or that there is a causal link between road safety and the test.”
I do not know for how many years that has been the Department for Transport’s view—perhaps the Minister could respond to that point in the Government’s reply—but if the Government do not know whether there are any safety benefits to the statutory test to tow a trailer, and have not taken any steps over the past 11 years to find out, that does not appear to say much for their much-vaunted campaign to reduce bureaucracy and unnecessary red tape.
Safety was, however, a concern of a significant percentage of those responding to the consultation on the amendment to the regulations: a third of the 8,750-odd respondents expressed safety concerns. As I understand it—I am sure that I will be corrected if I am wrong—the DVSA advises that anyone intending to drive a car with a trailer for the first time should still first take training from a driving instructor. What steps are being taken to publicise this advice?
Moving on, is it not the reality that the Government hope that people affected by these regulations will, either individually or through their firms, still undertake the aspects of the required training that these regulations will remove? This was indicated frankly in the Minister’s response to the chair of the Secondary Legislation Scrutiny Committee, in which there was a reference to the Driver and Vehicle Standards Agency
“exploring industry-led accredited training that could offer a standardised non-statutory testing approach. The DVSA has received strong support for an accreditation training scheme which is also generating considerable interest from companies who tow as part of their business and we are progressing discussions urgently.”
That letter also stated:
“We know through DVSA’s stakeholder engagement, that there is a strong indication from professional business users that they will continue to undergo Category B+E training to ensure staff are safe and competent and that their corporate responsibilities are fulfilled.”
This certainly indicates that, as far as professional businesses are concerned, they regard the B+E training as necessary to ensure that staff are safe and competent. The Secondary Legislation Scrutiny Committee concluded:
“The Department failed to provide any indication of the instrument’s wider effects when the instrument was laid and, in response to our follow-up questions, DfT was unable to explain what effect the removal of the BE licence will have on road safety.”
I conclude by simply asking whether the Government will in their response comment on the recommendations of the Secondary Legislation Scrutiny Committee in its report on the Motor Vehicles (Driving Licences) (Amendment) (No. 2) Regulations 2021. The first was,
“We recommend that the DfT should review the current complex arrangements for what car and van drivers are permitted to tow and, if needed, replace them with a simpler licensing system. That decision should be based on evidence rather than the current experimental approach”.
Secondly, it said that the department should
“provide an annual Written Statement setting out towing accident figures as a reassurance that it will be in a position to undertake remedial action swiftly if a problem emerges”
and, thirdly, that the Minister should provide “more specific details about” the “wider safety implications” of the instrument, since the House
“has insufficient information to enable proper assessment of the policy”.
I thank all noble Lords for their contributions today and for enabling this debate to go ahead in the circumstances. I am very grateful, and I have appreciated the input of all noble Lords. I have listened to their concerns and suggestions very carefully, and I will write, as there is a bit of extra detail that I will give.
Returning to the overall driver shortage, the Government have been aware of it since 2010, but the issue is that it so is multifaceted that it is very difficult to pin down. We estimate the size of the acute shortage to be around 39,000, but there are numbers out there of 70,000 and 100,000, so what is not being delivered if those drivers are not available? I have asked the sector many times. The reality is that the lack of those drivers is about sector resilience and ensuring that people who are in the sector are not feeling that their shifts are too long, or whatever. We believe that the acute shortage is around 39,000. I am not going play EU bingo with the various shortages in the other countries. Suffice it to say that there are shortages in other countries, and they are something we are all dealing with.
To briefly pick up on the point made by the noble Baroness, Lady Randerson, about visas, I will check that, because we do not do late parliamentary questions. I think it is because it might have gone to Defra, and that will be the reason—not that it does late parliamentary questions, but there is the transfer, if you know what I mean.
There is an international shortage. We sort of know the size of the shortage, but I would love firmer data on it. It is incredibly difficult to assess a precise number in this fast-moving environment. It has got better. One of the things that I have been following very closely is the number of people asking for application forms from the DVLA to apply for an HGV provisional licence, which has gone up massively, as has the number of licences and provisional licences going out of the other end. Now we have to get those people into the training system and then into the testing system. Having sorted out DVLA and testing, I am now turning my attention to the bit in the middle, which is obviously a private sector affair, but we will be working with it so that it increases its capacity as much as possible.
