Debates between John Howell and Darren Jones during the 2017-2019 Parliament

Waste Processing Facilities: Local Environment

Debate between John Howell and Darren Jones
Wednesday 23rd October 2019

(4 years, 6 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Darren Jones Portrait Darren Jones
- Hansard - - - Excerpts

I do agree. I thank my hon. Friend for her intervention and for her Adjournment debate on the Floor of the House, which I referenced in my letter to the then Environment Secretary, not least because the Government had promised to bring forward some regulations. To be fair, they had done that, but those measures evidently have not been able to solve the types of issues that my hon. Friend and I have to try to tackle in our constituencies.

This is a very lived matter for us locally. My constituents will make complaints to the Environment Agency, to the council, to me and to others, and often there seems to be something that falls between the cracks. If it is not a major, significant issue that the Environment Agency can tackle, Bristol City Council might rightly not be able to tackle it, and constituents then feel that they have nowhere to go and nothing happens. This is the frustration that many of my constituents face.

Even when actual breaches can be demonstrated, an individual instance in itself needs to be sufficiently big for action to be taken. With regard to Bristol North West, Avonmouth historically was land associated with a stately home in the constituency. Its owner built the village very close to industry, essentially for workers, but that has meant that we have an unusual situation—it may not arise in other parts of the country—in which people are living very close to the processing that is taking place. My conclusion as the local MP is that there seems to be just too much processing of waste, by too many facilities, too close together and too close to local residents.

I wrote to the Department about assessing the cumulative impact—not just the individual impact of a particular site or planning permission—with proper sight of how permits are monitored, managed and enforced as well as the impact on the community. The Environment Agency should have greater flexibility to raise minimum standards for the approval and renewal of permits as part of the lifecycle, taking an evidence-led area-wide view in setting conditions on the types and quantities of waste that can be handled, the processes taking place on site and the acceptable means of storage. For us, that might mean in lived experience that less rubbish needs to be processed at any one time, and perhaps fewer bundles may be stored on local sites. Perhaps bundles should be stored in closed, maintained facilities, not in open-air environments.

At present, operators are required to demonstrate how they will seek to minimise and mitigate negative consequences that attach to their work by submitting a written management plan. In affected areas, applicants and existing operators should be subject to more exacting requirements to explain how their processes adhere to the Environment Agency’s guidance on fly management, and such processes should be frequently inspected to ensure that they are delivered on a day-to-day basis.

As things stand, the only avenue for dealing with the problem is through identifying significant rule-breakers. Therefore, even in the best-case scenario, there is slow, piecemeal progress and no resolution to the issue. My constituents are clear that that is not good enough. The Environment Agency needs to be able to draw on a framework for assessing cumulative impact and have the teeth and the flexibility to take action to deal with that impact.

John Howell Portrait John Howell (Henley) (Con)
- Hansard - -

I am listening carefully to the hon. Gentleman. In my area, the recycling centres are all enclosed in buildings. Does he not think that the planning system is a better means for controlling this problem?

Darren Jones Portrait Darren Jones
- Hansard - - - Excerpts

I thank the hon. Gentleman for his intervention. That is part of the puzzle. National and local planning frameworks should better reflect some of these issues when decisions are being taken. For example, a number of early planning decisions were granted by Bristol City Council, but the previous two applications were rejected locally only to be overturned by the national planning authorities, not having taken into account the proper representations made by local councillors about the cumulative impact. We therefore need improvements to the planning process as well as to the rules and the Environment Agency’s ability to take action.