Revised Draft National Policy Statement for Nuclear Power Generation, volumes I and II (EN-6) Debate

Full Debate: Read Full Debate

Lord Liddle

Main Page: Lord Liddle (Labour - Life peer)

Revised Draft National Policy Statement for Nuclear Power Generation, volumes I and II (EN-6)

Lord Liddle Excerpts
Thursday 13th January 2011

(13 years, 11 months ago)

Grand Committee
Read Full debate Read Hansard Text
Lord Davies of Stamford Portrait Lord Davies of Stamford
- Hansard - - - Excerpts

My Lords, I totally agree with the noble Lord, Lord Jenkin, that there will almost certainly be a need during the next 20 years or so for more nuclear sites than are currently envisaged by the Government. Although I know nothing whatever about the specifics of Dungeness, I have already made a very strong case, and I will look forward to what the Minister says in response.

Perhaps I may begin by surprising probably both sides of the Committee by offering an element of at least modest congratulation to the Government and the Conservative Party on the distance that they have travelled on this subject since I left the Conservative Party some four years ago. At that time, the Tory Party’s doctrine was that nuclear power was a last resort. That was just one of the myriad issues on which I disagreed with that party at the time—it was not the most critical but it was important. I am very pleased to see that, in this matter at least if not in others, the Tory Party has advanced in the right direction. I still do not think that it has got to the right point. I think that its acceptance of nuclear is grudging and in some cases is based on something of a misunderstanding. I note that the overarching document, EN-1, states at paragraph 3.5.7:

“The Government believes that new nuclear generation would complement renewables”.

That seems to be wrong on two grounds, the first political and the other technical. The political ground is that it does not emphasise sufficiently the enormous importance of nuclear. It implies that nuclear is just one of a whole series of possible sources of future power generation. It must be the major source of electricity generation in the future. Secondly, it is quite wrong to say that it “complements” renewables; it is baseload, and renewables are not. What complements renewables is the natural gas combined cycle generation capability which stands alongside renewables, so that when the wind is not blowing, which is about 70 per cent of the time in this country, it can immediately be switched on and replace that peak load. However, nuclear is not a reciprocal of renewables, as that sentence suggests. Therefore, I think that the Government have not quite grasped the enormous importance of nuclear even yet.

We have with us a very able Minister who knows his brief very well. He made a response to a debate on this subject that I attended the other day to the effect that nuclear was not getting any subsidy because it was a proven technology. That seemed a very arbitrary and irrelevant criterion. It may well be that we do not need to give a subsidy to nuclear because nuclear investment will happen without it. If so, I would be the last to suggest that taxpayers’ money should be added to it. However, the criterion should be whether it is necessary to give a subsidy to achieve a desired purpose for the future strategic interests of the country. Obviously, it is necessary to provide subsidies for tidal and wind power, which we are doing, and I support that. Obviously, it is necessary to provide subsidies for the whole area of carbon capture and storage, which is uncertain technologically. I am happy with that investment, with all its risks. Investments do involve risks, and I do not have to tell the Minister that, as he has an investment banking background. I am in favour of that too. However, the criterion should simply be whether it is necessary, not whether a technology is more or less proven. We all know that nuclear technology is subject the whole time to upgrading and improvements of various kinds. That attitude reflects again the feeling of a reluctant commitment to nuclear power which characterises the Government’s policy, although that is a great deal better than the policy that I described, which persisted some four years ago. I hope that the Government will continue to advance in their thinking in the right direction.

I have one or two specific questions that I shall take the opportunity to put to the Government with the chance to have the answers on the record, because I suspect that they will be of interest to others in this country apart from myself. The first one relates to the whole issue of timing, which seems to me absolutely urgent. We are behind time. Of course we should invest in nuclear, and the Blair Administration should have invested in nuclear. There is no doubt about that and I am perfectly happy to accept that point. We should have got into this business 10 years earlier, and we now find the Magnoxes being decommissioned and the EGRs, potentially, being decommissioned. We do not have time to replace that capacity quickly enough. At paragraph 3.5.9 of the EN-1 document, the Government say that they believe it is,

“realistic for new nuclear power stations to be operational in the UK from 2018, with deployment increasing as we move towards 2025”.

