(10 months, 4 weeks ago)
Commons ChamberI am grateful to my hon. Friend not just for her question, which gives us only a few seconds to talk about the matter, but for her Adjournment debate a few days ago, when we had a much longer period to talk about it. She makes a very important point; I know how important it is to colleagues in the south-east and elsewhere and, although I am not able to give her a date today, I hope to have more on that very soon.
I welcome what the Minister says on the importance of neighbourhood plans, on agricultural land and on brownfield development. Can he clarify what the consequences are if a district council has already embarked on a consultation on a local plan but, having studied the NPPF in detail, sees stuff there that it wants to embrace and chooses to adopt elements of the NPPF, which then leads to a consequential delay?
There is a long section at the end of the revised NPPF that explains the arrangements for councils that are in the process. We are trying to strike a delicate balance, ensuring that councils go through that process to the extent that they are able to, while recognising that those in an earlier part of the process may want to consider some of the changes. It generally is the case, if I recall correctly, that when councils have passed the regulation 19 stage—the second consultation—there is a greater expectation that they will stay in the process. It is ultimately for them to make their own judgments, but the Government will be watching the result.
(11 months, 1 week ago)
Commons ChamberI think we responded to a written question on this matter just a few months ago, but I am happy to meet the hon. Lady to talk about it in more detail, if there still is a problem. I am not aware of one at the moment.
Horsham is suffering severe water stress and is subject to water neutrality. Does the Minister agree that mitigations should be thorough, evidenced and monitored?
I absolutely agree. Water neutrality is impacting on small parts of the country, but it needs to be dealt with seriously and proportionately by statutory consultees, and then with a can-do attitude from councils where appropriate.
(5 years, 9 months ago)
Commons ChamberWe now come to motion 4 on private Members’ Bills.
On a point of order, Madam Deputy Speaker. That motion would have given us some certainty that this House would be sitting on Friday week, for example, to consider private Members’ Bills. Is it not extraordinary that we now have no certainty about that? The presumption now is that we will not be sitting on Friday 1 February. At one stage we were told that we would be sitting on Friday 25 January. My point of order relates to the amendment that I tabled to the business in motion 4. Prior to hearing that the motion was not going to be moved, I sought to find out whether my amendment had been selected. It is the convention of this House that if someone has tabled an amendment, they get advance notice prior to the debate as to whether it has been selected. We often get printed papers telling us which amendments have been selected and in what order. Can you tell us, Madam Deputy Speaker, whether my amendment and/or the one tabled in the name of the Labour environment spokesman, amendment (b), were selected for debate, subject of course to the debate starting at the behest of the Government? The other point I would like to make is to ask whether I am correct in saying that the only way in which we can avoid this sort of scenario is for Back Benchers on both sides to sign Government motions so that they cannot be withdrawn?
(6 years, 4 months ago)
Commons ChamberUrgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.
Each Urgent Question requires a Government Minister to give a response on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Our focus in the Department is on securing the greatest passenger benefits in a tax-efficient and value-for-money way. It was found that electrifying the route between Cardiff and Swansea would provide poor value for money and little by way of incremental time savings to passengers. It would not bring the significant journey time savings we would expect for such an expenditure and would result in significant disruption for passengers on the line.
I welcome the Minister’s commitment on compensation to my right hon. Friend the Member for Arundel and South Downs (Nick Herbert), which will benefit our constituents. May I draw his attention to the problem of short-formed trains? Too often, fewer trains are coming into crowded platforms and they are short-formed, which forces passengers to pack themselves into trains that are far too small and in sweltering conditions. If GTR gets nothing else right, can it please sort that out in the coming weeks?
Indeed, that is one element we will look at as we assess whether GTR has managed to stabilise services following the introduction of the new interim timetable on 15 July.
(6 years, 4 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I beg to move,
That this House has considered rail services in Hassocks.
