(10 years, 6 months ago)
Commons ChamberI do agree. In part, the problem is reliability, but one of the main issues that I want to focus on is the degree of overcrowding that we experience on our train services.
The case for tackling overcrowding on my part of the rail network is irrefutable. The problem is getting worse and is likely to deteriorate further if urgent action is not taken. Thousands of new homes are planned in places like Lewisham and Catford over the next few years, and it goes without saying that future residents will need to be able to get around. They will need to be able to get to work and to get back from other parts of London at weekends. Basically, they need a decent railway service to live their lives.
The population of Lewisham continues to grow. Despite asking various parliamentary questions on this subject, I am at a loss to understand when commuters in my constituency are going to see longer trains. All I know is that, according to an answer I received on 8 April, the Under-Secretary of State, the hon. Member for Wimbledon (Stephen Hammond), who is the railways Minister, does not think there is demand for longer trains on all services. Beyond that, I am afraid that I cannot get much sense out of the Department or Southeastern.
Currently, no 12-car trains serve stations in my constituency during the rush hour, but there should be such trains. Platforms have been extended. I suspect that millions of pounds has been spent on doing that job, although again, despite my asking parliamentary questions, the Department cannot tell me how much has been spent and refers me to Network Rail. When I have asked Network Rail, it has not got back to me. We have spent money on lengthening platforms but we do not have longer trains to stop at them. It is almost as good as the one about the aircraft carriers with no aircraft to use them. Surely in difficult economic times we should not be wasting expenditure in this way—we should be reaping benefit from it.
In the written answer I received from the Minister at the beginning of April, I was told that a study would be done in 2016 and that some capacity enhancements may be forthcoming from 2019. That is at least five years away. It is simply not good enough. The Minister is currently in the process of negotiating a new “direct award” contract with Southeastern. Following the mess that the Government have made of letting franchises elsewhere in the country, they have put on hold the letting of the new Southeastern franchise, deciding instead to award a series of shorter, directly awarded contracts. Is there no way in which they could negotiate longer trains on some services calling at stations in my constituency sooner than 2019? Could some trains not start closer into London?
I would be really grateful if the Minister could explain the issue. Is it the availability of rolling stock? Is it an unwillingness on the part of Government to fund longer trains? Is it that when he looks at overcrowding statistics for services into London he thinks that there is not a problem on services run by Southeastern? If it is the latter, I would urge him to speak carefully to his civil servants about how the standard definitions of overcrowding —passengers in excess of capacity, otherwise known as PIXCs—are calculated. My understanding is that the calculations include an allowance relating to what is deemed to be an acceptable number of people standing in addition to those sitting. The excess passengers figure comes on top of that and, given that my constituents experience the most crowded 20 minutes of the journey, I am not sure that those PIXC scores will paint a realistic picture of the levels of overcrowding experienced by commuters who live in my constituency.
I also understand that Southeastern amalgamates its performance data for all of its services, including its High Speed 1 services from the channel tunnel, which may also skew overall performance scores. Does the Minister look at disaggregated data for each of the different types of Southeastern routes?
The hon. Lady is doing a very good job of standing up for her constituents who use the Southeastern service, which is also used by my constituents. Will she join other Kent and south London MPs in calling for the disaggregation of data as part of the new franchise agreement?
I would be happy to join hon. and right hon. colleagues in calling for that. It needs to happen before the new franchise is let. Could we see it in the direct award contracts that the Department will be letting, I think, this summer?
I think you will have probably sensed my frustration, Madam Deputy Speaker, but I am not the only one who feels strongly about the issue. I speak on behalf of a very significant number of my constituents. Sadly, it comes as little surprise to me that the national passenger survey and surveys by organisations such as Which? put Southeastern at the bottom of the train operating company league table. I suspect that much of my constituents’ dissatisfaction is driven by experiences of overcrowding and a general sense that the service offered is woeful value for money. It also relates, as the hon. Member for Dartford (Gareth Johnson) has said, to a lack of clear, reliable, real-time information when there are cancellations and delays.
I know that Southeastern has requested an official review by the rail regulator of Network Rail’s performance, as not all problems relate to things in Southeastern’s control. I understand that, but there needs to be better communication with the travelling public and a sense that Southeastern is not just constantly trying to shift the blame to someone else. It would be useful if the Minister provided an update on the official Office of Rail Regulation review.
It would also be useful if the Minister provided his latest thinking on what should happen come 2018. Given poor performance and the fact that Southeastern’s parent company, Govia, received £82 million in Government subsidy last year, is he satisfied that the current franchising system is delivering the best deal for the taxpayer?
We know that the Government are reluctant to do a root-and-branch review of the structure of railways in the UK, presumably because they are concerned that it may throw up pragmatic solutions that go against the grain of their ideology. The public, however, want to know that if they are paying exorbitant sums for their travel, they are getting the best possible bang for their buck.
Could Transport for London, for example, become the franchising authority for Southeastern in future? Experience in south London with the London Overground has been positive, and TfL will soon become the franchising authority for some Greater Anglia services. Why do not the Government want to do the same for Southeastern?
I am conscious of the fact that this debate started earlier than usual and I would like to take a few more minutes to pick up on two issues relating to Southeastern services and connectivity: the Catford loop line and access arrangements at Lewisham station.
Many local people share an aspiration for four trains an hour to stop on the Catford loop. I am told that such a service could be introduced without detriment to other existing services. I have asked Ministers about this before and have been told that the detailed specification for services in a new Southeastern franchise has yet to be decided. However, given this interim period of four years before any new franchise, is there any possibility of upping the number of stopping trains on the Catford loop?
May I ask the Minister to revisit my correspondence with his predecessor, who is now the Secretary of State for Northern Ireland, about Southeastern’s determination to keep the platform 4 gate at Lewisham station permanently closed? If we want people to use the railway instead of their cars, stations need to be as easily accessible as possible. Although I understand Southeastern’s desire to tackle fare dodging by having a fully gated station, that makes no sense when the next station stops are not gated. With a significant regeneration scheme now under way next to Lewisham station and access arrangements reduced as a result, the platform 4 gate issue has taken on new importance. Even if it cannot be reopened permanently, might a temporary relaxation be allowed for the duration of the construction works on the adjacent development project?
I realise that I have been down in the detail of rail provision in my constituency, but these are important matters for many of those I represent.
London is a fantastic city to live and work in, but it is let down by its failing rail network. I am afraid to say that I am not sure that Ministers seem willing or able to intervene, let alone to learn lessons and correct the system. The result is that existing train operating companies are limping on, with passengers feeling voiceless and out of pocket. Put simply, when we ask people to pay sky-high fares for their travel, they should at least get a half-decent service.