Commons ChamberLet me begin by thanking the hon. Member for North East Fife (Wendy Chamberlain) for raising this important issue. I know from correspondence how keen she is to support the interests of her constituency, and it is a pleasure to respond.
I recognise that the status of the planning application for a wind farm at Kenly is matter of concern for her, the University of St Andrews and her constituents. We certainly share her desire for a swift and amicable resolution to an issue that, as the hon. Lady said, has become far too protracted. She paid tribute to the staunch work of the University of St Andrews and its ambitious plans to achieve net zero emissions by 2035. I would very much like to echo those remarks.
The impressive measures that the university has already taken to do that include using modern technology to drive energy efficiency and its Eden campus project. Since 2018, as I understand it, a 20% reduction in the university’s carbon footprint has already been delivered through solar energy and biomass heat. The Government share St Andrews’ enthusiasm to reduce carbon emissions, introducing our legally binding target of net zero by 2050 and working towards what we all—including the hon. Lady—hope will be a successful conclusion to COP26 in Glasgow later this year.
In the integrated review, the Government set out how climate change was our No. 1 international priority. We in Defence are determined to play our part in achieving the UK’s ambitions. In our climate change and sustainability strategic approach, which the hon. Lady was kind enough to refer to and which we published in March, we set out how our approach to sustainable procurement, carbon reduction and better utilisation of our estate can help to deliver results even as we learn to adapt and operate in increasingly unforgiving theatres. At President Biden’s recently inaugurated discussions on climate change, at which the Secretary of State spoke, the US Defence Secretarty, Lloyd Austin, commented that UK defence had “raised the bar” on climate change as an issue. We certainly hope to continue to do so.
We recognise the vital importance of renewable energy in helping us to meet our goals. Within the defence estate, we recently announced a £120 million project to deliver four solar farms over the next five to seven years, resulting in £1 billion in energy-efficiency savings and reducing emissions by 2,000 tonnes of carbon dioxide equivalent. The use of wind energy on the estate is very much an option to which Defence is open, where it is viable and consistent with training.
The Government are delighted to have seen the increase in the use of wind and solar energy, which now account for such a substantial proportion of total UK electricity generation. However, the very welcome expansion in wind farms has had to be monitored, and continues to be, for the impact on radar and, in particular, on civil and military air traffic control. We have a duty to protect the security and wellbeing of the people of the United Kingdom. That requires us to be able to use radar effectively to monitor our airspace where required. There is in particular a vital task of ensuring, as I say, that air traffic control has clear line of sight to help air traffic, its passengers and crew to land safely.
Many wind farms have been able to proceed, after consideration, without issue; however, we have also been keen to support the sector to find solutions that can enable further projects to go ahead. The Royal Air Force, in partnership with the Offshore Wind Industry Council, has formed a joint taskforce to develop radar mitigations. The hon. Lady is right that it focuses particularly on offshore wind and air defence radar, because that is where the greatest capacity can be released to achieve our important renewable energy targets. We also expect the lessons that we learn to be applicable, and more useful, in a wider context, including onshore.
Last year, the RAF, the UK Defence and Security Accelerator and the Department for Business, Energy and Industrial Strategy ran a competition to seek new technological solutions to mitigate the impact of offshore wind turbines on air defence systems. That included ways to reduce radar clutter caused by wind farms, improvements to the probability of intruder detection, the capability to fill or remove gaps in radar coverage, alternatives to radar and alterations to the design of the wind turbines.
In the first phase, DASA awarded contracts to Thales, QinetiQ, Saab, TWI and Plextek DTS to fast-track their ideas for technologies that can mitigate the impact of wind farms on the UK’s air defence radar system. Phase 2 of the competition has just closed and the winners will be announced on 8 August. I therefore assure the hon. Lady that the Ministry of Defence is keen to see the opportunities presented by wind farms expanded and, what is more, is working creatively and with the active participation of the sector, which I would like to acknowledge, to find mitigations that work and that will allow further expansion.
Having laid out the context, I turn to the specifics of Kenly, and St Andrews’ plan to build six wind turbines, capable of generating 12.3 MW of electricity and saving over 9,000 tonnes of carbon dioxide per year. The unfortunate reality, as the hon. Lady recognises, is that the project is just eight miles from the air traffic control radar at Leuchars Station. That is why, back in 2011, the MOD was involved in the initial planning process and undertook a thorough technical and operational assessment. The findings were clear: the turbines, as the proposals stood, would cause an unacceptable impact upon the air traffic control radar. Not only could they be mistaken for aircraft, but they could cause confusing radar clutter.
We cannot afford to take a risk that could put lives at risk, but to be clear, we did not rule out the proposal. Instead, we agreed with the developer that the project could go ahead as long as they provided an appropriate radar mitigation scheme before the turbines were erected. To assist developers we have a clear approach to such schemes based on a three-phase model: the identification of potential technical solutions, the trialling of preferred technical solutions, and the implementation of the technical solution.
I appreciate that the developer has made a number of attempts to proffer mitigation for the wind farm. Two such attempts involved an infill radar solution based on Edinburgh airport air traffic control radar. Those attempts were unsuccessful for various reasons, including that the proposal would have resulted in the loss of radar for an important area in the approach to the station below 900 feet, which would have presented a significant safety risk. There were also concerns about the ability to achieve seamless integration between the Edinburgh and Leuchars radars.
I do not think that it is fair to say that the MOD is not responsive. We have continued to engage. I recall that a proposal was made for a holographic radar, which I believe was the basis for the original 2013 planning application and to which the MOD did not raise objections. However, it was a higher-cost mitigation and required further evidencing. I do not believe that it was progressed by the developer but, to be clear, if a way forward that will provide mitigation can be found by the developer, through that hologram radar or other routes, we would be very keen to look at the proposal afresh and see if we can make it work.
The good news is that since 2011 significant work across the sector has been undertaken, and that continues. The hon. Lady mentioned Dundee. I do not know the details of that off the top of my head, but it is in all our interests that technology and solutions are shared. Provided that there is not a commercial or other confidentiality reason, I see no reason why that information could not be shared. I undertake to look at that for her and see if anything can be shared. I apologise in advance if there are commercial reasons that prevent it, but it is a fair and reasonable request, and I will take it under advisement and return to her.
Further to the hon. Lady’s request, if she would be kind enough to work with me I would be pleased to facilitate a meeting between St Andrews and my colleagues in the Defence Equipment and Support wind farm team. I appreciate that they have met before, indeed as recently as September 2020—again, I think at her prompting—but the MOD remains open to considering any radar mitigation scheme proposed in future. If such a meeting would be helpful, I will certainly ensure that it is facilitated.
A solution that benefits the environment, cuts carbon and maintains our radar safety net is surely the best solution for all concerned. If my team are able to guide St Andrews on our views on the most recent technological developments and wider MOD thinking, which may help it to produce a solution that is acceptable, that is something that we should all certainly welcome.