All 1 Lord Grocott contributions to the High Speed Rail (London - West Midlands) Act 2017

Read Bill Ministerial Extracts

Tue 24th Jan 2017
High Speed Rail (London-West Midlands) Bill
Lords Chamber

Report stage (Hansard): House of Lords & Report stage (Hansard): House of Lords & Report stage (Hansard): House of Lords & Report stage (Hansard): House of Lords

High Speed Rail (London-West Midlands) Bill Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (London-West Midlands) Bill

Lord Grocott Excerpts
Report stage (Hansard): House of Lords
Tuesday 24th January 2017

(7 years, 11 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts Amendment Paper: HL Bill 92-I Marshalled list for Report (PDF, 105KB) - (20 Jan 2017)
Lord Snape Portrait Lord Snape
- Hansard - - - Excerpts

My Lords, I am not quite sure whether I can help the noble Baroness. I asked the same question about a mined tunnel in Committee and the noble Viscount, Lord Astor, explained it all to me. The problem is that I have forgotten the explanation. It sounded very plausible at the time. I am sure if the noble Baroness consults her noble friend she will get all the details of what should be done.

I listened to the noble Baroness who spoke earlier from the Conservative Benches. She made a fleeting appearance in Committee and said pretty much the same thing; I hope she will forgive me for saying so. I do not think emotive language about a two-track railway destroying the countryside takes this House or this debate any further forward. What did she say: “Just another 8.7 kilometres of tunnel”? That is in addition to the 47 kilometres of tunnel out of the 210 kilometres of the high-speed railway line. This is expensive lunacy in my view. I make a plea again on behalf of those who travel by train. People do not travel by train to gaze at a tunnel wall. Some of the semi-hysterical comments—I exempt my noble friend Lord Stevenson, he will be relieved to know—about the damage that the railway line will do to the Chilterns are just that, sheer hysteria. They were all made 30 years ago at the time of High Speed 1 across Kent, and none of it proved true then. Indeed, the economy of Kent has benefited enormously from High Speed 1.

The secondary point—the great unmentionable in this debate on the demand for tunnels—is of course that some people making these points about additional tunnelling do so on the grounds that there is no benefit from high-speed rail passing through the Chilterns to those who live there because there are not any stations. Well, there may be at some time in the future, as we have heard. Again, I exempt my noble friend from that; he is my Whip and I had better tread carefully. Once you get out of London, the M40 passes through the Chilterns without a mile of tunnel. Has that motorway destroyed that part of the world? I do not think it has. My noble friend nods his head but I do not think most people agree. Mind you, of course many of them use the M40 and that they are not going to be able to use the train is behind a great deal of the opposition, in my view. I hope that the Minister resists temptation. Whether it is cheaper to build a mined tunnel or go ahead with the existing proposals, as the Select Committee recommended, I know not. Nobody could have worked harder than the committee to look at those objections. I think there is quite sufficient tunnelling already so far as this high-speed railway is concerned, much of it expensive and unnecessary.

Lord Grocott Portrait Lord Grocott (Lab)
- Hansard - -

Will my noble friend answer a question that I feel I should know the answer to? How much has all the additional tunnelling that has come on as a result of the various stages of this Bill added to the cost of HS2? I have a slight suspicion that there may be the odd person—I am sure no one in this House—who has demanded a tunnel, for whatever reason, and then complains about the overall cost of the railway once the tunnelling has been accommodated.

Lord Snape Portrait Lord Snape
- Hansard - - - Excerpts

I am sure that the Minister, who is listening, will be able to give my noble friend a detailed answer to that question. We see with this project, as we have seen with others, that many of those against the project as a whole for reasons including its cost are the first to demand special provision in their part of the world, regardless of the additional cost. I hope the Minister will resist temptation, as 47 kilometres out of 210 is—I repeat—quite enough for me. Whether or not I will be around in 2026, who knows, but I will do my best and I wish the same to other noble Lords on both sides of the House. I think we deserve better than an extended view of a tunnel wall. Let us see this glorious countryside, that we hear so much defence of in the context of this Bill—mistakenly in my view.

--- Later in debate ---
Lord Ahmad of Wimbledon Portrait Lord Ahmad of Wimbledon
- Hansard - - - Excerpts

My Lords, I thank all noble Lords for their participation and contributions to the debate. I am minded to start with the comments of the noble Lord, Lord Snape. Certainly when he suggested that I should not be tempted by these amendments, I was reminded that we start proceedings in the House every day with the Lord’s Prayer, which says:

“Lead us not into temptation”.


I will fulfil that prayer’s requirements in my response this afternoon.