I am so sorry to hear about my noble friend’s issue with his driving licence. I have some good news: my daughter passed her driving test a couple of days ago, and she received her licence like that. I am happy to take up any concerns noble Lords have about their treatment by the DVLA, but I am pleased to say that on HGV licences it is back to normal processing times. That also applies to buses.
On the road safety aspect of this, it is incredibly complicated and we are working at pace. I appreciate that we do not have an impact assessment that noble Lords can point to, so I will do what I can to assuage noble Lords’ concerns.
Again, there is a significant challenge with data here. People will often come up with anecdotes about how they saw a trailer doing X, Y, Z—I have seen cars and buses doing all sorts of dreadful things—but actual data is one of our big challenges. As the noble Lord, Lord Rosser, pointed out, in STATS19, 865 incidents involved a car or vehicle with a trailer, which is 0.45% of the total incidents in the entire year. That is a very small amount, but it does not matter; it still has to be considered.
(3 years ago)
Lords ChamberMy Lords, we are currently in the fairly early stages of the very complex discussions around the consultation. The noble Lord is quite right: when you ask the British public a question and for their feedback, they rightly give it. We have had over 10,000 responses to the consultation. While the feedback was balanced, views were polarised, and I am afraid that it is impossible to keep absolutely everybody happy. The discussions continue—as I said, they are on a weekly basis—and proposals will be coming to Ministers in due course.
There appears to be a conflict here between increasing services from Scotland and the north-east to London and the potentially adverse impact this would have on trans-Pennine services from Newcastle to Manchester and Liverpool due to track capacity constraints in the north-east. Why have the Government failed to address these issues—which do not spring up overnight—over the last 11 years, particularly bearing in mind that they now also impact on Northern Powerhouse Rail, about which the Government to date have said so much and done so little?
The Government have invested £4 billion in the east coast main line and are planning to invest a further £1.2 billion in issues such as capacity at Stevenage, the King’s Cross track remodelling and the Werrington grade separation works. These upgrades will deliver better journey times, reliability and capacity improvements.
(3 years ago)
Lords ChamberIt certainly has nothing at all to do with COP 26. Obviously, certain matters are operational matters for the police, but the noble Baroness is right: we all know of good protests. Getting a million people out on the streets on a Saturday afternoon where the police have been told in advance, where there is a good level of public support and where you do not destroy any statues is a good protest. Insulate Britain members are not good protesters.
Climate change is the major challenge of our time, and winning public support for the cause is critical. Blocking roads and antagonising people is not going to achieve that objective.
This week, the London Mayor, Sadiq Khan, has significantly extended London’s ultra-low emission zone. The Evening Standard yesterday said that it backed Sadiq Khan in
“taking steps to clean up our city’s toxic air and cut our carbon emissions in the process.”
Do the Government also back Sadiq Khan on this, regarding it too as an effective example of how the ballot box can prove to be an effective way for people to respond to the climate crisis?
As the noble Lord will know, we probably have a much closer relationship with the Mayor of London than we would ordinarily have at the moment. Although transport is devolved in London, owing to a substantial hole in TfL’s finances we have to provide it with quite significant funding every now and again. Indeed, the last deal we agreed with the mayor included that there would be no change to the extension of ULEZ.
(3 years ago)
Lords ChamberI am not sure we will necessarily follow the French example, but I accept that we need to improve the quality and quantity of facilities for our drivers and the availability of lorry parking for rest breaks. Obviously, I am working very closely with the owners and operators of the 114 motorway service areas we have. Of course, there are countless other providers of facilities that are away from the strategic road network. I agree that we need to improve them and perhaps there might be something more about that in the spending review.