I welcome the opportunity to raise the subject of the rail services provided for villagers in Hassocks in my constituency, and for others who use the station there, which is on the Brighton main line and which offers Southern, Thameslink and Gatwick Express services. Hon. Members may wonder why I am talking about rail services to a village. Although it has a population of only 7,700 people—making it the largest settlement in my constituency—Hassocks is nevertheless the 10th busiest rail station in west Sussex and is used by many people who do not live in Hassocks itself. It is a commuter village.
Many people move to Hassocks specifically because of the rail links that it provides to London and other places. In fact, 1.3 million passengers a year use Hassocks station. Therefore, my first and key point—I know that my hon. Friend the Minister has taken it on board, because he very generously met me to discuss this issue before the new timetable was introduced last month—is that this is not a small issue. A large number of people use the rail service from Hassocks in my constituency, and the Minister knows that they are very angry indeed. They have put up with two years of disruption because of the problems with the Southern service and the London Bridge upgrade. They fully accept that the London Bridge upgrade will ultimately be of benefit to passengers, but they are certainly not seeing that at the moment. Just as it looked as though we might be moving towards a steadier state for rail services in West Sussex, which over the past two years have been absolutely dismal, we have serious disruption again.
This all started with the introduction of the new timetable last month. I should say straightaway that I fully appreciate that the new timetable provides more peak trains to Victoria from Hassocks and the same number to and from London Bridge—theoretically; I will come to the actuality shortly. Theoretically there are more such services, but—here is the “but”—there are no longer any direct services to Clapham Junction, the busiest rail station in Europe, from Hassocks. Despite the size of the village and the numbers of people commuting from there, the direct services to Clapham Junction have simply been withdrawn, and I am talking not about the disrupted timetable, but about the new timetable, which was meant to offer an improved service to everyone.
Four peak-time morning trains to Clapham Junction have been removed, and Govia Thameslink Railway admits that three of those journeys will now be slower by up to 10 minutes because of the need for my constituents to change services. Six peak-time return trains from Clapham Junction to Hassocks have been removed, and GTR admits that four of the journeys will be slower by up to 10 minutes. GTR has told me that it appreciates that
“passengers will need to change trains,”
but
“the journey time is only increasing by an average of 7 minutes.”
Commuters dispute that: they say that changes at Gatwick or East Croydon are rarely quick or easy, because of overcrowding. I know that GTR is giving figures based on a four-minute change time at Gatwick. I defy the Minister, GTR executives or anyone else reliably to be able to change at Gatwick at peak time, even if the trains were operating properly, based on only a four-minute window.
I am most grateful to my right hon. Friend for the work that he is doing. Many of us in West Sussex are working together on this; it is a huge problem across the county. On his particular point about a changeover time of four minutes and with crowded platforms and mass disruption, commuters in my constituency are very concerned about the safety aspect. I am sure that that is a concern for his commuters as well.
I am grateful for my hon. Friend’s intervention. We have indeed been working together in West Sussex and we have been working closely with our right hon. Friend the Member for Mid Sussex (Sir Nicholas Soames), who is also very concerned about the disruption to services on the line. We are all concerned about the unfeasible interchange times and the safety implications, the implications for disabled passengers and so on. It is no good producing figures that show a theoretical benefit or not much of a change or not much of a problem for commuters, because of course it is actually very disruptive for people to have to change when they had a direct service before. These are busy working people. They often cannot get a seat once when they have changed. Their working patterns are disrupted, and they are just very irritated by the claim that somehow the service is nearly as good as it was before. It really is not.
There is a mismatch between demand and train routes. Gatwick Express trains, which stop only at Victoria, are relatively empty, whereas Thameslink trains have been severely overcrowded. I have raised before with the Minister whether it makes sense for Gatwick Express trains not to stop at the busiest station in Europe, Clapham Junction. If they did, that would offer more choice to people flying to and from Gatwick. The demand that those trains run direct from Gatwick to Victoria is problematic anyway, but it is certainly disadvantaging my constituents at the moment.
