High Speed Rail (West Midlands–Crewe) Bill Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (West Midlands–Crewe) Bill

Lord Greaves Excerpts
2nd reading (Hansard): House of Lords
Monday 9th September 2019

(5 years, 1 month ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts Amendment Paper: Notices of Amendments as at 10 June 2019 - (11 Jun 2019)
Baroness Jones of Moulsecoomb Portrait Baroness Jones of Moulsecoomb (GP)
- Hansard - - - Excerpts

Shouting at us for longer than the advisory speaking time really does not convince anyone. It does not look good and I think that we ought to have a little more courtesy.

Lord Greaves Portrait Lord Greaves (LD)
- Hansard - -

It is the Government who should have the courtesy.

Lord Bradshaw Portrait Lord Bradshaw
- Hansard - - - Excerpts

I was going to go on to ask when progress is expected on the route across the Pennines. Do the Government constrain the activities of Transport for the North compared with the improvements made between Edinburgh and Glasgow and the plans of Midlands Connect by, for example, withholding funding from Transport for the North? The north of England should be very concerned about the slow rate of progress.

Much is made of disruption because of the noise and disturbance caused by building HS2, but measures will be introduced to minimise that. I am reminded of a conversation I had a couple of years ago with a Labour MP from Kent. I asked him whether his constituents had complained about the noise and impact of HS1. He replied, “No, but I had sackfuls of correspondence from them about the continuing noise and disturbance coming from the adjacent M20 motorway”. There is a light at the end of the tunnel for those living close to HS2. The benefits of and the green agenda for more motorway building are now seen as a totally incorrect response to the problems we face. The debate is about capacity for passengers and freight—there is no spare capacity on the railway. We want cleaner air, fewer people flying and less congestion, and to that end our railways need to be expanded.

However, this Government lack foresight. What Administration would build the east-west link from Oxford to Cambridge without electrifying it? It costs far less than coming back after the line is open. They should seek to modernise links between Southampton and the north and between Felixstowe and Nuneaton. Both schemes would remove many heavy lorries from our roads, much to the benefit of our climate change agenda.

Freight customers are lining up to use the railway. Creating an electrified rail network would reduce serious accidents. HS2 could and should reduce its costs by looking at what some regard as excessive technical standards and probably reduce the speed of operation. The extension from Old Oak Common to Euston should also be called into question. For the future, we need better and more capacity, and to that end HS2 should proceed.

--- Later in debate ---
Lord Greaves Portrait Lord Greaves (LD)
- Hansard - -

My Lords, I start by saying that I agree with pretty well everything that everybody—except for one noble Lord—has said so far; I will try not to repeat those things. I say gently before beginning that I have looked in the Companion and I cannot find anything at all about the ability of the Government to impose arbitrary time limits on speeches beyond the normal time limits for Second Reading debates. If we are to do this in future, it is something that should be discussed.

It is nearly 10 years since all this started, and where are we? I am tempted to say that we have got as far as digging up cemeteries. I accept what the noble Lord, Lord Adonis, said that there is rather more work than that going on, but it is taking an inordinate amount of time. The proposed route for phase 2a, which we are discussing today, was first published four years ago. I compare this not with China—as a place where things can be done without asking people what they think—but with France. I go to the Pyrenees most summers and I watched the construction of the line from Tours to Bordeaux, extending the existing TGV line, which seemed to be done in a small number of years. I have travelled on it twice in the last two years; I have to say that not only does the line seem okay but so does the new TGV, which I travelled on, there and back, two or three weeks ago.

Last Friday, going home I travelled on one of the new Azuma trains from Kings Cross to Leeds. In comparison—from the point of view of the ride, the acoustics and, of course, the infamous seats—I felt that I had gone back 40 years. Then I reminded myself that the Azumas were ordered and specified by the Government themselves, which I think says something.

All we get are reviews and promises of delays. I am reminded that the Victorians effectively built the mainline network in England in less than a quarter of a century. We seem to take a very long time indeed to do these things. A lot of the opposition to HS2 is about the competence, efficiency and effectiveness of the people doing it: the Government, HS2 Ltd and everybody else. We must distinguish between the need for the line—the project itself—and the need to improve the way these things are done. People attacking the way that it is being done—alleged efficiency, overspends or whatever—is not an argument against building the line; it is an argument to say that we need to do things better in this country.

The proposal that we are talking about today—extending to Crewe—is a relatively small part of what I hope will, in the future, become a substantial network connecting the main regional centres of the country. We need to start thinking about it in those terms. It is not a question of a line from Birmingham, Manchester or Leeds to London, with all this London-centric thinking. We should be thinking about a network that connects all the major cities in the area.

As far as extending it to Crewe is concerned, it would be a very good thing for people in Lancashire and the north-west, as well as, I would hope, people in Scotland. It would allow trains from the new HS2 line to run further north, just like the train I caught to Lourdes the other day—I have to say I was going there for the mountains and not for other purposes. That train slowed down after Bordeaux and became a normal fast express. Then, when it got past Dax, it slowed down a lot. The advantage is that people can do a lot of the journey at high speed and then continue to other places. When the new line to Crewe opens, as I hope it will, it should be the basis of Scottish services as well, not just services to the north-west.

