Baroness Primarolo Portrait Madam Deputy Speaker (Dawn Primarolo)
- Hansard - - - Excerpts

Order. A large number of Members wish to participate in the debate. May I ask people to keep their comments a little more clipped so that we can facilitate as many people as possible? I cannot impose a time limit as we are on Report, but Members can watch the clock and appreciate that five to 10 minutes would be a good proxy as regards the length of their speeches.

John McDonnell Portrait John McDonnell (Hayes and Harlington) (Lab)
- Hansard - -

I shall try to be brief. I have tabled amendment 23 on the link between the network and Heathrow. Some hon. Members will understand that I have raised the issue on behalf of my constituents, as is my right, in each debate we have had on High Speed 2.

Let me briefly give the context. My background is in supporting rail expansion and investment. I represent a constituency with a railway estate and a large number of railway workers and, in addition, I chair the RMT trade union group in Parliament. We have been strongly behind the development of increased capacity and investment, so when the idea of high-speed rail was first proposed it was welcomed in my constituency for a number of reasons. One was that if we could get railway journeys below four hours, that would take pressure off Heathrow airport and reduce the need for short-haul flights into Heathrow. That assisted in our campaign against the expansion of Heathrow.

When the route was published, every Member south of Birmingham could assess its impact on their constituency, except me, because the link to Heathrow was not included. The route of the link to Old Oak Common was published, but then we were told that there would be a direct link at some stage, the options would be published, there would be a consultation, a preferred option would be considered, compensation arrangements for those affected would be discussed and then this House would make a considered decision.

There are real concerns about the environmental impact where the network hits the north of my borough. The right hon. Member for Uxbridge and South Ruislip (Sir John Randall) and the hon. Member for Ruislip, Northwood and Pinner (Mr Hurd) have valiantly argued the case for their constituents and achieved some tunnelling, but a lot more needs to be done. Other facilities that serve the whole borough will be affected, such as the Hillingdon outdoor activities centre, which will need to be relocated.

I am also concerned that my constituents now have no idea what impact the route will have on them because, following the introduction of the Davies commission, the whole timetable and consultation process for the link to Heathrow has been deferred until after the next general election, which means more years of blight for my constituents. That affects all of them, because nine different options for linking to Heathrow are being discussed, which means everyone’s home or business is under threat. That is no way to run a railway or consult on such a massive project. We were promised a logical process with a tight time scale. We were told that as the main network was decided, the routes would be published, there would be consultation on a preferred route, and a decision would be made relatively speedily, which would at least have given us some certainty. That has all gone now.

My hon. Friend the Member for Nottingham South (Lilian Greenwood) said that we do not want to put off any decision on high-speed rail until after the Davies commission reports. The solution, then, is simply to ensure that the commission reports earlier. The fact that it is due to report after the next general election is a political fudge to get everybody off the hook. In the coming six weeks the commission will report on a range of options, but there will be no final report until after the general election. Why is that length of time needed? All the experts, and indeed a number of Government Members, have been clear that the deadline could be brought forward so that we can have certainty about the Government’s preferred option before the next general election.

Andrew Bridgen Portrait Andrew Bridgen
- Hansard - - - Excerpts

I have great sympathy for the hon. Gentleman and his constituents facing the blight of uncertainty over possible routes for HS2 and the link to Heathrow. It is the same for my constituents in relation to the route for phase 2, which is out for consultation, and it could be changed, so huge swathes of my constituency and those of fellow Conservative Members are similarly blighted. To paraphrase, we are all in this together.

John McDonnell Portrait John McDonnell
- Hansard - -

I understand that, which is why I said that Members south of Birmingham know roughly what the route will be.

I was given promises and undertakings in this House about the process that would be followed to determine the route of the link to Heathrow. At least we thought we had some certainty on the time scale for the consultations. In fact, I was holding public meetings to go into some detail about the compensation arrangements for whatever option was to be proceeded with. Now it is all up in the air again and the route that the link will take is uncertain. The Government have opened discussions about a potential third runway at Heathrow. Sometimes Members can become paranoid in this House and think that they are coming for them.

Robert Flello Portrait Robert Flello
- Hansard - - - Excerpts

That is nature’s way of saying they are.

John McDonnell Portrait John McDonnell
- Hansard - -

I will not take it too personally.

Frankly, my constituents have had enough of political fudge after political fudge. What they want to know, and they want to know it soon, is where the line will go, how they will be affected, how we can cope with the social, environmental and economic consequences, and how they will be fully compensated.

Steve McCabe Portrait Steve McCabe
- Hansard - - - Excerpts

I have great sympathy with my hon. Friend’s predicament, but is not part of the problem that the Government are missing a trick? This uncertainty is allowing opposition to the whole project to develop. Were we to focus on reducing domestic air travel as part of the project’s value by tackling some of the uncertainty, that would help everybody.

John McDonnell Portrait John McDonnell
- Hansard - -

My hon. Friend the Member for Liverpool, Riverside (Mrs Ellman), who chairs the Transport Committee, has made the point time and again, with regard to the overall matter of strategic planning—with regard to aviation, I think that she and her Committee are absolutely clueless—[Interruption.] She knows that she has my respect and affection. If we are planning for transport infrastructure in the long term, we must ensure that it is integrated. The way to have integration for this project is by ensuring that the timetable set out for HS2 is integrated with the Davies commission’s report, which means having the report sooner. That could be within six months of the initial report being published this month. The decision could then be taken before the next general election. It is also about being more honest with the electorate on rail and aviation, and not only in my constituency, but nationally.

Rehman Chishti Portrait Rehman Chishti
- Hansard - - - Excerpts

In relation to the hon. Gentleman’s comments on the Transport Committee, in an earlier debate on aviation he said that it keeps coming back with the proposed expansion of Heathrow, which he disagrees with. If it keeps coming back with that in different guises and compositions, clearly that shows that it must be right.

John McDonnell Portrait John McDonnell
- Hansard - -

It shows a consistent aberration of judgment, because time and again Governments eventually say no.

I appeal to the Secretary of State. There is a solution to my constituency problems and those of the right hon. Member for Uxbridge and South Ruislip. First, we must address the environmental damage that is still being threatened in the north of my borough. The right hon. Gentleman and the hon. Member for Ruislip, Northwood and Pinner have a series of requests that could readily be met to overcome some of the environmental and social damage.

Secondly, please give us certainty. That means having the Davies commission’s final report sooner, which could be done early next year, and integrating it with the final decision on the link to Heathrow, giving a properly planned process in which people can have confidence. Otherwise, I will take every opportunity I can to vote against high-speed rail until my constituents are satisfied that their views have been taken into account.

Karen Lumley Portrait Karen Lumley
- Hansard - - - Excerpts

I rise to support amendment 17 and will speak extremely briefly. My views on HS2 are fairly widely known, but I want to place on the record that the project is needed now. The west coast main line is nearly full, and as a regular traveller on that service I know that it is essential for many commuters. HS2 is about capacity as well as speed, a fact that is sometimes lost in the argument. I totally understand where those of my colleagues who oppose it are coming from, as there are also strong views in my constituency, but I firmly believe that it is of huge national importance and must go ahead. In my region, the west midlands, we cannot ignore the facts: a £1.5 billion increase in economic output, thousands of additional jobs and increased wages.