Rail Services: Carshalton and Wallington Debate
Full Debate: Read Full DebateElliot Colburn
Main Page: Elliot Colburn (Conservative - Carshalton and Wallington)Department Debates - View all Elliot Colburn's debates with the Department for Transport
(1 year, 7 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I beg to move,
That this House has considered rail services in Carshalton and Wallington constituency.
It is a pleasure to serve under your chairmanship, Dame Maria. This is not the first time that I have had to raise rail provision in the Carshalton and Wallington constituency, and I am sure it will not be the last. First of all, I thought it might be useful for me to outline the situation that my constituents currently face when it comes to local public transport provision. Being situated in a London borough—the London Borough of Sutton—many people will assume that Carshalton and Wallington is incredibly well-connected in its public transportation. However, if anyone looked at my own casework inbox, they would see that that is far from the case.
Broadly, the borough has an average public transport accessibility level, or PTAL, of just 2, with parts of my constituency ranking at level 1 or even zero. What is more, Sutton continually ranks at the bottom of connectivity surveys and is the only London borough not to have access to an underground, overground or Crossrail station. As you can imagine, Dame Maria, that puts enormous strain on the existing public transport network, especially the rail service, which is not helped by the limited bus system.
The strain is felt across all four local train stations: Carshalton, Wallington, Hackbridge and Carshalton Beeches. It is not just the gap at Hackbridge station—I will talk more about that later—that my constituents have to consider, but the gap in overall service. That is because trains running through these stations take commuters north to central London, particularly London Bridge and Victoria, and south to Sutton, Epsom, Dorking, Horsham and further afield. Even before the pandemic, many of the peak services would already be at capacity by the time they reached one of our local stations, and well before they reached their intended destination. I had not been in this place for long before lockdown, but emails from constituents attested to cramped and uncomfortable journeys. I had experienced such journeys myself, as someone who used to commute from those stations. Indeed, I now commute every day to this place.
Fast forward to today, and post pandemic the situation is largely unchanged, just with fewer trains. Despite the return to user levels reminiscent of pre-lockdown levels—at least, that seems to be the case—commuters in Carshalton and Wallington still have to face very cramped peak-time trains.
I have met representatives from Govia Thameslink Railway—the parent company of both Southern and Thameslink, which operate in our four stations—and from Network Rail, and I have brought up the need for more trains to call at Carshalton and Wallington stations during peak times. I would be grateful if the Minister could comment on the work the Government are doing to hold rail providers to account and bring back a full return to pre-pandemic services, and indeed to build upon them.
There are other issues that affect rail provision and the ability to boost the number of trains that can run effectively and on time, or even at all. For residents of Carshalton and Wallington, the train timetable tells one story, but the reality on the station platforms tells a very different one. Our lines are bedevilled with cancellations because of broken trains, a lack of drivers or signalling faults; at least, those are the reasons we are given. I hope that the Minister can shed some light on the work that the Government are doing to tackle those issues.
The other thing I find slightly confusing is that a reason that is often given for not reinstating peak service train timetables in the morning is that more people use the rail service at the weekend, and yet many of my constituents say that at weekends they cannot get a train and have to use replacement bus services, because engineering works are taking place. That becomes incredibly difficult, and I find it very confusing why engineering works cannot be done more efficiently.
I want to touch on infrastructure in a bit more detail. Much of the existing infrastructure is outdated and unreliable, which often means that trains that are scheduled to run are unable to do so, or that there are slower turnaround times for those that can run. Indeed, the infrastructure on the railway network in south London is preventing what is known as the metroisation of suburban rail services in London—the “turn up and go” service that we experience on the London overground. I know that there is an ambition to bring that to some national rail services, particularly in suburban London. With the infrastructure as it is, it is just not possible to achieve that.
I know the Government are already doing a number of things to try to ensure that not just Carshalton and Wallington residents, but the whole country, can reach its connectivity potential. Those things include electrification, digital signalling and better co-ordination between operators and Network Rail, the latter of which would hopefully alleviate many of the problems that we face with frequent service disruption. I would be grateful for an update from the Minister as to where we are in better fulfilling those connectivity challenges through advancements and improvements.
