(9 years, 4 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I appreciate the hon. Lady’s intervention, because although the bulk of my remarks will focus on the safety and transportation concerns she has expressed—I take her concerns at face value—at the heart of the debate is her and her party’s position on nuclear weapons. Of course we never want to use such weapons. However, as a Defence Minister who passionately believes that there would be dread consequences for the hon. Lady’s constituents and the whole UK if we did not have a deterrent, I believe it is absolutely fundamental that we retain that deterrent and say to those who would do us harm that there would be consequences if they used such dread weapons against us. I am happy to debate that point with the hon. Lady and her colleagues at any time; it is incredibly important and at the heart of what the debate is about. I will take at face value her concerns about the transportation of warheads, so I will address the bulk of my remarks to those points.
The specialist defence sites involved in delivering our nuclear weapons programme are based at Clyde, at Coulport and at the Atomic Weapons Establishment in Berkshire. As such, it is necessary to transport nuclear defence material, including warheads, between those sites, although the movement of such material is kept to the minimum necessary to meet operational requirements in support of the UK’s strategic deterrent programme. It is an important principle of nuclear warhead safety that warheads should not be moved unless it is necessary.
I make it absolutely clear that the safety of the general public and the security of nuclear weapons convoys are our first priority at all times. Safety is paramount during the transportation of defence material, and all appropriate measures are taken to ensure that such weapon convoys can operate safely. Our safety record is excellent. In more than 50 years of transporting such material by road in the UK, there has never been an incident that has presented any risk to the public or the environment. A stringent safety reporting system is in place so that all incidents, however minor, are recorded and assessed for possible improvements to future operations.
The hon. Lady and her colleague referred to the log and expressed concerns, particularly about transportation during severe weather. As Members would expect, I have been through the log. On the Erskine bridge incident, the authorities were consulted. In any scenario where there are adverse weather conditions, Traffic Scotland and the police in Scotland are consulted. The convoy was not crossing the bridge until the weather had moved on. That is recorded.
Concerns have previously been expressed about convoys travelling through residential and urban areas. While the House would not expect me to discuss the specific details of routes for obvious security reasons, I assure Members that the routes are carefully selected as part of a rigorous risk assessment process and are regularly reassessed for their continued suitability. The transportation of nuclear and other hazardous materials is governed by international and national regulations, including the Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2009, as amended in 2013. Although there are exemptions for certain defence-related activities, Government policy is to comply with the principles of those exemptions.
The safety of nuclear convoy operations is carefully considered at all stages of the transportation process. Operational planning always takes into account such factors as road and weather conditions, and we consult with all relevant local agencies before undertaking a convoy move. Contingencies are planned for. The convoy is operated by a highly trained crew, consisting of a first-aid team, firefighters, mechanics and others to enable roadside repairs and personnel equipped to monitor for radiological hazards.
Members will be aware that the weapon is by its very nature an extremely robust device, designed to withstand launch and re-entry into the Earth’s atmosphere. It is transported in a benign configuration and secured in a custom-designed container that is tested in accordance with International Atomic Energy Agency standards to protect against a range of scenarios, including impact on a motorway at speed, a drop from height and a fuel fire, among others.
If the hon. Gentleman does not mind, I will make a little progress. The vehicle that carries the container is custom-designed to provide robust crash protection, even in the event of a severe road accident. We have invested in our vehicle fleet and completed a significant upgrade programme in 2014.
Another issue that the hon. Member for Rutherglen and Hamilton West mentioned was the threat of terrorism with the transportation of nuclear materials. The risks associated with terrorist attack are mitigated by a range of counter-measures, including the vehicle itself, specific warhead protection measures, intelligence, monitoring and armed escort, which includes the Ministry of Defence police. Although the operational details of those counter-measures are understandably classified, Members can be reassured that we have the capabilities to deal with any such threats. Our security arrangements are kept under review, frequently tested and subject to formal inspections to ensure that they meet the required standards.
The limited movement of nuclear defence material together with inherent safety and security features and procedures mean that the probability of an accident leading to a release of radiation is extremely low. Nevertheless, as part of our rigorous approach to safety we maintain wider arrangements to respond to any incident, no matter how unlikely; that includes the Nuclear Emergency Organisation and the necessary contingency plans to deal with any accident. Under the auspices of the Defence Nuclear Safety Regulator and with the participation of the emergency services and local authorities, we also carry out regular exercises to rigorously test the continued effectiveness of our response.