Kirsty Blackman
Main Page: Kirsty Blackman (Scottish National Party - Aberdeen North)(3 years, 1 month ago)
Public Bill CommitteesOrder. Mark, I am going to move on. There are two more people, and you have had a long time. I call Kirsty Blackman.
Q
Doug Parr: I think we need to really get a shift on with deploying renewables as fast as possible. I know it is said that we are already deploying them. Sure, but are we deploying them at the speed we need to? I think the answer is no. We need to get a move on with that. That in itself will not take up a lot of money but, as the previous conversation alluded to, there need to be alterations to the electrical system that allow that to be best accommodated. That is where some of the money goes.
We also need much greater interconnection with the continent, because that allows the flows to be balanced much more easily, and we definitely need a shedload of money going into making our buildings and appliances more efficient, because the best and most secure energy is the stuff that you do not need. Those can all be done at scale in the 2020s, so well before Sizewell will ever get going.
Professor Thomas: I do not think that you can possibly argue that nuclear is the best option to pursue. As Doug said, energy efficiency can be implemented very quickly, and it has the double pay-off that, whereas expensive new power sources will increase bills, energy efficiency measures will reduce both emissions and bills. It will have a welfare pay-off for low-income consumers as well as reducing our carbon emissions.
Mycle Schneider: Most of it has been said. We need to schedule priorities by availability and cost. The combination of time and cost together makes climate effectiveness.
Q
Doug Parr: I would not be, no.
Q
Doug Parr: Yes. I have always been very clear that there are particular hazards around new nuclear developments, whether it is waste, the terrorist threat, what to do with them or security issues. That is why I think, as a society, it is worth avoiding those hazards and, if necessary, paying a bit more. In practice, there are models out there by, for example, Imperial College that say that no more new nuclear is on the cost-effective pathway, given the cost of renewables. Theoretically, I can say that. In practice, I am not sure that is the situation we are facing.
Q
“to enable a final investment decision for a large-scale nuclear project in this Parliament, and the government remains in active negotiations with EDF over the Sizewell C project.”
What is your understanding of what that means and can you comment on potentially the use of that £1.7 billion as it relates to the RAB funding mechanism? It is a very different two sets of scenarios, if we are talking about whether that £1.7 billion is for a buy-out of the CGN minority stake or potentially put in as part of a pot of money alongside the funds generated from RAB.
Professor Thomas: If we go back to the 2016 agreement, CGN agreed to take a third of the Hinkley Point C project: the construction and the operation of the plant. It agreed to take 20% of the Sizewell B/C project up to final investment decision. It has an option to take 20% of the construction and operation of the plant if it goes ahead and for Bradwell, there is the 66% of CGN and 33% of EDF. EDF and CGN have spent about £0.5 billion developing the plans to the point they have reached so far. Let us say it is going to take another £0.5 billion to get to final investment decision—that is at the most. So £1.7 billion seems a bit too much for that. The wording of the £1.7 billion is very vague. Some people have assumed it will be an 8.5% stake, or whatever £1.7 billion works out as.
In terms of how you would get CGN out of Sizewell C, I think it is really dependent on what happens to Bradwell B. It is clear that CGN’s presence in the UK is for only two reasons. First, to build the Bradwell B plant, and the price for that is its involvement in Sizewell C and Hinkley Point C. The other is to get the British safety regulator’s endorsement of its technology. If it is not going to be allowed to build Bradwell B, I cannot see why on earth it would be interested in putting money into Sizewell C. It is not CGN’s technology, it would provide nothing and it would not be particularly profitable. So if Bradwell B is abandoned, the Sizewell C CGN problem will solve itself. Can you briefly repeat me the gist of the second part of your question?