That is welcome as a statement of a target but it does not say enough. Can the Government fill out that particular sentence? How many new nuclear power stations do they expect to be operational by 2018? We very badly need to know. When will those power stations start to contribute electricity to the grid? Can we have a little more detail on that?

My second question relates to the further studies referred to in volume 1 of EN-6. I was able to get volume 2 only when I came into the Committee today. I tried yesterday in the Vote Office—if that is the right name for it—where you get papers, to get volume 2 and was told that it was not available. If I were still in the House of Commons, I would probably make a point of order on that. We do not make points of order here, so I cannot do so. I mention it in passing.

Page 4 of the EN-6 refers to a whole lot of studies that will be required. Paragraph 1.6.5 says:

“Further studies will need to be carried out, as part of the project HRA and environmental impact assessment”,

and then, in the following paragraph:

“Further studies will need to be carried out, as part of the project EIA process for individual development consent applications”.

In the fourth paragraph within paragraph 1.6.5, it says:

“These issues will need to be considered in project level HRAs and EIAs”.

The final sentence on the page is:

“The significance of these effects can only be determined through studies as part of the project level EIA and HRA”.

We have a welter of new environmental studies to be undertaken. Are these going to be prerequisites for the granting of planning consent at the beginning of construction of these nuclear power stations and, if so, is that 2018 target at risk, or are the Government confident that whatever happens with these studies, that 2018 deadline—which is far too late in terms of the national interest but we have to do the best we can—will not be at risk? We need to have a clear, unambiguous answer on that.

The third question for which I should be grateful for an answer relates to the whole issue of geological waste. Paragraph 2.11.3 on page 14 of EN-6 says:

“In reaching its view on the management and disposal of waste from new nuclear power stations the Government has in particular satisfied itself that … geological disposal of higher activity radioactive waste, including waste from new nuclear power stations, is technically achievable”.

It may be technically achievable, and that is good news. We know that it is technically achievable because the Americans are investing in a major deep nuclear waste project, and the Finns are investing in one as well, in both cases in granite, and taking into account all the obvious risks. But what are the concrete plans from the Government for making progress in that area? I think that earlier I heard the Minister say that the intention was to have this deep nuclear waste storage facility in place by 2130. Did I hear him say that or did I mishear him?

Lord Jenkin of Roding Portrait Lord Jenkin of Roding
- Hansard - - - Excerpts

Perhaps I can help the noble Lord, because this was a subject that the Select Committee on Science and Technology considered at some length when we had a session on relationships with the Committee on Radioactive Waste Management. It was perfectly clear that it will deal with the legacy waste first and then the new-build waste afterwards. We were told very firmly that the target date for the repository would be 2040 but, because it will have to deal with all the legacy waste first, of which there are considerable volumes, it may not be until the next century that it will start being able to deal with the new-build waste. That is why in these reports such stress is laid on the question of the interim storage of that waste. The future is quite clear. Yes, I agree with my noble friend Lord Teverson that it is too long a period. That was a view that the Select Committee took—and I am pleased to see the noble Lord, Lord Broers, in his place—but that is what is currently planned. However, it is a clear programme to go ahead, and the statements in the national policy statements are really justified.

--- Later in debate ---
Lord Liddle Portrait Lord Liddle
- Hansard - -

My Lords, I shall speak briefly in this debate from a Cumbria perspective, where I was until November last year the chair of the local economic development body. This statement will be welcomed in Cumbria as a major milestone in what is a long road to building nuclear as an essential part of our energy mix in this country. I should like to be more generous to the coalition than was my noble friend Lord Davies. Things have moved along since the election on the nuclear question, in a positive way. I particularly welcome the fact that the Secretary of State for Energy and Climate Change has come out so clearly in favour of nuclear being part of Britain’s future energy mix. This is a major step.

