(1 year, 11 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Again, we will come back to that. The point I would bring back is that during the peak times we have largely been talking about, the 70% of pre-covid level figure drops to 50% to 65% during those peak periods. We are arguing about different parts of the service at different times. That is why I want to write, to explain exactly where my base is. Members can write back and say that they have a different base.
There have been a lot of points about transparency. I hope that right hon. and hon. Members who have met me know that I have an absolute desire to ensure that all the facts that I have are all the facts that right hon. and hon. Members will have—[Interruption.] I will take one more intervention; why not?
I totally agree that the Minister has been helpful and transparent. We are very grateful for the meetings that we have had. My concern is that if there is no train service on the Bexleyheath line to Charing Cross at weekends, the passenger numbers will fall. Therefore, it is a flawed argument. I hear what has been said about the peak period, but I am also concerned about the weekends. We have already heard about the disadvantage for certain members of our communities who will not go up to London. It could be that Southeastern loses a lot more passengers and revenue at the weekends.
My right hon. Friend makes a good point. This is the challenging balance for Government and train operators. The cloth has to be cut accordingly. If I look at my Southeastern service, I am now down to an hourly service, without the benefit of going up to Cannon Street but having to change at London Bridge, in the same way that Members are about to experience with their constituents.
I recognise the danger that, in order to grow the railway, it is necessary to demonstrate a positive experience. We do not want to get to a situation where the railway service looks like the bus service. At the same time, there has been time taken post pandemic to assess how passenger numbers have been performing and they have not performed with the level of uptick that we need to give us an indication that people will not change their work habits—they are not going to return to the office five days a week. That is why difficult decisions have had to be made, but my right hon. Friend makes a very good point and it will be taken into account.
On consultation, there has been a need to recast the Southeastern timetable for many years. The last recast was over a decade ago, when Southeastern’s highspeed services were introduced. Even before the pandemic, the timetable no longer matched demands and had inherent efficiency and structural performance issues. As has been pointed out, Southeastern has changed its timetable 15 times since March 2020. Coming out of the pandemic, the industry has had to continue to work at pace to provide rail timetables that meet the new travel patterns and carefully balance cost, capacity and performance.
Operators have had to move at speed to address changes in demand and deliver cost-efficient timetables. That means that traditional public consultation has not always been possible. It takes many months to design and consult on a timetable, and it would have been challenging for Southeastern to conduct a meaningful consultation without time to change the timetable based on the feedback it received. That ultimately means money spent on running an inefficient timetable for longer, costing the taxpayer money. Ministers at the time thought that this was unacceptable, and, as a result, agreed to allow operators to implement demand-led timetables through 2020 without consulting formally.
Going forward, fiscal pressures may mean that other relatively short-notice timetable changes need to happen. However, there are lessons to be learnt from this timetable change on engagement and information sharing with stakeholders, even if timescales are compressed. I say to all right hon. and hon. Members present that I will ensure that if changes need to be made there will be transparency and engagement with Members of Parliament and other stakeholders at the earliest opportunity. It may not be possible to do a full 16-week consultation, but I will ensure that the starting point is with Members in this place. That is what I would expect, and I give them that assurance.
While I am giving assurances, I was also asked by my hon. Friend the Member for Old Bexley and Sidcup (Mr French) for an assurance that there are no plans in place to close Albany Park station: there are no plans in place to close Albany Park station.
(8 years, 5 months ago)
Commons ChamberMy hon. Friend makes an interesting point, and I will certainly do that. Rugby is a fantastic game that brings together all sorts of different people from different backgrounds and has great opportunities for community.
6. What steps his Department is taking to accelerate the roll-out of broadband in (a) rural and (b) urban areas.