(1 week, 4 days ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Emma Foody
My hon. Friend has been working closely with me on seeking the upgrades that I will be talking about, so I appreciate his intervention.
I commend the hon. Lady and understand exactly her frustration in relation to having infrastructure in place. In my constituency we have been pursuing the Ballynahinch bypass for over 35 years—15 of which I have been pursuing it as an MP. We now finally have a date, but such situations hold back development and housing potential, and affect businesses in the short term. Does the hon. Lady agree that such things need to move much more quickly, otherwise they will be the death knell for the towns that we all represent?
Emma Foody
The hon. Gentleman is absolutely right.
The infrastructure in my constituency that I am talking about—as my hon. Friend the Member for Blyth and Ashington (Ian Lavery) highlighted—is the Moor Farm roundabout; hon. Members will be aware that barely a day goes by when I do not talk about it. I have also met Transport Ministers and I continue to lobby for the much-needed upgrades to be progressed through the road investment strategy.
As has been mentioned already, however, this issue goes far beyond the road network and beyond my area; it affects the entire north-east region. That is why I have called for this debate with the Ministry of Housing, Communities and Local Government as the answering Department, because it is about housing, local plans and devolution. It is also critical to several councils in the north-east.
I will set out the context of the existing infrastructure at Moor Farm. This roundabout is a major strategic six-armed roundabout. It links the A19, A1 and A189. Sitting at the south of Northumberland on the border with North Tyneside, it is heavily congested and well used. It is a key gateway for the region and the link between Newcastle International airport and the ports of Blyth and Tyne. It is the key growth corridor for south-east Northumberland.
There is significant congestion at Moor Farm roundabout, which causes misery to local residents. We frequently see substantial delays, especially as a result of accidents on or near it. In recent weeks, we have seen delays of hours due to incidents that are far too frequent. The Department for Transport’s own statistics show that between 2021 and 2024, there was an 85% increase in delays through the northbound A19 section of Moor Farm and 36% increase in delays southwards. The north-east local transport plan states that Moor Farm generates congestion, worsens air quality and results in unreliable journey times. However, this is not a debate on the transport elements of Moor Farm—hon. Members can go back to my previous Westminster Hall debate for that.
In this debate, I want to talk about how the situation at Moor Farm is impacting growth and development across the region in the short and long term. Moor Farm is a blocker to growth and a blocker to opportunity. It is preventing business expansion, causing investment to be delayed or withdrawn, costing jobs and hampering growth. It is putting at risk not only existing development sites for employment and housing in Northumberland and North Tyneside, but the ability for those councils to update their local plans and meet the housing need.
Since being elected, I have met National Highways on several occasions. In the last few weeks, I have written again to the chief executive. Last week, I met regional representatives in Parliament, and I have met the North East Mayor and the roads Minister. The aim of this debate is to discuss the impact that National Highways and the situation at Moor Farm are now having on the ability to determine planning applications—whether for businesses to grow or for housing—across my constituency and beyond.
The Minister will know that as a statutory consultee, National Highways can issue holding recommendations on planning applications, in effect preventing them from moving forward. In response to my written question, it has been confirmed that there are at least four holding objections on applications for housing and business development as a direct result of the Moor Farm roundabout. Not only that, but applicants are delaying or redirecting their investment because they have been told that National Highways would apply a holding objection, so there is a far greater lost opportunity cost. I know from speaking to developers, businesses and the community that investment has not been brought forward because of concerns that planning will be refused or held back as a result of holding objections or unrealistic mitigations.
I will give some examples. The Port of Blyth sits in the constituency of my hon. Friend the Member for Blyth and Ashington. He and I recently met representatives of the port who informed us that their key near-port site for inward investment is at West Hartford in my constituency, the largest remaining strategic employment site in the whole of Northumberland. It is 10 minutes from the Port of Blyth’s main terminals and there is a firm interest in developing the site.
This is a key regional stakeholder seeking to invest nearly 2,000 jobs and £400 million in my community, but National Highways has indicated that it would object because of Moor Farm, despite traffic impact assessment modelling indicating that the proposal would add one queuing vehicle during the morning peak rush hour and three in the afternoon. National Highways’ objection is simply not reasonable or proportionate, but should it apply a holding objection, there is little that could be done locally due to its role. The Port of Blyth has rightly called for a more pragmatic cost-benefit approach.
That is just one example. The North East combined authority estimates that within a 5-mile radius of Moor Farm there is commercial development with the potential to support more than 11,000 jobs at risk of being held back due the constraints of the roundabout. Another local developer has spoken of sites—one of £500 million in gross development value and one of £1 billion in gross development value—that are in current adopted local plans but are being held up because of the roundabout. I have been told that this has meant 18 months to two and a half years of additional modelling and surveys, but still they have not been able to proceed. One developer described this as a
“near endless loop of present information, National Highways’ consultants review, then respond, rinse and repeat”.