No one should object to heavy goods vehicle drivers being paid a lot more for the valuable work they do, but now we read that some local authorities are facing shortages of drivers of refuse collection vehicles and gritters because they are leaving for newly substantially higher-paid driving jobs for supermarket chains, among others. Since this is a direct spin-off from the Government’s own hard Brexit, will the Government commit to reimbursing cash-strapped local authorities for the cost of paying drivers of refuse collection vehicles and gritters more to retain their services and ensure the maintenance of these vital public services this winter?
As the noble Lord knows, there is a shortage of lorry drivers across Europe so we would not necessarily have been able to rely on cheap EU labour in the current situation. I accept there will be a transition from where we were previously to where we are now. Some people will move jobs and I accept that the key to that is to increase training for HGV drivers. We are providing the tests and working with the training sector to provide training so that people can come through and drive our garbage disposal trucks and gritters.
(3 years, 1 month ago)
Grand CommitteeI too thank the Minister for her explanation of the content and purpose of this instrument, which comes into force at the end of this month. As has been said, in essence, the effect of this statutory instrument is further to suspend the usual rules that UK airport slots must be used for 80% of the time to minimum to avoid the airline concerned losing the slots for the following season. The suspension is due to the Covid-related reduction in air traffic.
The 80:20 rule was waived by EU legislation for the summer 2020 slot-scheduling season and for the winter 2020-21 season, and the Government put in place a similar waiver for the summer 2021 season, which runs until 30 October. In the light of current UK flight traffic levels, the Government now consider it necessary to provide continuing relief and amend the 80:20 rule to cover the winter 2021 season, which, as the Minister said, runs from 31 October this year to 26 March next year.
These regulations make three changes in relation to slots allocated for the winter 2021 season, as set out by the Minister in introducing this statutory instrument, including reducing the required percentage rate from 80% to 50%. The regulations also enable an air carrier to retain rights to a series of slots for the winter 2022 season, if it returns the complete slot series on or before 7 September 2021. Could the Government say how many and which air carriers—if the date was 7 September 2021—have exercised their rights under that part of the regulations?
Earlier this month, it was reported that while easyJet operated at 58% of its 2019 capacity during the summer months, that was expected to increase to 70% over the winter months. Do the Government regard 70% capacity over the winter months as a likely figure for industry-wide levels, and, if not, what capacity figure do the Government expect over the coming winter months? How confident are the Government that this will be the final suspension of the 80:20 rule due to the Covid-19-related reduction in air traffic? I take it that the answer is “not very confident” from a comment that the Minister made, I think, in relation to the summer of next year. If the Government are not confident, is consideration being given to lowering the 80% level at some stage, on a more permanent basis?
The Government’s Explanatory Memorandum states:
“The Department for Transport received 54 responses to the consultation from air carriers, airports, and trade and representative bodies.”
Since it is not clear from the EM, how many of those responses supported all three of the changes made by these regulations, as set out by the Minister, in relation to slots allocated for the winter 2021 scheduling period? Since it is not clear from the EM how many of those responses supported all three, could the Government now provide that figure? I await the Government’s response.
(3 years, 1 month ago)
Grand CommitteeAgain, I too thank the Minister for her explanation of the purpose and content of the orders we are discussing.
The Department for Transport has said that Operation Brock was originally created to deal with disruption caused by our exit from the European Union and then in response to the Covid-19 pandemic. As I understand it, Operation Brock creates, among other measures, a contraflow road layout on the M20 and the setting up of concrete barriers so that lorries heading for mainland Europe can queue on the coast-bound carriageway if there are disruptions or delays at Dover or the Channel Tunnel. Any decision to put out or remove the concrete barriers involves the Government.
The Government now want to remove the sunset clauses from Operation Brock on the basis of the argument that this will mean the Kent Resilience Forum will be better prepared to respond to any type of traffic disruption in the area not related to our EU exit, including industrial action and severe weather. I do not know whether the industrial action reference is to possible action by heavy goods vehicle drivers, who have sought unsuccessfully to get a better deal following the Prime Minister’s assurance that they should be paid more.
