(10 months ago)
Commons ChamberI beg to move,
That this House has considered the civil nuclear roadmap.
I thank the Backbench Business Committee for allowing time for a debate on this very important subject. This is probably the biggest moment for the nuclear industry in the UK for 50 years. The Government have set a very important and ambitious target of an extra 24 GW of nuclear energy into the grid by 2050. It will require a huge feat of civil engineering to create the facilities required to deliver that. We will do that in the context of wishing to see less reliance on imported oil and gas in our economy, with more clean sources of energy and electricity, and recognising that other changes in technology are creating enormous demands for new energy. The impact of artificial intelligence on energy demand will be very significant indeed. A researcher in the Netherlands estimated that the amount of electricity just to power AI in the world by 2027 will require enough electricity to power a country the size of the Netherlands. That is a not insignificant amount and an entirely new demand, in addition to the high levels of water required to power the cooling systems required for the amount of computing power and energy. Our demands for the electricity market are changing, but technology is also changing the impact it will have.
The review that the civil nuclear road map sets out has to consider not only those challenges but the requirement set in 2011, when the current nuclear site list was agreed by Parliament, that it would need to be reviewed in 2025 for the next period. I remember very well, as a new Member of Parliament, the 2011 review, and with the nuclear power station at Dungeness in my constituency. The idea of the site list then was to try to give certainty to communities that nuclear power stations could be developed there, largely alongside existing facilities. Eight locations were agreed. Dungeness in my constituency was not expressly ruled out, but it was not included at that time. I have tried to be an advocate for looking at what is possible for nuclear sites such as Dungeness, and not just looking to say, “Well, if they can’t accommodate a nuclear reactor the size of Hinkley Point C or Sizewell C then there is no future for them at all.”
Does that not indicate why there ought to be greater latitude in particular when considering small modular reactors, and preferably those produced in the United Kingdom?
I completely agree with the right hon. Gentleman. I will come on to that in more detail—that is normally an excuse to say I am not going to answer his question, but I wholeheartedly agree with what he says and I want to give it some attention as I go through my remarks.
The advent of advanced nuclear technologies and small modular reactors is the big thing that is different now compared to 2011. They give us more flexibility in the technologies that can be deployed. I also agree with the premise of the right hon. Gentleman’s point: this is exciting not just because it opens up new opportunities for nuclear power in the UK, but because it creates an opportunity for a renaissance in the civil nuclear industry in the UK. It is particularly exciting to see British firms such as Rolls-Royce leading the development and design of new small modular technologies. While the Government have their competition to identify best bets in terms of technologies to invest in, we need to look not just at the unit price of that technology, but at the wider impact and benefit to the UK economy of investing in the new technology, in particular the modular reactors that can be factory built and assembled. They can be designed not just to meet our energy demand; they could also be an export industry for the future for the UK. That is an incredibly important part of the equation.
In designing the civil nuclear road map and through the creation of Great British Nuclear, the Government have tried to make it as easy as possible for the industry to work with the Government, to understand what the Government’s needs and objectives are, and to understand the technologies that they may seek to invest in. I think all of that is welcomed. Certainly, the people in the industry I have spoken to welcome that step, which creates a degree of certainty. We are looking at far more players to be involved in the UK nuclear market than was the case in the past, with a far greater range of technologies and different businesses investing in them and developing them in the UK, Europe, the United States and further afield. This is all to be welcomed and encouraged.
I appreciate why it is difficult for the Government now, as it would have been in the past, to say, “These are the technologies that we know with certainty we can back” because the range is so great, but nevertheless we need to give certainty to the market and investors. The Government’s competition for SMRs is also important, but there will be developers of technologies that do not necessarily require Government subsidy and support, but simply seek sites where they can deploy their technology and know they connect to the grid.
The hon. Gentleman talks about the competition. I would also mention the time it is taking. Is the underlying problem not that while we have a manufacturer with a proven capacity to produce modular reactors, as it has been doing for the Royal Navy for many decades, the United States is out there selling its technology with the full backing of the US Government and their various departments right the way across Europe and other parts of the world? We are just considering it. Are we not hobbling British industry and the possibility of us being involved, as he rightly said, in this exciting new development?
