(7 months, 3 weeks ago)
Lords ChamberI am very conscious of the issue around the Hammersmith Bridge, but it is of course an issue that concerns the local authorities; it is a matter for them to resolve.
My Lords, will the Minister reflect on a more recent history lesson relating to the present Question—the experience of HS2? The planning application was delivered, the parliamentary procedures were concluded and considerable—if not vast—expenditure was made on the purchase of properties and costs involved in the route. Yet this Government—at a minute to midnight of the project’s completion—pulled the plug, on a Prime Minister’s whim. What hope is there for any other major infrastructure policy being completed under this Government when that lesson has not been learned?
I note the noble Lord’s frustration over planning, but HS2 is outside the scope of this Question.
(8 months, 1 week ago)
Lords ChamberNo, I do not agree that the Government have a gap in their industrial policy. Rail manufacturing plays a very important role in growing the UK economy and there is a strong pipeline of future orders for UK rail manufacturers, including upcoming procurements in the market being run by Northern, Chiltern, TransPennine and South- eastern. That competition process is open for all manufacturers to bid, including of course Alstom. The department is also working with His Majesty’s Treasury to set out a pipeline for expected rolling stock orders, to provide the sector with further clarity over the near term.
My Lords, I think it was significant that there was no reference at all in the Minister’s Statement in the Commons to what I consider to be the inevitable consequences of the cancellation of the Crewe and Manchester sections of HS2: it is obvious that that was significant in terms of job losses. We already know about the losses that have occurred from money spent on both those projects that is now wasted because the line is not being built. What is the Government’s estimate of the loss of jobs in construction and manufacturing—which the Minister has focused on so far—as a direct result of the cancellation of those legs of HS2?
I cannot comment on the construction side, but Alstom is part a contract with Hitachi to design, build and maintain the HS2 trains for phase 1 only—that is 54 trains. Phase 1 of HS2, between Birmingham and London, will continue, with, as I have said before, a rescoped Euston station. HS2 Ltd has written to the joint venture confirming that the original order for those 54 trains for phase 1 remains unchanged.
I can only repeat what I have just said. The Government are working very hard to make sure the company remains at the location. New competitions have recently commenced for rolling stock on Northern, Southeastern, TransPennine and Chiltern railway lines, as well as procurements for fleet upgrades on East Midlands, Chiltern and CrossCountry. Alstom is very capable, and able to compete for this work.
Perhaps I could ask for a specific answer on this. The Minister referred to the rolling stock that has already been ordered in respect of London to Birmingham, but he cannot give an estimate of job losses following the cancellation. There clearly must be consequences for rolling stock when you do not build a railway to Crewe and Manchester that you planned to build. So can the Minister at least tell us how much rolling stock in total is not now going to be required and constructed as a result of the closure of the new railway?
I cannot give the noble Lord that figure at the moment, but I will certainly look into it and come back to him.
(10 months, 1 week ago)
Lords ChamberTo ask His Majesty’s Government what proportion of the £36 billion transport investment plan ‘Network North’ will be allocated to schemes outside the Northern region.
My Lords, £36 billion of funding redirected from HS2 will see improvements to transport throughout the country. Every penny of the £19.8 billion committed to the northern leg of HS2 will be reinvested in the north, every penny of the £9.6 billion committed to the Midlands leg will be reinvested in the Midlands, and the £6.5 billion saved through our rescoped approach at Euston will be spread across every other region of the country.
My Lords, the Minister knows that this document, Network North, is supposed to compensate the Midlands and the north for the scrapping of HS2 north of Birmingham by providing lots of other rail schemes more quickly. Will the Minister publish a list of these new schemes, which does not seem to be available at the moment, with estimates of the cost of each one and when they are likely to be operational? Will he tell us how he calculates the £36 billion that he says will be saved by the cancellation of HS2 north, bearing in mind that millions—possibly billions—have already been spent and now wasted? Finally, how can a document called Network North include among its proposals the promise of a new station at Tavistock?
I am very grateful to the noble Lord for his Question. I will have to look at his point on the calculation and come back with an answer; I do not have the figures broken down in front of me. Network North will deliver a wide range of rail infrastructure investments across the country. While I have already given the exact figures for what we will spend on the northern leg of HS2 and have committed to the Midlands leg, we are also building a brand-new station and line connection in Bradford, with journey times reduced from 56 to 30 minutes to Manchester via Huddersfield. We are better connecting major cities across the north, with more frequent trains, increased capacity and faster journeys, expanding the network. We will upgrade connections between Manchester and Sheffield, Leeds and Sheffield, Leeds and Hull, and Hull and Sheffield. We will fully fund the Midlands rail hub, increasing investment to £1.75 billion and connecting more than 50 stations. We will upgrade the rail links between Newark and Nottingham, halving journey times between Nottingham and Leeds. I could go on, but I am very happy to write to the noble Lord with more detail.