This Government claim to be averse to ratcheting up regulation, yet here we have a regulation that was brought in on a temporary basis to address the chaos of the Prime Minister’s Brexit deal and his inadequate response to the Covid-19 pandemic—as set out in the recent joint report from two Commons Select Committees, both chaired by two of his own MPs—now being made permanent, despite the fact that the Government have removed most Covid restrictions and tell us that the PM’s Brexit deal has only upsides and no significant downsides. Can the Government explain why, if disruption at Dover and the Channel Tunnel from industrial action and severe weather is such a threat that these temporary orders must now be made permanent, it was not considered necessary to bring them in in the nine years from 2010 to 2019?
The striking thing about the two Explanatory Memoranda is that they offer no evidence or explanation why making these orders permanent is necessary or what the consequences, based on past experience, would be if the sunset clauses were applied to Operation Brock. In essence, the Explanatory Memoranda—and thus the Government—are saying that these powers would be nice to have in perpetuity, even though we have no clue how frequently and for how long they would be needed, even based on past experience. In the absence of any proper case being made, this appears to be an example of a government desire to have powers for the sake of it.
The other possible explanation for making these powers permanent is that the Government know that the Prime Minister’s Brexit deal has significant downsides and are expecting significant disruption or delays at Dover and the Channel Tunnel if relationships with the EU in general, and the French in particular, deteriorate still further. In that situation, the Government would attribute the need to make these orders permanent primarily to delays for some other reason—such as industrial action or severe weather—rather than admit that the Prime Minister’s brand of hard Brexit is not all sweetness and light for Britain. The Explanatory Memoranda slip in a reference in paragraph 8 to
“delays from customs checks at the international borders in Kent”,
which may refer to the continuing problems associated with the Prime Minister’s Brexit deal.
I ask the following questions, to which I would like a full government response, either today or subsequently. As far as I can see, although I may be wrong, none of these questions is addressed in the Explanatory Memorandum. First, what happened before Operation Brock when there were delays at Dover and the Channel Tunnel unrelated to our EU exit or Covid? Once again, if those delays were so bad that the Operation Brock powers now need to be made permanent, why did the Government allow that position to continue for nine years from 2010?
Secondly, on how many occasions since 2010 has disruption caused by severe weather been such that Operation Brock would actually have been brought into operation, and for how long, had the now proposed permanent powers been available?
Thirdly, on how many occasions since 2010 has disruption caused by industrial action been such that Operation Brock would actually have been brought into operation, and for how long, had the now-proposed permanent powers been available?
Fourthly—as the noble Baroness, Lady Randerson, asked—on how many separate occasions since the present regulations first came into effect has Operation Brock been brought into operation in full, for what reason, and for how long on each occasion? As has been said, we have not had an evaluation of the effectiveness or otherwise of Operation Brock to date, yet these powers are being made permanent.
Fifthly, what is the cost of building and removing on each occasion the Operation Brock contraflow barriers on the M20? Have there been any occasions when the barriers have been put up and then removed without being used?
Sixthly, how many additional traffic officers have already been required in connection with Operation Brock and it being brought into effect, and how many will be required if the sunset clauses are removed and the order becomes permanent?
My seventh question relates to the Explanatory Memoranda, which refer to a national consultation between 26 May and 20 June this year, and say that key affected stakeholders in Kent were
“made aware of the consultation when it launched”,
whatever that phrase means in practice. We are then told, as has already been pointed out, that the consultation received 14 responses, which the Government admit was “low”, but that it included “members of the public”. Has any other national consultation received just 14 responses? Were the views of local residents actively sought? In some quarters, Operation Brock has proved controversial, with complaints from some local residents affected about disruption caused during work to install the required infrastructure.
I hope that the Government in their response will, not only today but subsequently, provide answers to the questions that I and others have raised, but also provide a rather better argued case than is contained in the Explanatory Memoranda as to why this order must now become permanent, contrary to what we had been told would be the case up to now. Clearly, something of some significance must have happened or come to light, which could not have been known or appreciated before, to justify the Government’s change of mind over bringing into effect the sunset clauses. We are entitled to be told exactly what that something is and the detailed case for the Government’s U-turn over the sunset clauses. I await the Government’s response.
