Govia Thameslink and Network Rail Debate

Full Debate: Read Full Debate
Department: Department for Transport

Govia Thameslink and Network Rail

Chuka Umunna Excerpts
Wednesday 16th March 2016

(8 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Claire Perry Portrait Claire Perry
- Hansard - - - Excerpts

I am happy to confirm again that I have committed to roll out free wi-fi in all classes of train travel across England by 2018. Trains coming on to the franchises will be fitted with wi-fi as a matter of course, and trains that are already running will be retrofitted. I hope constituents who are not stuck on trains for longer than their train times will also be able to do some productive work. Wi-fi is an important addition to the landscape.

We always knew it would be tough with London Bridge and Thameslink. Despite what some might say is long-term disruption on the line and fare changes, we have seen incredible amounts of growth on the railway. In fact, travel from Horsham, for example, is up 40% in the past 10 years, so more and more people are getting on trains right across the country. Frankly, successive Governments have neglected to invest in infrastructure. We have all ducked our collective responsibility to invest in trains to get people moving effectively and efficiently around the country. It is vital that we keep the investment programmes growing, because we are now seeing some of the problems associated with passenger growth on lines that have not been invested in.

Underlying all that is a problem that is a little more sinister: even when Thameslink is running—when all the trains are rolling, the system looks great and the stations are open—we still have persistent, daily failures of the infrastructure the trains are running over. Our constituents do not care whose fault it is, and nor should they—that is my job, or at least my Department’s—but around 60% of delays are the result of infrastructure failures such as points failing, signals failing or other things going wrong. That is intolerable. Not only is it intolerable on a daily basis, but the Thameslink programme, which will deliver 24 trains an hour through the centre of London, north to south, will not be able to operate unless those infrastructure problems are sorted out.

The focus for my Department has been working together with Network Rail and the operators, including Southeastern, but I am afraid there is no magic bullet. There is no one thing we can all do. It is about a relentless focus on the day-to-day details of running a railway; and ensuring that, in the morning, trains come out of the depot on time to the second, and that, if there is a problem, it is fixed in the minimum amount of time. People may ask, “Surely that’s just railway 101—why hasn’t it happened?” Of course, it has happened, but the problem is that, under both public and private ownership, the customers have not mattered enough.

Members might be surprised to hear that no measure of lost customer time has ever existed on our railways, other than briefly on the London underground. That is inexcusable. My hon. Friend the Member for Horsham made the valid point that it is the human cost of failure that is so hard, as well as the productivity loss of making millions of people late, day in, day out. We have a record programme of investment in transport infrastructure—it was added to in the Budget today, which I welcome—and it is being done to drive up the productivity of the country, but nobody has ever captured the productivity loss from not running the trains on time. Members will be pleased to hear that I am devoting considerable time to that. I want the volume of people being carried on that part of the railway to really count, so that when infrastructure programmes need to be sorted out, there is even more emphasis on sorting them out. We are absolutely committed to doing that collectively.

Many Members raised driver shortages, which is a historical problem for the franchise. It has been run on a shoestring, with the number of drivers about 6% or 7% below what was required. That sounds like a small difference, but, on a very busy railway, if one driver is not there to run one train, there is an infection of delay right across the network. On its current recruitment plans, which are the biggest in the country, GTR will reach the minimum level—the operational level—in August this year. We have asked it to go further than that by recruiting more so that there is resilience in the system, and it is on track to do that. That is vital.

Several Members made important points about ticketing offices and smart ticketing. A consultation on ticket office changes is going on. Nothing can happen without the Department’s say-so. The future of travel in this country is not orange bits of paper but digital ticketing information being delivered to us through whatever device we choose. In some cases, that might be a bar code printed out on a piece of paper, although as the hon. Member for Luton North (Kelvin Hopkins) said, many customers like to buy a ticket from a person, or at least have some interaction.

We have already invested more than £30 million in the south-east flexible ticketing programme, and there are tens of millions of pounds of further commitment to come. That money has been invested to ensure that the franchises, of which GTR is the flagship, can implement the technology, have the back office and gate their stations so that the Key card—the smart card system—can work. If the Key card system were working, there might be an argument for getting people out from behind ticket office counters and on to the front lines, but I will commit today to having a deep-dive conversation with my officials and the franchise so that we can get to grips with where it is on the roll-out of the Key card and how that relates to ticket office closing hours. If we are going to do smart ticketing, let us do it right.

Chuka Umunna Portrait Mr Chuka Umunna (Streatham) (Lab)
- Hansard - -

I congratulate the hon. Member for Horsham (Jeremy Quin) on securing this debate. The Minister is right that the Budget debate is ongoing; I want to take this opportunity to say that we in Streatham welcome the green light being given to Crossrail 2, but we want it to come to Streatham.

On ticket offices, it is totally and utterly unacceptable that the three stations in my constituency affected by the franchise will be losing more than 13 staff. It is all well and good telling people to go to the machine, but the problem is that the machines are not giving people the best prices that they are entitled to.

Claire Perry Portrait Claire Perry
- Hansard - - - Excerpts

To be clear to the hon. Gentleman, the proposal is to do what Transport for London has done very successfully: train us all to use a reliable alternative system and then take people out and put them on the gate lines to help us. That is 21st century travel and I support it, and I hope he does too. I am afraid he will have to join the queue for lobbying on Crossrail locations.