High Speed 2

Frank Dobson Excerpts
Tuesday 23rd November 2010

(13 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Frank Dobson Portrait Frank Dobson (Holborn and St Pancras) (Lab)
- Hansard - -

When I first looked at the plans for High Speed 2, I was principally concerned with its immediate impact on my constituency where it comes into Euston station. Its effect there would be the demolition of 350 flats, about two thirds of a small park, St James’s gardens, being concreted over, a massive inhibition on the much-needed rebuilding of Maria Fidelis Catholic girls secondary school, and problems for people in the Primrose Hill area, whose homes would be tunnelled under in a big way. However, the more I looked at the proposal, the more I thought that it was not just a matter of the damage that it was likely to do in my constituency, but that the whole project of bringing the line into Euston station and other aspects of the proposal were daft and expensive.

In saying that the London terminal should be Euston station, the projectors had to come up with ways of coping with the fact that Euston station is not on the Heathrow Express line and is not intended to be on the Crossrail route, so it does not have major connections that would be important for High Speed 2. To cope with that, the projectors proposed building a sort of super-parkway station at Old Oak Common—more commonly known as Wormwood Scrubs—and then rebuilding Euston as well. Bringing the line into Euston would also involve the boring of a 5½ mile tunnel, which as we all know is a fairly expensive item.

If the projectors had instead proposed that the line came into Paddington station, that would have made sense, because Paddington is already the terminus for the Heathrow Express and will be on the Crossrail route. The idea of coming into Euston seems to spring entirely from the fact that trains from Birmingham have always come into Euston. There is no more justification for it than that.

When I looked at the plan more widely, it seemed to me that there were other major shortcomings with it. High Speed 1 has been a great success, and certainly the refurbishment of St Pancras station in my constituency—I think that I was the first person to suggest that St Pancras should be the High Speed 1 terminal—has been a great success. The idea that we shall have just one leg of a high-speed system coming into London but not connected to High Speed 1 seems simply stupid. If we are to have a high-speed rail system that is on the end of the high-speed system in the rest of Europe, it would not be a bad idea if it was connected to it, which is not the present proposition.

Similarly, if only one leg of the system from the north will come into London, that will mean that the system is vulnerable to a major crash or terrorist activity that would close down the whole system. I make no comment on where the line should run outside London, but it seems to me that rather than a Y-shape arrangement, there ought to be an H-shape arrangement, so that coming into London are two legs, at least one of which is directly connected to High Speed 1 and would allow trains to come from the east side of Scotland, and the north-east and Yorkshire, and, if they wanted to, come into Paddington. Other trains from, say, Glasgow or Manchester would be able to cross over and come into wherever the link to High Speed 1 was located.

The scheme is badly thought out and extremely expensive. It will be amazingly damaging for my constituency. It should be withdrawn and criteria should be established that set out what on earth it is supposed to achieve. We should then come up with proposals that go some way towards achieving that.

I will move on to the scheme’s affordability. I have, in theory, a degree in economics. I am convinced that economic forecasts for more than 18 months nearly always turn out to be total rubbish. I therefore do not give much weight to anybody’s economic forecasts or assessments of viability for or against the scheme. History shows that all the major railway engineering projects of the 19th century went bust, were involved deeply in fraud or, more commonly, both. I do not think that a major railway project has ever paid back the original investors, unless they have benefited from fraud, such as the huge Ponzi scheme of the line to the north-east. I think we must accept that such projects never will repay their investors and that there is no free-market solution. Apparently, the Institute of Economic Affairs wants to rip up High Speed 1.

Steve Baker Portrait Steve Baker
- Hansard - - - Excerpts

On coming to this place, I did not think that I would find myself much in agreement with the right hon. Gentleman, but I am delighted to hear him speak against rail. Would it not have been good if the market had stopped the rail programmes that he has mentioned because insufficient people freely chose them to make them profitable? Money would then not have been wasted on such infrastructure.

Frank Dobson Portrait Frank Dobson
- Hansard - -

I have never heard anybody suggest that the 19th-century railway boom in every industrialised country in the world did not contribute substantially to the economic development of those countries. Perhaps some people at the Institute of Economic Affairs are so stupid and reactionary that they believe that, but that is by the bye.

The impact of the scheme on my constituency will be dreadful and I reject it on a parochial basis. I also believe that it is ill thought out and will not achieve most of the things that are sought by people who are in favour of a high-speed system in this country.

--- Later in debate ---
David Mowat Portrait David Mowat
- Hansard - - - Excerpts

I accept that. Indeed, where we have areas of high unemployment, the ability of people who live there to enjoy their environment is much less than it would be otherwise. The Government also have a duty to take into account the impact on prosperity and employment throughout the country.

I want to make a couple of slightly more detailed points. It is important that whatever we build is linked to Heathrow. Those are probably the Government’s plans, but it seems to be absolute nonsense to build a high-speed rail link to the north and not to link properly Manchester airport and Heathrow, so as to see some of the traffic from Heathrow move.

I am of the view that the line needs to go to Euston and should not stop and link to Crossrail. I am not an expert, but Euston seems to be close to the business centres of London, so the impact of achieving that would be substantial.

I would like to see a spur to Warrington and Preston as soon as possibly, but I realise that the Minister might not think that that is her highest priority.

With reference to an earlier point, not linking High Speed 2 with High Speed 1 would be absurd. In my understanding of the initial business case for High Speed 1, the reason why we went into St Pancras in the first place was to allow that line, eventually, to go north. We are now building a High Speed 2 line to the north, so it ought to be linked.

Finally, it is very important that the Government maintain their commitment to the plan and realise that they are the Government for the entire country, and the entire country needs this.

Frank Dobson Portrait Frank Dobson
- Hansard - -

Will the hon. Gentleman give way?

David Mowat Portrait David Mowat
- Hansard - - - Excerpts

I have finished now, so I will not give way.