I am sure the Minister will speak for himself on that particular point, but that is not a characterisation I would share. What the competition and Great British Nuclear are doing is giving a very strong signal to businesses such as Rolls-Royce not only that this is a sound technology to invest in, but that there is potentially a very robust market for it in the UK. That is what I would like to see and why I said earlier that when these technologies are considered we need to think about the broader impact on UK manufacturing and jobs that supporting and backing these technologies would bring, not just the manufacture of modular reactors and electricity.
I have met Rolls-Royce and seen its SMR plans and designs. They are incredibly exciting. As the right hon. Gentleman says, this is technology that has been developed for the Royal Navy, and its applications for civil nuclear are very exciting indeed. I hope that it is very successful with it. I would certainly be very happy to see a Rolls-Royce SMR in my constituency at Dungeness.
I do support the introduction of small modular reactors, but I hope the House would not want Rolls-Royce to be given preferential treatment by the Office for Nuclear Regulation in its generic design assessment, because we need to ensure that it is safe. Does my hon. Friend agree that while Sizewell C is now getting under way, it is important that the contractors do honour what they say they will do, such as sourcing the water and ensuring that skills and jobs are happening locally, in order to give people confidence? We know how long these projects have taken to get off the ground.
I agree with my right hon. Friend, particularly on her point about the labour markets, and in the Sizewell area that is incredibly important. I know from Dungeness in my constituency that it is the certainty of having long-term employment that attracts some of the best talent and encourages people, including apprentices, to join the industry. The Minister will probably want to comment on the substance of my right hon. Friend’s remarks.
In the time available to me, I want focus on the site lists consultations element of the civil nuclear road map. The Government are saying that the criteria that were applied to nuclear sites in 2011 should still apply today, and in most cases that is true. Safety, access to water—where appropriate—and grid connections could all be important considerations when it is being decided where the sites could be, along with habitat implications and, in coastal areas, flood risk. All those are constants. The one factor that has completely changed since 2011 is the size of the footprint of the nuclear facility itself.
In Dungeness, an important factor has been the existence of a special protected area as a consequence of the unique shingle peninsula on which it sits, which is the second biggest in the world and a habitat that is unique in Europe, let alone the UK—the biggest shingle peninsula in the world is Cape Canaveral, in the United States. The protections are there for areas of the shingle banks that have never been disturbed. However, there are plenty of areas surrounding existing nuclear sites that are, in effect, brownfield sites where that disturbance has taken place. As they are not in special protected areas, I believe that future development would be possible.
The hon. Gentleman is advancing a powerful argument. If we are to persuade people that SMRs are suitable for use outside conventional nuclear sites, siting them in places such as Dungeness and Trawsfynydd which do not fit under the 2011 list conveys an important message. We have to be able to persuade people that small modular reactors can be used in other areas, as well as not misusing sites that might be better used for larger nuclear projects.
I completely agree. I have a request to make to the Government, who will be considering the responses to the consultation on the road map. I was keen to hold this debate now, during the period of the consultation, so that Members can have their own views as well. I appreciate that it would not be easy or desirable for Great British Nuclear to make technology-by-technology recommendations for every nuclear site in the country, but there should be a recognition of footprint size. There are sites, such as Dungeness in my constituency and Sizewell in that of my right hon. Friend the Member for Suffolk Coastal (Dr Coffey), where smaller facilities could easily be built. They could be built on decommissioned land, where old power stations have been subject to advance decommissioning. They could be built on land that was used as the building works site for the construction of the existing Dungeness B station, or even on the land that is currently a car park for the existing nuclear stations.
We need to give the market some certainty that buildings of a certain size can sit within the footprint of an existing nuclear site, on land that does not have the highest levels of habitat protection, but at present that is not envisaged. What the consultation envisages is that every site on the list must be able to do everything. If there is to be no distinguishing feature between different sources of technology, we are not distinguishing between a single SMR unit and something as big as Hinkley Point C. There must clearly be some relaxation, because otherwise other sites that are currently among the eight locations on the existing list will not be included on the new list.
