North of England: Infrastructure Spending Debate

Full Debate: Read Full Debate
Department: HM Treasury

North of England: Infrastructure Spending

James Grundy Excerpts
Wednesday 25th November 2020

(3 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

James Grundy Portrait James Grundy (Leigh) (Con)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Gray. I thank my hon. Friend the Member for Southport (Damien Moore) for securing the debate.

Investment in new infrastructure is a key issue in my constituency. Indeed, it comes up at every election, local and national, and has done since the 1960s. The first issue, and the one that my constituents raise most often, is reconnecting Leigh to the national rail network. From the moment it lost its station in 1969, local people have campaigned vociferously for a new one, as have the people of Golborne, who lost the second of their two stations in 1967—the first was closed in 1952. I am pleased to say that two bids are currently under consideration as part of the Government’s Restoring your Railway programme. One is for the west coast main line serving Golborne, and one is on the Liverpool to Manchester line, at the old Kenyon Junction site just south of Pennington in my constituency, which would act as a new station serving Leigh itself.

Access to the national rail network, through investing in reopening those two stations, will generate massive economic opportunities for my constituency, meaning that jobs in both Liverpool and Manchester will be accessible by a train journey of approximately 20 minutes in each direction, rather than the two hours and 17 minutes that it currently takes to reach Liverpool, and the hour it takes to reach Manchester, by bus. In the long term, the investment will pay for itself in economic returns.

The second major issue to do with infrastructure investment in Leigh is the need to complete the Atherleigh Way bypass, which has lain unfinished for nearly 35 years. Currently only the middle section has been constructed, and the northern section to Chequerbent roundabout in Bolton and the southern section to junction 22 of the M6 are in desperate need of completion.

Both Leigh and the surrounding communities are beset by congestion and the associated air quality issues. Air quality is poorer in some parts of my constituency than it is in central London, with regard to nitrogen dioxide and fine particulate levels. The latter problem will only increase with the introduction of heavier batteries in electric vehicles, adding to the wear on tyres and roads. That congestion also dissuades new businesses from setting up in the constituency and considerably increases journey times for commuters. In 1966, Golborne Urban District Council, a predecessor authority to Wigan Metropolitan Borough Council, our current local authority, wrote to the Government of the day that the construction of the bypass was an urgent priority. I assure Members that the situation has grown no less urgent in the intervening 54 years.

The final issue I want to raise is that of connecting Leigh to Greater Manchester’s Metrolink system. In the fullness of time I hope that the Leigh guided busway system can be upgraded to a light rail link. Evidence provided to me by the all-party parliamentary group on light rail shows that buses persuade between 4% and 6.5% of car users to switch to public transport. Light rail, by contrast, persuades nearly 27% of car users to make the switch. If we are to meet our ambitious environmental targets, a new generation of hydrogen fuel-powered light rail serving suburban communities will be critical, and we need to start undertaking feasibility studies as soon as possible.

For too long, northern constituencies such as Leigh have been left behind in terms of infrastructure investment. We have been talking about these issues for the better part of 60 years. It is time for the talking to stop. It is now time to deliver for towns such as Leigh across the north.