The Minister will tell me that only 9% of journeys in relation to Hassocks are to, from or through Clapham Junction. It sounds like very few when we hear that only 9% of my commuting constituents are affected, but actually it is 9% of a large number. It is 9.45%, to be precise, of the nearly 595,000 journeys that are being made to London. That means that more than 56,000 single journeys a year from Hassocks to Clapham Junction, in either direction, have now been withdrawn, in terms of the direct service, so that is not a small impact. It is impacting on the village, and people are very upset about it. Hassocks is a growing village—the number of houses will increase by one third in Hassocks alone, never mind the surrounding area—so to pick on one of the biggest stations in West Sussex and withdraw entirely the direct service to Clapham Junction simply does not make sense. I would therefore be very grateful if I could repeat to the Minister the request that I have made to him, to my right hon. Friend the Secretary of State, to GTR and to Network Rail, in so far as it is a matter for that organisation: will they please reconsider the new timetable, which has withdrawn what was an essential service for a large number of my constituents?
All this would be one thing, and I might not even have raised it in this Chamber, if it were not for the fact that these are theoretical new services anyway, because the disruption that has resulted from the new timetable has worsened the service not just for the commuters who have seen their service withdrawn, but for hundreds—no, thousands—of others. Frankly, the service since the introduction of the new timetable has been completely intolerable. I said at the beginning of the debate that my constituents were angry about it—they really are angry. This disruption is happening on a daily basis. It is deeply ironic that before the new timetable was introduced, GTR told me:
“We hope that with the introduction of this timetable, we will be in a position to provide…much more reliable services for all passengers travelling on our network.”
That would produce a very hollow laugh indeed from my constituents. The Minister knows that there has been widespread withdrawal, cancellation and delay of services.
The important thing for the Minister to note is that the situation is not getting better; in fact, it is just as bad as it was when the new timetable was first introduced. In the week before the timetable change, to 19 May, there were 18 train cancellations. That was a “normal” service. “Normal” service in West Sussex appeared to mean that my commuters had to accept that level of cancellations. Can people imagine an airline being run on the same basis? But never mind; there were “just” 18 cancellations in that week. In the first week of the new timetable, 245 trains were cancelled, and I am talking about trains to and from Hassocks. In the second week, there were 267 cancellations, in the third week 312 and in the fourth week 290. We are now in the fifth week and still nearly 300 trains a week are being cancelled. Might we have expected that after one month of the new interim timetable, which is resulting in services being withdrawn altogether, there might be some improvement? I am afraid not.
On Monday morning I received an email from a despairing constituent, Mr James Read, who lives in Hurstpierpoint. He said:
“I feel I must write to express my dismay at the current situation which appears to somehow deteriorate further everyday. This morning for example, I have never seen so many people waiting for a London train on the platforms at Hassocks. This morning, the 0623 was virtually full before it reached Hassocks. Then there were additional stops at Hayward’s Heath and Three Bridges to compound matters. It is totally unacceptable for people to be standing on a train service at 0630!”
I agree with that. I have a simple question for the Minister: when will this shambles come to an end? We are now four weeks on and it continues to be appalling.
I have here a timetable for rail services from Brighton and Hassocks in 1905, well over a century ago. The fastest of three direct trains from Hassocks to London Bridge took just one hour and 17 minutes. Those were steam trains. Theoretically, we now have direct services from Hassocks to London Bridge that are 23 minutes faster, but the reality is that we have a completely unreliable service. My constituents would be grateful to be transported back to the days of 1905, when they had three reliable steam trains that took them to London every single morning, compared to the chaotic, shambolic, disrupted, withdrawn and cancelled services that they are facing now.
What will be done about this? There is the issue of redress. I am grateful to GTR for at last recognising that tickets that are valid on one of the services should be passported to the others. I specifically asked for that and am grateful that it has been introduced. If a passenger has a ticket for a Southern service that is cancelled, they should be allowed to use it on a Thameslink or Gatwick Express service, or whichever service is available.