(1 year ago)
Lords ChamberMy Lords, I do not think the Minister answered properly the question about HS2. It was, in my view, a disastrous decision made by the Government to cancel the Derby and Manchester links, so can he tell us how many trains were required, had those links still been about to be built, and how many trains are now required, so we can work out the deficit for ourselves? While he is about it, will he please answer a question which his department has repeatedly been unable to answer for me as a Written Question: precisely how much money has been lost—wasted—as a result of the cancellations to which I have referred?
The noble Lord asks two very fair questions. I do not have those details to hand, but I will ensure that he gets them in written form.
(1 year, 5 months ago)
Lords ChamberIt is a 20 mph zone because the Mayor of London has decided that it should be.
My Lords, I am biased but the question from my noble friend Lord Campbell-Savours, on the emission levels associated with a 20 mph limit and a 30 mph limit, was splendid. I did not catch whether the Minister answered that question, which is presumably a pretty precise one, on which there can be scientific evidence. Can she try to answer it now?
I am not aware of any research in that area but I will take that question back to the department and write to the noble Lord.
(1 year, 6 months ago)
Lords ChamberMy Lords, the Minister mentioned age. I am sure I am right in saying that a big proportion of people taking the test are age 17, 18 and 19, and many of them will need a driving licence to find employment, or at least it will be very helpful to them when they have one. What alarms me, among other things, about this long waiting list—the Minister has already told us that more than half of the people taking tests have to do it twice at least—is just how much the average cost is to a 17, 18 or 19 year-old, with top-up lessons if it is a prolonged period waiting for a test. Just how much does it cost? It is really alarming if there is a barrier to people simply on the basis of not being able to afford to do it.
I accept that there is a cost to driving, to car ownership and to ensuring that one is safe on the roads in respect of one’s responsibility to other people. We believe that the time taken to ensure that one is fully trained is important. That is why the second piece of research that we are doing is around a graduated learning scheme where we have asked the Driving Instructors Association to explore whether we can introduce a modular approach to learning. That will help all candidates go through the process and become safe drivers, and it may help them to minimise the costs as they learn the right skills at the right time.
(1 year, 8 months ago)
Grand CommitteeMy Lords, I happily add my thanks to our two chairs; to our secretariat, who have been splendid over the period of the production of this report; and to my colleagues on the committee, who came from varied backgrounds. What a pleasure it is to follow the noble Lord, Lord Haselhurst. I never thought that I would hear the 60 year-old report of Lord Redcliffe-Maud referred to but, like the noble Lord, Lord Haselhurst, I can remember it. It was a splendid report.
The possible scope of this report was enormous. It could have ranged—it has to a degree—from e-scooters to HS2. I will just concentrate on two things. One is London versus the rest, if I can put it in those terms, and the other is the variety of provision in cities of similar size and with similar challenges, in many respects.
On London versus the rest, the Government kindly referred us to the significance of this comparison in their response to our report. They said that, in their levelling-up White Paper,
“the Government set itself the mission of, by 2030, bringing standards of local public transport connectivity across the country closer to those of London”.
I give them full marks for ambition, but we need to test how they cope as they go along. Of course, we all recognise that London has unique characteristics in the provision of public transport, the size and reach of the area and so on, but still, these figures need to be put on the record.
The expenditure-per-head figures for 2019-20 are as follows—they are pre-pandemic, so perhaps not distorted by some of the pandemic factors. For London, it was £882 per head. The next largest region was the south-east, with more than £500 per head. The lowest was the east Midlands, at £300 per head. The average for all regions outside London was £489, which means that London is spending nearly double the amount of any other region in the country. Work that one out, Sherlock. It is not difficult to deduce from that that services in London are better than elsewhere.
What a civic or regional leader would give to have their expenditure availability for public transport doubled—it would have something of an impact, however competent or otherwise the leaders or the regions may be. I simply must ask the Government: how is their ambition progressing towards the deadline of 2030? Is it their intention to reduce the disparity on spending per capita? Do they regard spending per capita as a significant measure of how well the various regions are doing, or are likely to be able to do? Are they progressing towards any comparability at all with London?
The other issue, of the variety of services that apply in cities outside London, strikes me—I hope I am not the only one—as quite a significant factor. We know that all cities are different, that there are big contrasts and so on, but you would expect that large, urban areas in a fairly small geographic country such as ours would have some obvious similarities in the way that they tackle the common problems of urban transport. To give just one example of the contrasts that exist: Nottingham, Manchester, Birmingham, Sheffield and a number of others have light rail systems, yet Leeds, Liverpool and Southampton are among the largest urban centres in Europe without a light rail system. There might be good reasons for that, but I am not aware of them, and I am not quite sure who would be able to tell me.
