Strategic Road Network: South West

Debate between Ian Liddell-Grainger and Jesse Norman
Wednesday 19th July 2017

(7 years, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

If I may respond in anticipation of the much-welcome but inevitable intervention from my beloved colleague from Gloucester, a little further afield, to the north-east, Highways England is also developing the A417 Air Balloon roundabout improvement—I should say that it is not a small scheme. Potential route options are being identified for public consultation before the end of 2017. That scheme will tackle a missing link in the dual carriageway between Gloucester and Cirencester, and I congratulate my hon. Friend the Member for Gloucester (Richard Graham) on his tireless championing of that important scheme, which will certainly have through benefits for trunk users of that road coming from Herefordshire to London.

I know that my hon. Friend the Member for Bridgwater and West Somerset has a particular interest in the M5 junction 23 Bridgwater scheme and wrote to the Transport Secretary recently on that matter. Let me turn to that, if I may. The Government’s view is that it is vital that there be a good connection to Hinkley Point. The new power station—and one must not forget the existing power station there—is of strategic importance to the UK, and the Government will ensure that the road network around it gives all the necessary access to the plant and works. That will support local economic growth, housing and local jobs.

Ian Liddell-Grainger Portrait Mr Liddell-Grainger
- Hansard - -

I thank my hon. Friend for bringing that up, partly because it affects the seat of my hon. Friend the Member for Wells (James Heappey) as much as mine, and also those of my hon. Friends the Members for Weston-super-Mare (John Penrose) and for Yeovil (Mr Fysh). We have heard about Weston, and I certainly know, as will my hon. Friend the Member for Wells, that Burnham is a very tight junction. The Secretary of State has been helpful to Somerset MPs in sorting this out, but will my hon. Friend the Minister allude to the need for more capacity at all the junctions from 27 to 21? We may need to revisit that, but I am grateful to him for what he is saying about junction 23.

Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

I absolutely take the point. It would have been remiss of me as the Minister not to have addressed this important issue, on which my hon. Friend has been vociferous—and rightly so—along with other colleagues in the past. That is why I have raised it now.

Highways England has been assessing a larger-scale upgrade of the Bridgwater junction, as set out in the road investment strategy. When my predecessor wrote to my hon. Friend recently, he relayed the fact that Highways England was continuing to collect data to inform its assessment so that it could continue to ensure the right solution for the local area. I will make certain that Highways England presses on with that process. I have encouraged it to continue to improve its engagement with colleagues—this is a valuable case in point—so that all relevant views are properly taken into account.

In addition, in March 2017 the Government named 27 proposed small congestion relief schemes that can be delivered quickly. The south-west was allocated some £32 million for improvements, better driver information and queue protection on the M5. Of course, we welcome further inquiries as to how junctions elsewhere in the region and on that road can be improved.

In the time that remains, I will briefly turn to the question of the future. As I have said, the £15 billion currently being invested represents a substantial increase in the rate of investment in roads, but even so, the first road investment strategy—what we call RIS 1—remains only an initial step, albeit more strategic than hitherto. That is why we have already started work on developing the second road investment strategy, RIS 2, which will handle further investment in the network beyond 2020.

The Department is currently gathering and analysing evidence about the performance of the network and the future pressures it faces. Of course, that is a dynamic process as further changes are made and ways of using the road network themselves change. Central to that approach has been Highways England’s work to refresh its 18 route strategies, each focusing on different sections of the strategic road network, which were published in March. As part of that work, Highways England gathered information from MPs, road users, local authorities and other stakeholders through an online public consultation last summer and through face-to-face meetings.

My hon. Friend will be particularly interested in the Birmingham to Exeter route strategy, which identified areas along the M5 where there are current and anticipated future pressures on the network. I am sure that also goes for other Members of all parties present in the Chamber.