Then there is the issue of compensation. Of course, we must compensate passengers, but the compensation system is simply not good enough. It is not direct enough, immediate enough or sharp enough. It is too complicated for constituents to use. It just increases their irritation even more. We need a modern, sharper form of compensation system that is better than delay repay, so that the rail operating companies feel real pain when they are providing a shambolic and shoddy service like this, and passengers are compensated on a much more immediate basis. We need that not just because it would be fair to customers, but because it would introduce greater accountability.
Who will be accountable for this shambles? We have seen the resignation of Charles Horton, the chief executive of GTR, but what about Network Rail’s responsibility for this matter? It has admitted that it has some responsibility for the problems with Thameslink services, because of its failure to deliver in the north, which meant that it did not have enough staff to manage the new timetable. GTR says that one of the reasons it was in such trouble is that it was not given enough time to introduce the new timetable. The blame game is being played a lot. Who is being held accountable at Network Rail for this shambles? Yes, other projects may have been delivered on time and London Bridge might be wonderful, but that is not the point. My constituents want to know that people are being held accountable for these problems, so that they will not happen again.
Those were unforced errors, frankly. This is not the same situation as we are seeing in the north with union disruption. It is not the same as the situation over the last two years with the disruption to Southern services, which, we all came to realise, were largely driven by the unions manipulating problems that already existed with the lack of track because of the London Bridge upgrade and the shortage of drivers. There were other responsibilities, but the unions were driving it particularly. That is not the case with these Thameslink services now. We cannot lay the blame at the door of the unions for this. The blame has to be laid with the managers, whether in Network Rail, GTR or the Department for Transport, who presided over this shambles.
Why was there not an early warning system or risk register? Why were red lights not flashing, because this was a major change and could result in problems? We were still being told right up to the introduction of the new timetable that it might have minor teething problems, but it would be all right on the night. I am afraid it has not been all right on the night. We have to learn the lessons. I know that there will be an inquiry into that.
I am being placed—as my hon. Friends are—in a position where we are constantly having to apologise for the performance of the rail industry in our constituencies. It is difficult to explain to our constituents why more drastic action has not been taken to deal with this franchise.
My right hon. Friend is absolutely right. He is making a speech of great passion and he is spot on with every point. As he knows, we are facing the same issue in Balcombe. I have discussed it with the Minister before. Balcombe is a small village with a huge number of commuters who come into it. They pay a fortune every year in order to get to and from London. The least they can expect is to be able to do so reliably.
I like my right hon. Friend’s tone. Does he agree that an inquiry is one thing, but we simply need to know when these drivers will be trained and when the timetable will be working? Those are two simple questions, to which we need to have the answers as soon as they can be provided.
I agree with my hon. Friend. He has made the point directly, and I am sure the Minister will have heard it.
We will have to look at the size of this franchise again. It is too big. It was meant to deliver benefits in economies of scale, but it has only given us problems from the moment that it was introduced. We also need to look at the franchise holder. I appreciate that that is a legal process, but my constituents cannot understand why GTR is still running this franchise. There are longer term questions about the level of investment necessary in these lines. Hon. Members representing West Sussex constituencies will be very supportive of an increased level of investment, but that does not deal with the short-term issues.
In conclusion, my constituents in Hassocks are paying in excess of £5,000 a year for their season tickets. They rely on these rail services. I would, therefore, be grateful if the Minister would, first, look again at the question of whether direct services to Clapham Junction from Hassocks can be restored and, secondly, if he can tell us when normal, reliable services are likely to be restored.