Lord Adonis Portrait Lord Adonis
- Hansard - - - Excerpts

It is integral to the plan that there will be through services to Glasgow and Edinburgh.

Lord Greaves Portrait Lord Greaves
- Hansard - -

Absolutely—but these things need to keep being said, because people who are not served by the particular line concerned say all the time, “It’s no use to us”. People in the north-east are saying that—quite wrongly, because the proposal, especially when we get to phase 2b and so on, is to run services through to the north-east.

I live in Colne in Lancashire, at the end of the worst branch line in the north of England, and I am acutely aware that when the Prime Minister comes to the north and promises a fantastic new HS3—or HS15—or a northern power something or other, over the short distance between Manchester and Leeds, it is no use to us. There may well be merit in building a new high-speed line across the Pennines between Leeds and Manchester, but it is not the top priority for people in the north of England.

What people in the north of England want is an efficient network on the existing lines between their cities and towns. The geography of the north of England consists of a series of scattered towns and cities that need a network connecting them all, not just one line between one big city and another, which might perhaps stop at Bradford but nowhere else in between.

What we in the north of England urgently need as a priority is upgrading existing trans-Pennine routes, reopening Colne to Skipton to allow a new freight line as well as local services, reopening Woodhead to provide Sheffield and Manchester with a good service that way, and electrification of the substantial network. That is what we should be spending money on, not a short vanity project—it would not exist in the short term anyway; it would take 20 years—between Manchester and Leeds. The Bill, however, has my total support.

--- Later in debate ---
Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton
- Hansard - - - Excerpts

I would be delighted to meet the noble Baroness when diaries allow.

My noble friend Lord Framlingham mentioned fraud. I would like to be clear that neither the Serious Fraud Office nor the police has contacted HS2 regarding any investigation, nor made any request for information in that regard.

The noble Lord, Lord Greaves, asked whether HS2 was competent. The Oakervee review will of course look at how we have arrived at the place we have, and at whether HS2 as it stands is able to deliver the project. We would not want to prejudge that outcome, but we have been working closely with the new chairman to ensure that HS2 has the right skills at this important stage to take the project forward.

The noble Baroness, Lady Randerson, mentioned salaries, expressing surprise at the number of people who are paid quite high salaries within HS2. I do not know that I agree with her on this one. These are very technical positions, which need quite a lot of skill and experience, and I have not yet been able to see any benchmarks which would mean that they are not reasonable salaries to pay to these highly skilled technicians and engineers.

The noble Lord, Lord Tunnicliffe, raised the important issue of connectivity. I said in my opening remarks that HS2 will be able to connect the major cities of the UK, but also described how the hub-and-spoke system then goes out to more than 100 cities and towns, which will be able to benefit. It is probably slightly early days now to think about those towns, because we need to get closer to the date of completion and services. However, I agree with him that whoever is in government at that time—I very much hope that it will be the Conservatives—will work with local authorities to make sure that we have an integrated transport system so that the buses connect with the trains, and all those things happen that we all would like to see.

The issue of Old Oak Common was raised a couple of times. We published a response to the Economic Affairs Committee report in July 2019, which mentioned stopping at Old Oak Common. There are few benefits, because stopping there means that you cannot transfer on to other transport systems, but the Oakervee review will of course look at that issue.

Lord Greaves Portrait Lord Greaves
- Hansard - -

On the basic point about connectivity, will the Minister confirm that, when 2b is built, the trains will indeed run through to Preston, Carlisle and Glasgow?

Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton
- Hansard - - - Excerpts

I am unable to confirm that just at this moment, purely because I do not know, not because that decision has gone one way or the other. My apologies.

Oakervee is looking at the costs and benefits and, as the noble Lord mentioned, the costs have increased—the envelope was originally £55.7 billion, and Allan Cook now estimates that that is between £72 billion and £78 billion.

The noble Lord, Lord Teverson, asked about similar projects in other nations. It is difficult to compare us to someone else. We have very different countryside, and various stakeholders have very different needs. That point was raised by the noble Lord, Lord Snape. If we were to keep absolutely everybody happy on the environmental side of things, we would never build anything ever again. Clearly, that is not a feasible option, and therefore we must have a balance. While Oakervee will look at this, given our landscape and our need to mitigate against justified environmental concerns that have been raised, the cost of these things becomes quite high. I mentioned at the outset that there is a significant amount of tunnelling and cutting; some of that is down to the landscape that the line is going through, but also environmental concerns there. In later debates I will give examples of where we have literally moved the route to go around a tree. Those are the sorts of things that, with respect, may not necessarily happen in other countries. On the flip side, knowing France fairly well as I do, much of the country does not look like Staffordshire, so there are differences.