All 1 Debates between James Davies and Graham Stringer

High Speed Rail (Crewe - Manchester) Bill

Debate between James Davies and Graham Stringer
James Davies Portrait Dr Davies
- Hansard - -

My hon. Friend is absolutely right, and that is what Sir Peter Hendy looked at in his Union connectivity review, which makes that point about the links across the UK, to Ireland and to the continent.

By investing in the improvements that I have outlined, we can prepare the ground to bring much of north Wales within a two-hour journey of London once the London to Crewe 2b section of HS2 is completed. Work on some elements of that agenda has already been conducted, or is due to be undertaken shortly, meaning that initial works could get under way sooner rather than later. I look forward to meeting the Chief Secretary to the Treasury shortly, alongside my colleagues in north Wales, to discuss further the soon-to-be-updated RNEP.

HS2 is an important British engineering and infrastructure project, which, like the M6, will be located in England but will benefit north Wales. There are those who say that HS2 should be considered an England-only project with Barnett consequentials arising for Wales. Journeys to and from north Wales overwhelmingly run on an east-west axis, and in my view there is absolutely no value in engaging in separatism and seeking to pretend otherwise. However, after many decades of underinvestment, the time for a significant financial commitment to the Crewe to Holyhead line has well and truly arrived. With such investment, HS2 will bring greater benefits to north Wales and thereby help to bring the Union closer together. With that in mind, I hope the Minister can give some clarity about when we might anticipate the Government’s full response to the Union connectivity review.

The inclusion in the Bill of a Crewe northern junction joining the west coast main line and HS2 north of Crewe is important for north Wales in ensuring an adequate throughput of northbound services at Crewe, and therefore sufficient connecting services for my region. I was pleased to help to lobby for this northern junction some years ago, alongside colleagues at the north Wales and Mersey Dee rail taskforce, who lead the Growth Track 360 campaign that I have mentioned. However, it is vital that funding be found for a fit-for-purpose Crewe hub station building and infrastructure, and that the design be future-proofed to allow rapid connections and HS2 through services to north Wales.

I move on to the recent announcement that the Golborne link will no longer be constructed. That brings with it potentially good news for north Wales, assuming that the route northbound via Warrington is to be upgraded accordingly. I encourage the Minister to examine that possibility carefully.

I recently met the head of public affairs for Manchester airport, Andy Clarke, who outlined to me the airport’s enthusiasm for HS2 but emphasised the need for several matters to be properly examined in the near future, including the likely impact of construction, the concern over the requirement for a local funding contribution towards the new airport HS2 station and the need to ensure that public transport links between the new station, the existing station and terminal buildings are up and running from day one. Once again, I hope the Minister will take that on board.

Graham Stringer Portrait Graham Stringer
- Hansard - - - Excerpts

On the point about Manchester airport, does the hon. Gentleman think it is discriminatory, and that it certainly does not help the levelling-up agenda, for Manchester airport to be expected to make a financial contribution to the station at the airport, when none of the other airports along the line are expected to do so?

James Davies Portrait Dr Davies
- Hansard - -

That is a valid point. I do not have the detail of other airports and the value that they are destined to derive from HS2. Clearly, Manchester international airport is a busy and successful one, and perhaps it can contribute towards the costs. It needs to be closely involved in the precise design and costings of the proposals.

This Bill will provide significant opportunities to level up across the UK, while protecting and strengthening the Union. It will also create very many well paid jobs during the construction phase and beyond. I urge the Minister to ensure that the potential opportunities for north Wales from HS2 are seized upon, in part by confirming and ensuring that the future through running of HS2 trains from Crewe on to an electrified north Wales coast main line is a serious aspiration for the Government.