I am grateful to the Minister for his attention to these problems, and I know how hard he has been working on them. His door has been open to us, and he has been receptive to the points we have been making. I certainly attach no blame to him or his colleagues. He has been badly let down indeed. I am sorry to address him in such tones, but it is important that I do so, because it is important for him to understand just how angry our constituents are now about this perpetually bad service and how despairing they are that there seems to be no end to it. They just want a normal, reliable rail service. In the 21st century, is that really too much to ask?
Indeed. I prefaced all my comments by saying that this was about what would happen once we are over this hump—the current difficulties—and once the timetable is fully bedded in and working to the levels that it should. Of course my right hon. Friend is right and I repeat what I said earlier: there has been improvement, as I hope he acknowledges, but there is significant room for further improvement, so that services are of the standard that his constituents and those of my hon. Friend the Member for Horsham have a right to expect.
On average, the journey times for trains into Victoria from Hassocks will be reduced by 10 minutes in the morning, when the service is operating at the level it should be operating at.
I appreciate that there is an ongoing inquiry. Will my hon. Friend confirm whether this situation is attributable purely to the retraining of the drivers, so that when that training is concluded the new timetable will operate properly, or are there other issues to be got to grips with as well? As I say, I appreciate that there is an inquiry ongoing, but I would be most grateful for any light that he can throw on this situation.
Yes, the sheer magnitude of the timetable change affecting GTR, which is one of the biggest changes that the railway industry has ever seen, and the late delivery of the timetable as a consequence have meant that GTR was substantially behind where it should have been on driver training and on getting in place all the appropriate train diagrams. That driver training and reorganisation work, which should have been completed in time for 20 May, is now being done at pace. Once that has worked its way through, we anticipate being able to move progressively back to the full May timetable.
There are the same number of services going from Hassocks to London Bridge as there were before the timetable change. I grant that for a temporary period Hassocks will receive fewer peak services to Blackfriars compared with the situation before the timetable change. However, that is a temporary result of the rephasing of the timetable and this route will receive an extra service each hour from December this year. Average journey times to Blackfriars and London Bridge are now between five and 10 minutes shorter than before, providing passengers with quicker direct access to London Bridge, Blackfriars, the City, Farringdon and St Pancras.
The new Thameslink service also offers passengers different options for getting to their final station. For example, people who interchange at Clapham Junction for Waterloo will instead be able to interchange at London Bridge for Waterloo East. The opening of the Elizabeth line through Farringdon in December will offer further journey opportunities.
My right hon. Friend the Member for Arundel and South Downs mentioned compensation. As ever, passengers are encouraged to apply to their train operator for delay repay compensation for affected journeys. We are seeing increased take-up of that compensation, as awareness of it and the ease with which people can access it grow. We have also announced a special compensation scheme for GTR passengers. It is to be funded by the rail industry and it will ensure that regular rail customers receive appropriate redress for the disruption they have experienced. I encourage passengers to apply to GTR for delay repay compensation. GTR operates the scheme for all of its passengers and under it passengers can claim compensation for each delay of more than 15 minutes, whatever the cause of the delay.
I conclude by thanking my right hon. Friend for bringing this subject to Westminster Hall. It is an important subject and it is absolutely right that his constituents get the services they deserve as rapidly as possible. I remind the House that in time the vast majority of passengers will end up being well served by this timetable change, once it has bedded in. Those travelling to Victoria from Hassocks will have an extra five additional services during the morning peak; for those travelling on Thameslink, journey times will be between five and 10 minutes quicker than before. In time, I hope that he will agree that rail services into Hassocks will be much improved once those services are fully bedded in.
(6 years, 6 months ago)
Commons ChamberI congratulate my hon. Friend the Member for Hitchin and Harpenden (Bim Afolami) on securing this debate, which follows on from our conversations in meetings we held on 22 March.
I begin with the specific issue of the changes to the timetable. Harpenden is on the midland main line, which runs from London to Nottingham and Sheffield and, as Members know, is undergoing its largest upgrade since it was built in the 19th century. The upgrade is necessary and urgent, as the number of passenger journeys taken on Britain’s rail network has doubled in the past 20 years. As part of the upgrade, a fourth track is being built north of Bedford to Kettering and will provide space for an additional train path from December 2020. Unfortunately, to allow the works to take place, some difficult decisions have had to be taken.