In our report, we looked at three particular types of urban transport. We looked at light rail. We looked at very light rail and, like the noble Lord, Lord Haselhurst, I am very keen to see how the Coventry experiment develops. It is scheduled to start in 2025, I think, and if it works as a very light rail system—with the advantages of light rail but without the huge costs of establishing the system and then maintaining it—it may be a model that is of value to everyone else. The third system that we looked at was a bus transit system, which has some of the advantages of light rail but cannot quite match it in terms of reliability, predictability and so on.
We made recommendations in our report which flow from this fact that I have tried to establish about the big variation across the country. One recommendation was that we should try to eliminate some of the disadvantages that exist in the funding system at present; the noble Lord, Lord Shipley, dealt with that, so I will not repeat what has been said. We make the case in our report for a block grant system, which would make life easier for people making the applications and make life more predictable for the local authorities or regional governments that exist. It is something that the Government should consider.
Perhaps most important in this particular area is that discussion and evaluation of the schemes that exist is absolutely fundamental. We are not talking about huge sums of money here, just the common sense of recognising that there are different systems in roughly comparable areas but no proper evaluation of how they are all working. With this, I am in fact suggesting something to the Minister that does not cost large amounts of money—though I fear that my suggestion that the regions should do as well as London would cost large amounts of money. This is why I would particularly like to hear her response on that point.
(1 year, 10 months ago)
Lords ChamberIf the noble Lord will forgive me, I am not quite aware of where Lampeter is—I am being told that it is “on the left”. For any rail investment, we must look at the benefits and costs. If the Welsh Government want to look at that and bring forward proposals that show that the benefits would far outweigh the costs, we would of course look at them.
Further to my noble friend Lord Griffiths’s question, it is very welcome that we are talking about, we hope, opening lines that were vandalised by Dr Beeching. The Government have had a plan for doing some of that, so can the Minister update us as to how many lines closed by Beeching are now in the process of being reopened?
I do not have the detail on that, but I know that the Okehampton line has been reopened and that there is significant work going on in other places. I will send an update on that programme to the noble Lord.
(1 year, 10 months ago)
Lords ChamberThe noble Lord is absolutely right. Road safety is not just about motorists; it is about everybody who uses the roads, including cyclists and pedestrians. We need to make sure that all road users can interact safely with each other to try to reduce deaths.
The Minister seemed unconvinced by my noble friend Lady Hayter’s evidence of how motorists feel about dazzling lights coming towards them—it is certainly anecdotally the case from people I have spoken to—but, if she discounts my noble friend’s evidence, what evidence does the Minister’s department have on this issue, which seems to be of considerable concern?
I was just trying to point out that the evidence noted by the noble Baroness, Lady Hayter, was from a survey. The Department for Transport did scientific research into this matter in 2018. As I said, the conclusion overall was that there was no direct adverse health effect from LED light emissions. However, that does not mean that we do not continue to take a great interest in this. We recognise people’s concerns about dazzle and glare, which, indeed, is why we have pressed the international community to make some headway.
(2 years ago)
Lords ChamberI do not quite have the data the noble Lord is looking for. However, I think this may go some way towards meeting that. Our view is that Avanti’s recent performance has not been good enough, and we are seeking to understand why that is. We know that about 20% to 25% of train services have been cancelled due to staff shortages of both drivers and train managers, and we know that there has been a significant amount of sickness recently. Obviously, we are investigating that with Avanti. However, I will just say, looking at the bigger picture, that there are very significant national strikes. Build on to that some action short of strikes—for example, by fleet maintenance workers on South Western and Chiltern—and this leads to stock imbalances on these shoulder days, as does, of course, the removal of rest-day working. It takes many different types of organisations to run a railway. One of those is the unions, and we must make sure that we encourage the unions to cease their action and get back to running our railways.
My Lords, the Minister pointed out that there are many different organisations involved in running the railway. We know that the main reason for that is that the railways were privatised and we ended up with huge numbers of separate companies of varying quality, some very poor indeed, running or trying to run a railway; a fragmented system; and a system that, partly as a result of that fragmenting, has a near-incomprehensible system of ticketing at times. I just ask her to agree, whatever our differing views on privatisation—I know what mine are—that what the railway needs is a unified railway structure, with clear lines of responsibility and proper accountability to the British public.
I think I probably agree with the noble Lord, although I suspect that I would achieve those goals via an entirely different method. We have come a long way in getting the White Paper out there and starting work on the long-term strategic vision for rail, which is a plan for 30 years, and the GBR transition team is currently analysing hundreds of responses to the call for evidence. The starting point is a long-term vision; it must be accountable to taxpayers but also much more accountable to passengers.