One of the biggest problems preventing us from having a more regular rail timetable is congestion on the railway line. That all comes down to the Selhurst junction—the so-called Croydon bottleneck. Network Rail has drawn up the Croydon area remodelling scheme to try to alleviate congestion at that junction, which is the main junction of the Brighton main line and suburban south London. Not only will the knock-on effects allow more trains and more frequent and reliable services on the Brighton main line, but suburban south London, including Carshalton and Wallington, will be able to run more trains, and more effective and longer trains. If finally implemented, the bottleneck scheme could not only unlock capacity in the south but improve economic output. I would be grateful if the Minister gave an update on the Government’s position on the Croydon bottleneck scheme and what can be done to reignite its potential.
While I fully accept that solutions to some of these issues may take some time to implement, some issues can be dealt with a lot more quickly. Even if more trains appeared on our timetables overnight, there would still be the issue of the trains calling at our stations, particularly Hackbridge and Carshalton Beeches stations. I have spoken to the Minister about this before, so I hope he will forgive me for repeating it. Hackbridge station has two main problems. First, it can only accommodate seven cars, when most of the trains that go through it at peak times have eight cars or more. If the platform were extended to accommodate at least eight cars—preferably 10— it would mean more safety for commuters waiting on that platform, particularly in the morning when the northbound platform towards central London can get very cramped.
Secondly, the southbound platform at Hackbridge has a very serious safety concern at the front end, where the gap between train and platform is so big that it has led to a number of accidents involving constituents falling in that gap, and stalling the rail network as a result. Thankfully, GTR and Network Rail have agreed to lower the level of the track to make it safer. However, they have not committed to completing that work until 2027. I do not think that is fast enough, because this is a very serious safety concern. The gap is so big that even a ramp is an unsafe alternative for those who have mobility problems. I am concerned about someone really hurting themselves by falling down the gap. That has happened already; we have avoided something incredibly serious, but it is not beyond the realms of possibility.
At Carshalton Beeches station we have connectivity problems, because the southbound platform does not have step-free access. I have applied many times to the Access for All fund to try to make that right. Those who are travelling back to Carshalton Beeches from central London or other parts of the rail network have to carry on through to Sutton, change platforms and then come back to Carshalton Beeches to disembark safely. As someone who passionately believes that the rail network should be accessible to all, I do not think that those with mobility problems should be subjected to that. What opportunities might there be to apply for the funding to finally make all four of my local stations completely step-free, both northbound and southbound.
In a debate about public transport in my constituency, it would be remiss of me not to mention the ultra-low emission zone. Although it is not directly related to rail services, there is a problem here connected to public transport provision. My constituents are faced with the real possibility that in August they will have to pay £12.50 a day just to use their vehicles in Carshalton and Wallington, as will people planning to visit the local area. The retort of, “Just get on public transport” does not work if we consider the state of the public transport network, as I have set out. The lack of rail services and other public transport infrastructure, and the unreliability of the service that does exist, further adds to the headache my constituents face when going about their day-to-day business.
I reiterate my call to the Mayor of London to scrap plans to expand the ULEZ. My call is backed by the Liberal Democrats and the Green party, and I hope the Minister will join me in it, too. This is the wrong time, and the plans will not work. I sincerely hope that I have the Government’s support on that. Yes, there are issues holding up full restoration of pre-pandemic peak services, but there are a number of solutions, too. These vary in implementation length, depending on the work needed to put them in place. However, solutions will free up capacity, increase usage and unleash unrealised potential across Carshalton, Wallington and further afield.
I sincerely hope that we can hear some Victorian-level ambition for our railway network from the Minister today. Rail does not have to be a relic of a bygone age. It can help super-charge our local economy and unlock new growth, not just for my area but for the rest of south London and the UK. The potential of a well resourced, well built and well serviced railway is exponential—so long, of course, as the Government’s rail plans remain on track.