We have already touched, even this afternoon, on the cost of HS2. I say again to all noble Lords that the costs of HS2 have been the subject of intense analysis and review over several years, as we have already heard. As I indicated earlier this afternoon, we will continue to review costs for years to come. Let me once again praise the incredible work done collectively by the two Select Committees of both Houses. Let us put this into perspective: it is a combined period of two years of hearing evidence, considering all aspects of the proposed Bill, and on many occasions reviewing the costs for elements of the phase 1 scheme when asked to consider potential alternative options. It is sometimes suggested, and has been suggested again, that somehow there has not been an exhaustive examination; I challenge that. The best way to do so is to read the detailed analysis, recommendations and reports of both Select Committees. I recommend that to all noble Lords who have not yet had the pleasure.

I thank the noble Lord, Lord Young of Norwood Green. As he noted in Committee, and as he has reminded us, the Select Committee considered all options that were presented for additional lengths of tunnelling in the Chilterns and in Wendover. It was not convinced of the need to recommend any further work on any of these options. As I have already said, these were exhaustive discussions, and I believe that that decision should be respected.

The Select Committees of both Houses also considered in detail the provision of additional environmental mitigation measures. It pains me to say it, but I disagree with my noble friend Lady Pidding that the Government have not published details of how certain things have been considered during the process of the Bill. It is worth noting, as I hope my noble friend will acknowledge, that many assurances have been given to the areas covered by the Chilterns area of outstanding natural beauty, including the provision of a £3 million fund for additional environmental mitigation measures.

My noble friend raised the issue of publishing tunnelling costs. The information used to assess the decision on whether it is appropriate to undertake a bore tunnel past Wendover and an extended bore tunnel through the Chilterns was published as part of the exhibits placed before both Select Committees that were used to establish the Government’s position regarding the decision not to provide any additional tunnelling. It was that information that the Select Committee—I refer to the Commons Select Committee here—used to recommend an extended tunnel in the Chilterns and an extension to the tunnel in Wendover. The exhibits included figures for several Chiltern tunnel options, which I mentioned in Committee. They range from £82 million to £485 million. The additional extension of 2.6 kilometres to the Chilterns tunnel, which I hope my noble friend acknowledges, was agreed following a specific recommendation from the Select Committee in the other place. That was at a cost of £47 million.

Turning to the costs more generally, an updated cost estimate for the project is published, as I said earlier this afternoon, at every iteration of the business case. I repeat that the next iteration is due for publication in the summer of 2017. The project as a whole, including its cost estimate and business case, is subject to regular independent review from the Infrastructure and Projects Authority—

Lord Grocott Portrait Lord Grocott
- Hansard - -

I could not keep all those figures in my head. Will the Minister be able to tell us at some stage, not necessarily now, the total additional cost of tunnelling on top of the other costs of the railway?

Lord Ahmad of Wimbledon Portrait Lord Ahmad of Wimbledon
- Hansard - - - Excerpts

I referred to the specific addition, but I note what the noble Lord has said. I will write to him in that respect and ensure that a copy of the letter is laid in the Library of the House for the benefit of all noble Lords. I reassure noble Lords that this is an area that the Government have considered very carefully. Indeed, it has been scrutinised specifically by the Select Committees of both Houses.

I want to pick up on a couple of points that have been raised. The noble Lord, Lord Stevenson, asked specific questions. I will write to him in detail on some of the issues that he raised, but my understanding is that the response on Section 85 was set out in the Government’s response to the 2011 consultation, which was subsequently published in January 2012. The other issue, of environmental mitigation, is also included in the business case, as was assessed according to the department’s guidance. As I said, the noble Lord raised some specific points and I will write to him in that respect.

The noble Lord, Lord Berkeley, raised the issue of the ideas that contractors may put forward. As I am sure the noble Lord is aware, contractors come under the powers in the Bill, including the limits on deviation. Contractors are also limited by the environmental statement. Within those limits, contractors will be encouraged to be innovative. Indeed, a key commitment to Parliament in the environmental minimum requirements is that we will seek to reduce the environmental effects beyond those in the environmental statement itself. That will be done by innovation, much akin to what the noble Lord suggests.

I reiterate the point that the Public Accounts Committee in the other place and the National Audit Office will continue to examine the costs of HS2 as we move into the detailed design and construction stage and more detailed cost information becomes available. I hope my detailed response demonstrates what has been done, the analysis that has been undertaken and the revisions that have been made in response to issues that have been raised, particularly in the area of the Chilterns. I hope it demonstrates to noble Lords that the tabled amendments before us this afternoon are unnecessary. I underline that these issues have been fully examined, not by one Select Committee but by two. I have already underlined the amount of time they took and detail they went into in their careful consideration. As a Government, we feel that any further cost review at this stage would serve only to delay the railway, which I am sure is not the intention of the majority of Members in your Lordships’ House. I hope that, with the detailed explanation I have given, the noble Lord is minded to withdraw his amendment.