East Midlands Trains fast peak-time services will not call at Bedford or Luton from May 2018 to December 2020. Instead, displaced East Midlands Trains passengers from Bedford and Luton will be able to travel on fast Thameslink services, which will not stop at Harpenden. In answer to my hon. Friend’s first question, the decision was made in November 2017, once the industry had exhausted all alternative options.
Obviously, I completely understand the concerns of commuters from my hon. Friend’s constituency. However, steps have been taken so that, despite the unavoidable loss of two fast peak services, overall the capacity from Harpenden in the morning will be roughly the same as today, with only four fewer carriages across the entire three-hour morning peak. There will be an increase in capacity during the evening peak, with an additional 20 carriages bringing an additional 1,242 seats. In addition, it is expected that most Bedford commuters will opt to take the fast Thameslink services, rather than those that stop at Harpenden. It is possible that that will reduce, rather than increase, crowding on Harpenden services.
My hon. Friend raises the issue of St Albans City station, which requires a capacity increase because, as he acknowledges, it carries twice as many passengers as Harpenden and already has issues of its own with crowding on platforms. On the potential for engineering works in Kent to delay the improvements to Harpenden, these are minor works and are currently on schedule to be completed on time. There is minimal risk to passengers from Harpenden.
From December 2018, an additional service will be scheduled in both the morning and evening peaks, and two trains will be lengthened from eight to 12 carriages. That will provide a capacity increase in both peaks. From December 2020, when the upgrade to the midland main line is complete, Thameslink will reinstate the fast services that have been withdrawn and will add four more 12-car peak services at Harpenden, resulting in an additional two fast 12-car trains per hour compared with the May timetable. That will provide a substantially improved service for Harpenden commuters.
I apologise again to my hon. Friend as the full benefits of the Thameslink programme will be delayed for commuters from his constituency. In the context of the major engineering works necessary to bring the midland main line into the 21st century, this was the best available solution. We should also not lose sight of the many benefits the Thameslink programme will bring to passengers from Harpenden and the wider Thameslink network: new trains; more reliable journeys; and a substantial increase in capacity from 2020.
My hon. Friend mentioned the problems with consultation, which, again, we have discussed extensively in our previous meetings. I would like to emphasise that ahead of this timetable change Thameslink has carried out one of the largest and, in some ways, most effective consultations we have ever seen on the railways. In fact, as a result of these consultations, Thameslink has made hundreds of changes to its plans.
May I endorse what the Minister has just said, in that we see a net benefit in my constituency from the changes to the timetable and I have encountered constituents who are very impressed with changes that have been made as a result of the consultation? However, like my hon. Friend the Member for Hitchin and Harpenden (Bim Afolami), one station, in particular, in my constituency is losing services during that critical peak time, when people need to get into London to work. In addition to dealing with the questions he has been asked, will the Minister assure the House that this issue will continue to be kept under review and we will be able to look at it again when we see the full import of the timetable and its impact on our commuters?
I thank my hon. Friend for bringing to our attention the issues faced by his constituents, particularly at Balcombe station. There will be further opportunities to lobby for changes to the timetable at the next iteration; May’s is obviously set in stone, but there will always be a December timetable and subsequent timetables, so these things are not set in stone. This has been one of the biggest timetabling changes the network has ever seen and, understandably, not everything is going to satisfy everybody at every moment in time.
(6 years, 8 months ago)
Commons ChamberWith respect to the hon. Gentleman, the issue of leaseholders and what can and cannot be done is fast changing. As he may know, a legal case was waiting to be heard and was only concluded a couple of days ago, and as I said earlier, we are studying the outcome. On his point about getting people together, we are in the process of setting up a roundtable with several interested parties, including representatives of leaseholders, which I think will help.