That has real-world impacts. A separate developer on an existing site warned that they may have to remove apprentice roles and other jobs if the issue is not resolved, depriving the community of local opportunities and impacting the local supply chain. That development is already baked into the housing delivery numbers but cannot move forward. Another developer explained that they might not suggest future viable sites as a direct result of expected objections from National Highways, reducing their work and footprint in the area.
(5 months, 1 week ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Emma Foody (Cramlington and Killingworth) (Lab/Co-op)
I beg to move,
That this House has considered transport infrastructure in Cramlington and Killingworth constituency.
It is a pleasure to serve under your chairship, Mr Stringer. I am pleased to debate this important issue and to see the Minister for future of roads. It will come as no surprise to her that I will take the opportunity to talk about the Moor Farm and Seaton Burn roundabouts in my constituency. We have become pen pals on this issue and I thank her for her responses and for meeting me about it.
I start by warmly welcoming the Government’s recent announcements in the regional growth statement, with £1.8 billion secured for the north-east; the emphasis on delivering capital projects in the spending review; and most importantly, the announcement on the Green Book. That will support transport infrastructure investment in communities such as mine in Northumberland, North Tyneside and Newcastle.
For too long under the Conservatives’ Green Book we were disadvantaged—missing out on the investment we deserve due to outdated formulas. Those recent announcements show a Government committed to long-term growth and investment. I want that to be used to unlock the enormous potential of my communities.
I commend the hon. Lady for bringing forward this debate. Before she was elected, she had a scheme that she wished to happen. Now, as an MP, she has the opportunity to push it forward, and she will hopefully get a response from a sympathetic Minister. Does she agree that if that infrastructure is not in place, it will hold back economic growth in her constituency? It is important to move that project forward, because with that every other project can move forward.
Emma Foody
I absolutely agree with the hon. Member—it is as if he has seen the key points of my speech. This is a critical piece of infrastructure in my area for all the reasons he said and more.
One such game-changing project for the north-east would be the upgrading of the Moor Farm and Seaton Burn roundabouts. Those who do not know about these roundabouts have never heard me speak in this place, because I talk about them a lot. Moor Farm is a major, strategic six-armed roundabout that links the A19, A1 and A189 and sits to the south of Northumberland, on the border with North Tyneside. This heavily congested and well used roundabout is a key gateway across south-east Northumberland to the Northumbria specialist emergency care hospital in Cramlington and to the new data centre in Cambois that the Government have been pivotal in supporting.
Seaton Burn links Northumberland and North Tyneside to the A1 and on through to Newcastle, as well as providing links to south-west Cramlington, an area of significant housing development, and the villages to the north-west of North Tyneside. These critical pieces of infrastructure form part of the south-east Northumberland corridor, as well being a key link to Blyth, Killingworth in North Tyneside, and Newcastle. Both roundabouts sit on the A19, which is of strategic importance to the north-east more widely, linking to the Port of Tyne, South Tyneside and Sunderland, and to key employment sites such as Cobalt Park, Follingsby Park and the International Advanced Manufacturing Park.
In earlier road investment strategies, Silverlink and Testo’s roundabouts, further south on the A19, have been upgraded. Those earlier works significantly improved traffic flows on the A19 through the north-east to south-east Northumberland. It is now possible to travel north on the A19 from Thirsk in North Yorkshire all the way to south-east Northumberland without hitting an at-grade junction—until Moor Farm roundabout. Surely, now is the time to finish the job and complete the junctions to the end of the A19 at Seaton Burn.
My area has seen significant housing developments in recent years, including estates such as St Nicholas Manor, the Fairways and West Meadows in Cramlington, and Backworth Park in North Tyneside, with future sites including Killingworth Moor and Murton Gap—all of which add pressure to the roundabouts. In 2022, the section of the A19 east of the Seaton Burn junction had an annual average daily flow of 44,300 motor vehicles, while the section of the A19 east of Moor Farm had an annual average daily flow of 33,900.
The result is that the roundabouts are past breaking point. Do not just take my word for it; the Department for Transport’s own statistics show that, between 2021 and 2024, there was an 87% increase in delays through the northbound A19 section of Moor Farm, and a 36% increase southwards. The A19 section of Seaton Burn saw a 31% increase during the same period, which has a knock-on impact on the A1, with an 18% increase in delays joining Seaton Burn on the A1 northbound.