My Lords, I thank all noble Lords for their considered contributions today. I hope to put their minds at rest—but also I shall write, because I do not quite have all the answers to the questions. That always annoys me a bit, but I shall do my best.
Briefly, I would like to take noble Lords back, although I am afraid that my memory is a bit dodgy, to what is probably just over 10 years ago, when I remember spending many hours with my children in a hot car in Kent trying to get across the short straits. It was dire. I sat on a local road in Kent for hours. I think it was due to industrial action—it was a sunny day, so it probably was not bad weather. But we know that, when there is disruption at the short straits, Kent stops. What we are trying to put in place today is something to help the people of Kent. I shall endeavour to set out the rationale behind that and how the interventions that we have put in place to deal with a potential no-deal exit and Covid turned out to be good things—progress, so to speak. That progress should be grasped on this occasion, and not left to rot.
Looking at where we are, the whole point of these regulations is to put in place a permanent framework around a temporary traffic management solution. My noble friend Lord Naseby asked whether it had been successful. I would say that the proof of that is in the pudding. It has been successful; we have not had great big tailbacks in Kent. We also know that it is more effective than the previous intervention, Operation Stack, which really did not go down very well with the local community.
The whole point of Operation Brock is that it allows HCV drivers to be stationed on the M20 and stops them rat-running through local roads and blocking them, as happened on my very unfortunate journey many years ago. It will only ever be used in the event of significant disruption at the short-strait crossings. The noble Lord, Lord Rosser, read an awful lot into that, which I am afraid is simply not there. All sorts of things could cause disruption at the short straits. The whole point of what we are trying to do today is that, if there is any disruption, the county of Kent does not come to a standstill, because that is not good for people trying to cross the short straits and certainly not good for the people of Kent.
(3 years, 2 months ago)
Lords ChamberActually, the focus at the moment is on making sure we have the right data and information from R&D to further develop and commercialise large-scale hydrogen refuelling systems. I mentioned previously the £23 million Hydrogen for Transport programme, which is looking at refuelling infrastructure alongside the vehicles themselves. We also have the zero-emission road freight trials, which are trialling hydrogen among a group of vehicles—it is not only about the infrastructure but about making sure that the range is appropriate for the vehicle in which it is going to be used.
The Minister has made reference to rail and funding. Trains powered by hydrogen are already in traffic in Germany, and successful trials have been undertaken in at least four other mainland European countries. What are the Government’s objectives, and what are the timescales for that funding for the development and introduction of hydrogen trains in the UK?
(3 years, 2 months ago)
Lords ChamberI thank the Minister for repeating the Statement. The Government have known for months and months that driver shortage issues would be exacerbated by the terms of the Brexit deal and their handling of Covid. Government Ministers are just now telling the industry to increase pay and improve conditions to recruit and retain more drivers, a much-needed step. However, how will that, or shortening the test process, or changing safety-driven driving regulations now address the immediate threat of worsening and widespread supply chain shortages this autumn? Or are the Government still sticking to what appears to have been their stance until now—which would explain the lack of timely government action—that the industry has been crying wolf over the impact of driver shortages this autumn?
My Lords, there is so much to respond to in that question. I am sure the noble Lord knows it is the case that this issue has been around for a very long time. I was talking to a colleague in the other place only recently and he said that one of the first things he did when he was elected in 2010 was go to an RHA reception at which they complained about the driver shortage. So the reality is that this has been a long time in coming. We absolutely will work with the industry to put in place all the things that they need to do.
The other thing to recall is that there are hundreds of thousands of qualified HGV drivers in this country who do not currently work in the sector. The industry must focus on getting those people back. By doing so, we have to focus on improving pay—there is anecdotal evidence that is coming through—and terms and conditions: my goodness, how simple is it to provide a clean loo, a vending machine and a comfy place to wait? Distribution centres need to absolutely step up and make sure that HGV drivers have at least those very simple things to make their day slightly easier.
There are lots of things that can be done. I do not take the point that the Government have been slacking. We have done an enormous amount and will continue to work with the industry to make sure that we keep goods flowing.