We will use that evidence, and the results of a public consultation planned for later this year, to develop an investment plan that is affordable and deliverable and that will meet our key aims for RIS 2, specifically to support economic growth; improve network capability; enhance integration with local roads and other transport modes; reduce the number and severity of accidents; and protect the environment. We remain on track to publish the second RIS before the start of the next road period on 1 April 2020. In that context, I will pick up a point made by my hon. Friend the Member for Weston-super-Mare (John Penrose). That approach also needs to take into account some of the pressures that a route strategy has in relation to other arterial roads to ensure that the counterbalancing we have discussed is properly discharged.

While I am aware that the focus of this debate has been on the strategic road network in the south-west, I hope that I may acknowledge quickly the value of the local road network. Most journeys that use our motorways and major A roads start on the local road network. The Government continue to provide funding for local authorities and local enterprise partnerships in England to help fund large transport schemes that improve connectivity, ease local congestion and improve or update existing infrastructure, thereby helping to promote growth and deliver more housing. Most of the Department’s funding for large schemes now sits in the local growth fund, with some £6 billion provided to local enterprise partnerships through different growth deals.

Since 2011, the Department for Transport has invested over £360 million in major local schemes in the south-west. As well as the largest schemes, we continue to fund smaller schemes designed to open up developments and help maintain roads and bridges. The Government are also keen to invest in road maintenance to make roads better for users. That is why £12.5 million has been made available to fix potholes—a topic of great interest to every member of this House—in the south-west.

Shortly, I plan to announce the winners of the 2017 to 2018 highways maintenance challenge fund, whereby the Government will be investing £75 million to improve smaller local roads, including through resurfacing, pothole filling and other infrastructure projects. In summary, we are delivering on our plans for investment in the south-west’s road network, both strategic and local, to give the south-west the roads it needs for the future.

Question put and agreed to.

Phone and Broadband Coverage (Herefordshire)

Debate between Ian Liddell-Grainger and Jesse Norman
Tuesday 6th January 2015

(9 years, 11 months ago)

Westminster Hall
Read Full debate Read Hansard Text

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

If my hon. Friend the Member for The Cotswolds (Geoffrey Clifton-Brown) will let me continue, I will flag up when I am ready for the odd intervention or two.

The overwhelming majority of the constituents whom I surveyed thought that this was a serious concern and were in favour of action to tackle partial mobile phone not spots. We welcome the work that has been done on that by the Department so far. The situation is exactly the same for businesses. When Herefordshire’s sustainable food and tourism partnership surveyed its members, 97.8% responded to say that they had specific concerns and problems.

However, this is just part of a bigger picture. The Government need to look not merely at the effects of bad mobile and broadband coverage individually, but at their compounded effect. That is further magnified where there are insecure energy supplies, as in rural areas such as mine.

A mobile phone service is a lifeline for many people in rural areas, especially as BT telephone boxes are being withdrawn. Utilities, emergency services, telemedicine, delivery companies and tourists all require and rely on mobile and wi-fi coverage. However, it is common for my constituents to have download speeds of 400 kilobits per second and upload speeds of 120k—barely better than the old 56k connection—on aluminium phone lines, which prevent any kind of easy upgrade.

Welsh Water has told me that bad mobile coverage affects

“our speed of response and efficiency”

in attempting to serve tens of thousands of local people.

Kingstone surgery in my constituency has such a bad signal that if BT Openreach does not make urgent repairs, it will be unable to upgrade its software, potentially affecting 4,200 patients.

Ian Liddell-Grainger Portrait Mr Ian Liddell-Grainger (Bridgwater and West Somerset) (Con)
- Hansard - -

One of the issues that my hon. Friend is rightly exploring affects both our areas. Much of the rural heartland that we represent cannot be reached by the outreach that BT is doing, and we will need extra funding for some of our areas. I expect that that is exactly what he is homing in on. Across Exmoor, Dartmoor and those places, we will need that funding, I would have thought.

Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

I think that is true. It is not clear that an enormous amount of extra money is required, but it does have to be targeted at areas that suffer that compounded effect.