I commend my right hon. Friend for swiftly updating the House. Many of our citizens are deeply concerned about fire risk and—I am afraid—sceptical of statements made by Governments of any colour. Will he remind the House of the quality and strength of the panel advising him on these important issues?
Yes, I am very happy to do that. The expert panel is chaired by Sir Ken Knight, the former London fire commissioner and the Government’s former chief fire and rescue adviser. Also on the panel are Dr Peter Bonfield, chief executive of the Building Research Establishment, Mr Roy Wilsher, chair of the National Fire Chiefs Council, and Miss Ann Bentley, global director of a leading construction company and a member of the Construction Leadership Council.
(6 years, 8 months ago)
Commons ChamberNotwithstanding the weather, the House should be basking in the warm glow of success, at least as regards productivity. I am delighted to say that, just at the point when the Office for Budget Responsibility threw in the towel and gave up, we embarked on the first period of sustained improvement in productivity for seven years. Maintaining that is critical, and, as has been agreed on both sides of the House, part of the answer is improvement in our infrastructure.
I am delighted that we have more than £460 billion in the pipeline for infrastructure investments, and over half of that will be coming from the private sector. I sincerely hope that part of it—I beg to differ from the hon. Member for Brentford and Isleworth (Ruth Cadbury) here—will be the expansion of Heathrow; we have talked about that enough and we need to get on with it, but I will not go further into the debate on that with the hon. Lady, given the time limit today. I am pleased that since the financial crisis we have, notwithstanding the other pressures, maintained the investment in our infrastructure, which has exceeded in terms of GDP percentage that of France and Germany over the period.
I listened carefully to the proposer of the motion, the hon. Member for Kingston upon Hull North (Diana Johnson), and I agree that this is a national challenge. I went through the details of this, and I warmly welcome the TransPennine route upgrade, think it is a smart move to make smart motorways of the M60, M62 and M6, and, burrowing into the detail, support the £100 million being spent on the Tees Valley A19. What will please the hon. Member for Brentford and Isleworth is the £14 million being spent on cycle lanes in Gateshead and Newcastle. Those are all examples, both very small and very large, of the Government acting to ensure we boost our productivity and make this a better place to live across the country.
Above all, the establishment by this Government, with £260 million of funding, of Transport for the North is a good move; it will create proper and good national advocacy through that body. One might wonder why I am saying that as a Member for a Sussex constituency; I do so because it serves the interests of Horsham and the whole of the country if our economy and our growth are broadly based.
I am pleased to represent a constituency in one of the most productive parts of the country, however, and, while we recognise the need to have growth across the country, we must also recognise the need for that most productive part of the economy, London and the south-east, to continue to succeed, and for that engine to keep humming. That, too, is in the national interest.
My right hon. Friend the Member for Devizes (Claire Perry) said, when she was rail Minister, that the best way to get the country’s productivity going was to make certain that Southern rail worked. She was right then, and it is still true now. We have for too long neglected infrastructure expenditure on our commuter lines in the south-east.
I had two key points to make. One was about digital railways, which has been amply and brilliantly made by my right hon. Friend the Member for Wokingham (John Redwood), so I do not need to wax lyrical on that in the minute remaining to me. But I must refer again to Southern rail. I welcome the investment going into London Bridge and the Balcombe tunnel, which has been there since 1840 and is used daily by Thameslink. I would welcome that as part of an ongoing programme proposed by the Brighton Mainline Alliance, which I sincerely hope it will force through. We must upgrade Windmill Bridge junction and develop East Croydon station. That alone would lead to £6 billion of improvement to the national economy, if we can get our lines working correctly through the Southern region. I say to the Minister that as part of this we need extra station capacity between Horsham and Crawley; I look forward to renewing my conversations with him in the future. Being able to help other Members is always an aspiration of mine. With that, I conclude my remarks.