The industry will have an opportunity to come forward with recommendations to the Department and make a case for individual sites—but obviously without the certainty of knowing that it is believed that technologies below a certain footprint would be suitable there—and to take into account all the other important site considerations such as the local workforce, grid connections, access to water for cooling if it is required.
I think it would be much better if, following the consultation on the civil nuclear road map, we could provide certainty about the types of technology that are possible on some of the smaller sites, so that developers and businesses coming forward with those technologies would know they look with confidence at some of those sites. I think that would make a huge difference to sites such as Dungeness, which in other respects ticks every box in respect of its suitability for new nuclear. It is on the grid, it has a domestic labour market, and it has strong support from the local community. In almost every case, the existing nuclear sites are the most supportive of investments in new nuclear, because people are already familiar with the industry and know how many jobs would be created.
If the Minister could say something about this today it would be much appreciated, but I should certainly like it to feature in the Government’s response to the consultation. As I said earlier, I am not seeking site-specific information about each technology, of which there could be many more in the future, but I hope it will at least be recognised that the big difference between SMRs and reactors the size of Hinkley Point is literally that: their size. SMRs will not be suitable everywhere—in fact, they will be suitable in relatively few places—but other technologies will be suitable on a wider base. If the Government are to meet their target, they will have to do so by deeming sites that are not currently being deployed to be suitable for SMRs. We should give the industry as much backing as possible in making that investment.
I am grateful to the Minister for what he has said and, as he alluded to in his remarks, for visiting both Dungeness power station and the Pilot Inn at Dungeness. Both were welcome visits for the local community. I thank all the Members who spoke in this debate, in particular my right hon. Friend the Member for Ludlow (Philip Dunne), the Chair of the Select Committee.
The issues on which the right hon. Member for Dwyfor Meirionnydd (Liz Saville Roberts) and I are in lockstep are probably not numerous, but this is one of them. As the Minister just said at the Dispatch Box and as is in the road map document, we recognise that to achieve the Government’s aims, we need more nuclear sites than are currently in the planning framework. Those nuclear sites will probably be other nuclear sites that already have the technology and the connections but, for whatever reason, were not suitable in the 2011 list but will be in future. Moving forward, if the Government say, “We know we need extra sites”, it will be helpful to give some idea of where they might be.
Question put and agreed to.
Resolved,
That this House has considered the civil nuclear roadmap.
(11 months, 1 week ago)
Commons ChamberTidal received money for the very first time through the last auction round in the contracts for difference process. This Government are investing in tidal technologies, wind, solar, hydrogen, carbon capture and storage, continued exploration for oil and gas—which the hon. Lady’s party opposes—and nuclear. Of course, it is fantastic news for her constituents and the businesses around Scotland that are winning contracts to invest in renewables. What, to their shame, Scottish National party representatives in this place never mention is the hundreds of thousands of jobs in Scotland that depend on the nuclear industry—manufacturing, construction, education and the fantastic work going on right now in Torness, the only generating power station in Scotland currently delivering power to 1 million homes. Perhaps the Scottish National party will come to the Chamber and explain how, when that power station closes down—as sadly and inevitably one day it will—they will replace the power generated for Scottish homes under their plans to completely ignore this safe, secure and clean option for secure future energy.
I welcome the civil nuclear road map, in particular the recognition that we will need additional nuclear sites to those in the existing policy framework. Does the Minister agree that there is one big difference between a gigawatt reactor and an SMR—gigawatt reactors are very big, and SMRs are comparatively quite small? Therefore, does he believe that we need to consider smaller sites such as Dungeness in my constituency, which could be very suitable for such technologies as SMRs?
Again, I welcome my hon. Friend’s support and I thank him for hosting me on a visit to Dungeness—the fish and chips were exquisite. I agree that we will look at every site and possible site and judge them on the basis of what type of technology could be built there. That will benefit his community, communities around the country and the United Kingdom more widely.