I draw attention to the huge potential of the nuclear future in west Cumbria, which I have got to know extremely well over the past three or four years. Not only is Sellafield the centre of our nuclear clean-up but there is also very big potential at the site for power stations in addition to the one initiative that new generation has started to show an interest in today. The county council believes that there could be more than one new station on the Sellafield site to deal with the needs of nuclear post-2025. There is also the potential for reprocessing. If the Minister could give us some indication of what the Government’s timetable is for thinking about decisions on this issue, it would be very helpful to the local community. The communities in Cumbria have expressed an interest in the question of the long-term waste site, which is very important indeed.

The point that I want to make on this is a simple one. This is an important planning stage that we have reached on this issue, but many more issues will have to be resolved if we are going to build—

Lord Taylor of Holbeach Portrait Lord Taylor of Holbeach
- Hansard - - - Excerpts

I am grateful to the noble Lord for intervening in the gap, but the rules are that there is a limited time for speeches in the gap. I hope that four minutes is recognised by all speakers, as a number of noble Lords want to come in. I apologise for interrupting the noble Lord, but I am sure he will want to be on the right side of the Companion.

Lord Liddle Portrait Lord Liddle
- Hansard - -

I shall try to be very brief. A lot of issues have to be resolved, including questions relating to the infrastructure in the area, as well as questions to do with skills and grid connectivity. It is not simply a question of planning approval followed by the private sector taking the initiative and solving all these questions. If we are going to make a success of Britain’s energy coast, we have to build an effective partnership between the Government, the private sector nuclear developer and the local community. That is what I want to stress. In Cumbria, it would be very helpful if we could hear from the Government that they are committed to such a partnership. Under the previous Government, we established a strategic forum to try to bring all the interests together to look at what needed to be done, and I hope that the Government can indicate their intentions to work for the realisation of this enormous potential in Cumbria, which is for the good not just of Cumbria but of Britain in giving us energy security and a low-carbon source of generation, and has enormous international potential. I hope I have been brief enough.

--- Later in debate ---
Lord Marland Portrait Lord Marland
- Hansard - - - Excerpts

We would naturally hope them all to be going by 2025, because we have made a huge pathway commitment to it. However, I shall not stand here and say, “It is going to happen on this day at that time”, because we are going into something that has not happened for 20 years and there is a long process to go through.

My noble friend Lady Parminter asked about the security risk, which is fundamentally important. I am personally reviewing the security of our sites, particularly Sellafield. Are the civil nuclear police fit for purpose? Are they operating in a way that enables them to resist the modern threats of a rapidly changing world? The Office for Civil Nuclear Security has been set up to address that. It reports to me, to persuade me that security is tight. It is fundamentally important that we ensure that those sites are safe and secure, particularly the hazardous areas.

The noble Lord, Lord Liddle, rightly pointed to Cumbria becoming a centre of excellence for reprocessing. The noble Lord, Lord O’Neill of Clackmannan, made the vital point that waste must be not a liability but an asset. As I have told him and the House previously, I have commissioned a cost-benefit analysis of a Mox plant. If we have the biggest plutonium stock in the world, we must turn that liability into an asset. I have had a second meeting on the subject. We have already had a write-round to Cabinet to ensure that we can perhaps go further on that plant. I hope that I will be able in the next few months to give him much stronger assurances as to its prospect. It is madness to have it sitting there if we can make it a non-cost exercise.

However, we must remember that we have failed at this once already. We have a Mox plant that was not fit for purpose, so we must get it right—it is very important, with new technologies, that we do that. This is of course a clear message to the people of Cumbria, because that is where the Mox plant would be located. I do not think that we have any problem as a Government in sending clear messages to the people of Cumbria about the importance of that site and of their role in it. The next generation of nuclear waste reprocessing has to carry us forward for years to come as we replace the current existing plant.

Lord Liddle Portrait Lord Liddle
- Hansard - -

Do I take from the Minister’s very positive tone that he very much hopes that, during this year, the issue of the Mox plant can be resolved?

Lord Marland Portrait Lord Marland
- Hansard - - - Excerpts

It can be resolved easily within this year—I hope within the first half of it. A huge amount of work is going on. You do not do a Cabinet write-round, as far as I understand, unless you are fairly committed to making something happen. I am giving your Lordships this information because it is something that I initiated before Christmas.